Industrialised Building System (IBS) Plan of Work

Year 2016, Volume: 6 Issue: 7, 299 - 305, 01.08.2016

Abstract

Industrialised Building Systems (IBS) is a term used to describe construction method that produced building components manufactured in a factory, transported and assembled into a structure using appropriate machinery and equipment with minimal workers on site. The project life cycle is a project independent series of activities that commences from the starting point until the moment it was successfully delivered. Generally in a construction project, the phases or stages are initiating, planning, executing, monitoring and controlling as well as the closing stage. This paper is part of an on-going research on the Industrialised Building System (IBS) project management life cycle through the IBS approach in the Malaysian construction industry. The data and information presented is the review of the available relevant literature on this research topic. This paper incorporates an analysis of the definitions and IBS/Off-Site plan of work or similar to it outside Malaysia. The identification of the plan/cycle from the analysis is critically essential to becoming the fundamental foundation for further research into the subject matter. It is hoped that at the end of the core research, industry players will be provided with a guideline that adopts a concept of “cradle to grave” in managing IBS throughout its plan of work/ life cycle.

There are 0 citations in total.

Details

Other ID JA99VK39MP
Journal Section Research Article
Authors

Mohd Reeza Yusof This is me

Muhamad Faiz Musa This is me

Noor Sahidah Samsudin This is me

Mohammad Fadhil Mohammad This is me

Mohd Nurfaisal Baharuddin This is me

Publication Date August 1, 2016
Published in Issue Year 2016 Volume: 6 Issue: 7

Cite

APA Yusof, M. R., Musa, M. F., Samsudin, N. S., Mohammad, M. F., et al. (2016). Industrialised Building System (IBS) Plan of Work. International Review of Management and Marketing, 6(7), 299-305.
AMA Yusof MR, Musa MF, Samsudin NS, Mohammad MF, Baharuddin MN. Industrialised Building System (IBS) Plan of Work. IRMM. August 2016;6(7):299-305.
Chicago Yusof, Mohd Reeza, Muhamad Faiz Musa, Noor Sahidah Samsudin, Mohammad Fadhil Mohammad, and Mohd Nurfaisal Baharuddin. “Industrialised Building System (IBS) Plan of Work”. International Review of Management and Marketing 6, no. 7 (August 2016): 299-305.
EndNote Yusof MR, Musa MF, Samsudin NS, Mohammad MF, Baharuddin MN (August 1, 2016) Industrialised Building System (IBS) Plan of Work. International Review of Management and Marketing 6 7 299–305.
IEEE M. R. Yusof, M. F. Musa, N. S. Samsudin, M. F. Mohammad, and M. N. Baharuddin, “Industrialised Building System (IBS) Plan of Work”, IRMM, vol. 6, no. 7, pp. 299–305, 2016.
ISNAD Yusof, Mohd Reeza et al. “Industrialised Building System (IBS) Plan of Work”. International Review of Management and Marketing 6/7 (August 2016), 299-305.
JAMA Yusof MR, Musa MF, Samsudin NS, Mohammad MF, Baharuddin MN. Industrialised Building System (IBS) Plan of Work. IRMM. 2016;6:299–305.
MLA Yusof, Mohd Reeza et al. “Industrialised Building System (IBS) Plan of Work”. International Review of Management and Marketing, vol. 6, no. 7, 2016, pp. 299-05.
Vancouver Yusof MR, Musa MF, Samsudin NS, Mohammad MF, Baharuddin MN. Industrialised Building System (IBS) Plan of Work. IRMM. 2016;6(7):299-305.