River flooding is one of the most frequent
natural hazards in Albania. The area which is more vulnerable from river
flooding is the area located in the county of Shkodra, in the northern part.
This area has been significantly affected from flooding of Buna River in the
recent years. Buna River, with a total length of around 44 km, collects the
water from an important water system in Albania, composed of Shkodra Lake and
Drini River, for which a flood model has been set-up using the HEC-RAS
hydraulic software, based on the digital terrain model in WGS-84 coordinate
system developed from the topographic survey made from both countries Albania
and Montenegro. The hydraulic model built for Buna
River have been calibrated using the trial and error method,  reducing the difference between computed and observed
water levels, by manually changing hydraulic roughness coefficients, M
anning’s “n” values
for the main channel and the overbank area.
Model
performance during the calibration phase it is evaluated through both
qualitative and quantitative measures, including both graphical comparisons of
calculated and measured water levels and statistical tests.
For the Buna River, the water levels modelled by HEC-RAS are in fairly
good agreement with the observed data

from online station
. The
values of the model error chosen to evaluate the performance of the hydraulic
model after calibration process for low-flow and high- flow are quite
satisfactory.

References

  • Abazi E, (2016) Setting Up a Mathematical Model for Buna River Using HEC-RAS. Bulletin of Technical Sciences, Polytechnic University of Tirana. No.1
  • Academy of Sciences of Albania (ASA) and Academy of Art and Sciences of Montenegro (MASA) (2006) Topo-geodetic measures of Buna river, Joint Project Albania-Montenegro.
  • Chow VT, (1959). Open Channel Hydraulics. McGraw-Hill Book Co. New York, NY, USA.
  • Duda PB, Hummel P, Jr.Donigian AS, Imhoff JC, (2012) Model use, calibration, and validation. Am. Soc. Agricul. & Bio. Engin.. 55, 1523-1547.
  • German Federal Enterprise for International Cooperation (GIZ).(2014) Climate Change Adaptation in Western Balkans Establishment of a Flood Early Warning System in the Drin-Buna Basin.
  • Hoxha F, Stratobërdha P, Xhelepi S, Pandazi S, Lami S, Abazi E, (2005) Management Study of Lezha Water System, National Project for Research and Development, Natural Resources PN.5, Centre of Hydraulic Research, Academy of Science of Albania.
  • Hoxhaj F, Abazi E, Zaimi K, Vako E, (2015) Development of Hydrological and hydraulic study of regulation of Shkodra Lake and Buna River water regime, IPA Project, Academy of Sciences of Albania and Academy of Art and Sciences of Montenegro.
  • US Army Corps of Engineers (USACE) (2010) Hydrologic Engineering Center. HEC-RAS. Users Manual. Version 4.1.
  • Hydro-meteorological Institute of Albania (IHM), Academy of Science of Albania, (1984) Hydrology of Albania. Albania.
  • Pandazi S, Abazi E, (2011) Regulation of the hydraulic regime of the water system of Shkodra Lake, Buna and Drini River, Project from the Agency of Research, Technology and Innovation, Institute of Energy, Water and Environment.
  • Refsgaard, JC, Henriksen, HJ, (2004) Modelling guidelines–terminology and guiding principles. Advances in Water Resources. 27 (1), 71–82.
  • Solomatine D, (2003) Data- driven modeling: machine learning, data mining and knowledge discovery. IHE, Delft, Netherland -Lecture Notes.
  • Stratobërdha P, Xhelepi S, Pandazi S, Lami S, Abazi E, (2002) Study of the effect of discharges from Bushati Hydropower in the water system of Shkodra Lake, Buna and Drini River. Project of Albanian Government, Centre of Hydraulic Research, Academy of Science of Albania.
  • Vidal JP, Moisan S, Faure JB, Dartus D, (2005) Towards a reasoned 1D river model calibration, Journal of Hydroinformatics, 7(2), 79-89.
  • Vidal JP, Moisan S, Faure JB, Dartus D, (2007), River model calibration, from guidelines to operational support tools. Environmental Modelling & Software, 22, 1628-1640.
  • World Bank (2014) Albania Disaster Risk Mitigation and Adaptation - Modernization of the meteorological and hydrologic national network.
Year 2016, Volume: 11 Issue: 2, 198 - 206, 30.06.2016

Abstract

References

  • Abazi E, (2016) Setting Up a Mathematical Model for Buna River Using HEC-RAS. Bulletin of Technical Sciences, Polytechnic University of Tirana. No.1
  • Academy of Sciences of Albania (ASA) and Academy of Art and Sciences of Montenegro (MASA) (2006) Topo-geodetic measures of Buna river, Joint Project Albania-Montenegro.
  • Chow VT, (1959). Open Channel Hydraulics. McGraw-Hill Book Co. New York, NY, USA.
  • Duda PB, Hummel P, Jr.Donigian AS, Imhoff JC, (2012) Model use, calibration, and validation. Am. Soc. Agricul. & Bio. Engin.. 55, 1523-1547.
  • German Federal Enterprise for International Cooperation (GIZ).(2014) Climate Change Adaptation in Western Balkans Establishment of a Flood Early Warning System in the Drin-Buna Basin.
  • Hoxha F, Stratobërdha P, Xhelepi S, Pandazi S, Lami S, Abazi E, (2005) Management Study of Lezha Water System, National Project for Research and Development, Natural Resources PN.5, Centre of Hydraulic Research, Academy of Science of Albania.
  • Hoxhaj F, Abazi E, Zaimi K, Vako E, (2015) Development of Hydrological and hydraulic study of regulation of Shkodra Lake and Buna River water regime, IPA Project, Academy of Sciences of Albania and Academy of Art and Sciences of Montenegro.
  • US Army Corps of Engineers (USACE) (2010) Hydrologic Engineering Center. HEC-RAS. Users Manual. Version 4.1.
  • Hydro-meteorological Institute of Albania (IHM), Academy of Science of Albania, (1984) Hydrology of Albania. Albania.
  • Pandazi S, Abazi E, (2011) Regulation of the hydraulic regime of the water system of Shkodra Lake, Buna and Drini River, Project from the Agency of Research, Technology and Innovation, Institute of Energy, Water and Environment.
  • Refsgaard, JC, Henriksen, HJ, (2004) Modelling guidelines–terminology and guiding principles. Advances in Water Resources. 27 (1), 71–82.
  • Solomatine D, (2003) Data- driven modeling: machine learning, data mining and knowledge discovery. IHE, Delft, Netherland -Lecture Notes.
  • Stratobërdha P, Xhelepi S, Pandazi S, Lami S, Abazi E, (2002) Study of the effect of discharges from Bushati Hydropower in the water system of Shkodra Lake, Buna and Drini River. Project of Albanian Government, Centre of Hydraulic Research, Academy of Science of Albania.
  • Vidal JP, Moisan S, Faure JB, Dartus D, (2005) Towards a reasoned 1D river model calibration, Journal of Hydroinformatics, 7(2), 79-89.
  • Vidal JP, Moisan S, Faure JB, Dartus D, (2007), River model calibration, from guidelines to operational support tools. Environmental Modelling & Software, 22, 1628-1640.
  • World Bank (2014) Albania Disaster Risk Mitigation and Adaptation - Modernization of the meteorological and hydrologic national network.
There are 16 citations in total.

Details

Primary Language English
Subjects Engineering
Journal Section Articles
Authors

Elona Abazi

Publication Date June 30, 2016
Acceptance Date June 2, 2016
Published in Issue Year 2016 Volume: 11 Issue: 2

Cite

APA Abazi, E. (2016). Calibration of Hydraulic Model for Buna River. Journal of International Environmental Application and Science, 11(2), 198-206.
AMA Abazi E. Calibration of Hydraulic Model for Buna River. J. Int. Environmental Application & Science. June 2016;11(2):198-206.
Chicago Abazi, Elona. “Calibration of Hydraulic Model for Buna River”. Journal of International Environmental Application and Science 11, no. 2 (June 2016): 198-206.
EndNote Abazi E (June 1, 2016) Calibration of Hydraulic Model for Buna River. Journal of International Environmental Application and Science 11 2 198–206.
IEEE E. Abazi, “Calibration of Hydraulic Model for Buna River”, J. Int. Environmental Application & Science, vol. 11, no. 2, pp. 198–206, 2016.
ISNAD Abazi, Elona. “Calibration of Hydraulic Model for Buna River”. Journal of International Environmental Application and Science 11/2 (June 2016), 198-206.
JAMA Abazi E. Calibration of Hydraulic Model for Buna River. J. Int. Environmental Application & Science. 2016;11:198–206.
MLA Abazi, Elona. “Calibration of Hydraulic Model for Buna River”. Journal of International Environmental Application and Science, vol. 11, no. 2, 2016, pp. 198-06.
Vancouver Abazi E. Calibration of Hydraulic Model for Buna River. J. Int. Environmental Application & Science. 2016;11(2):198-206.

“Journal of International Environmental Application and Science”