IMPLEMENTATION OF THE UPFC CONTROLLER TEST EQUIPMENT

Volume: 8 Number: 2 January 2, 2012
  • Aihong Tang
  • Xie Pıng
EN

IMPLEMENTATION OF THE UPFC CONTROLLER TEST EQUIPMENT

Abstract

IMPLEMENTATION OF THE UPFC CONTROLLER TEST EQUIPMENT

Keywords

References

  1. C. Schauder, L. Gyugyi, E. Stacey, M.Lund, AEP UPFC project: installation, commissioning and operation of the ±160MVA statcom (phase I) [J]. IEEE Transactions on Power Delivery, Vol: 13, No: 4, pp. 1530-1535,
  2. Manzar Rahman, Mohammed Ahmed, Richard Gutman, “UPFC Application on the AEP System: Planning Considerrations”. IEEE Transactions on Power Systems, Vol. 12, No. 4, P1695-1701. November 1997.
  3. Tang Ai-hong, Cheng Shi-jie. DYNAMIC SIMULATION MODEDL OF UNIFIED POWER FLOW CONTROLLER BASED ON PSCAD/EMTDC [J]. Power system technology, Vol: 29, No: 16, pp.6-10, 2005. Writer introduction:
  4. Tang Aihong, PH.D candidate, engaged in the operation and control of power system. Xie Ping, Engineer, engaged in computer control and datum management. Postal address: The School of Automation, Wuhan University of Technology, Hubei, Wuhan, P. R. China. 430070 Tel: 13886022424
  5. E-mail: tah@mail.whut.edu.cn

Details

Primary Language

English

Subjects

-

Journal Section

-

Authors

Aihong Tang This is me

Xie Pıng This is me

Publication Date

January 2, 2012

Submission Date

January 2, 2012

Acceptance Date

-

Published in Issue

Year 2008 Volume: 8 Number: 2

APA
Tang, A., & Pıng, X. (2012). IMPLEMENTATION OF THE UPFC CONTROLLER TEST EQUIPMENT. IU-Journal of Electrical & Electronics Engineering, 8(2), 617-620. https://izlik.org/JA94AT75NU
AMA
1.Tang A, Pıng X. IMPLEMENTATION OF THE UPFC CONTROLLER TEST EQUIPMENT. IU-Journal of Electrical & Electronics Engineering. 2012;8(2):617-620. https://izlik.org/JA94AT75NU
Chicago
Tang, Aihong, and Xie Pıng. 2012. “IMPLEMENTATION OF THE UPFC CONTROLLER TEST EQUIPMENT”. IU-Journal of Electrical & Electronics Engineering 8 (2): 617-20. https://izlik.org/JA94AT75NU.
EndNote
Tang A, Pıng X (January 1, 2012) IMPLEMENTATION OF THE UPFC CONTROLLER TEST EQUIPMENT. IU-Journal of Electrical & Electronics Engineering 8 2 617–620.
IEEE
[1]A. Tang and X. Pıng, “IMPLEMENTATION OF THE UPFC CONTROLLER TEST EQUIPMENT”, IU-Journal of Electrical & Electronics Engineering, vol. 8, no. 2, pp. 617–620, Jan. 2012, [Online]. Available: https://izlik.org/JA94AT75NU
ISNAD
Tang, Aihong - Pıng, Xie. “IMPLEMENTATION OF THE UPFC CONTROLLER TEST EQUIPMENT”. IU-Journal of Electrical & Electronics Engineering 8/2 (January 1, 2012): 617-620. https://izlik.org/JA94AT75NU.
JAMA
1.Tang A, Pıng X. IMPLEMENTATION OF THE UPFC CONTROLLER TEST EQUIPMENT. IU-Journal of Electrical & Electronics Engineering. 2012;8:617–620.
MLA
Tang, Aihong, and Xie Pıng. “IMPLEMENTATION OF THE UPFC CONTROLLER TEST EQUIPMENT”. IU-Journal of Electrical & Electronics Engineering, vol. 8, no. 2, Jan. 2012, pp. 617-20, https://izlik.org/JA94AT75NU.
Vancouver
1.Aihong Tang, Xie Pıng. IMPLEMENTATION OF THE UPFC CONTROLLER TEST EQUIPMENT. IU-Journal of Electrical & Electronics Engineering [Internet]. 2012 Jan. 1;8(2):617-20. Available from: https://izlik.org/JA94AT75NU