Research Article

A MULTI-CRITERIA EVALUATION FRAMEWORK FOR ALTERNATIVE MARMARAY TIMETABLE STRATEGIES UNDER FUZZY PASSENGER DEMAND

Volume: 10 Number: 2 October 20, 2026

A MULTI-CRITERIA EVALUATION FRAMEWORK FOR ALTERNATIVE MARMARAY TIMETABLE STRATEGIES UNDER FUZZY PASSENGER DEMAND

Abstract

In Istanbul, a metropolitan city characterized by intense traffic congestion, it is critically important to effectively meet passenger demand in order to provide a more comfortable and efficient transportation service. The Marmaray Line, as one of the most significant alternative rail systems designed to alleviate urban traffic congestion, has experienced a continuous increase in passenger capacity. Therefore, optimizing its operational performance has become essential. In this study, as an alternative to the existing timetable of the Marmaray Line, station congestion rates, train loading ratios, and passenger volume parameters were calculated using the indices defined within the study framework. Based on the projections obtained from these calculations, a new timetable was developed by incorporating fuzzy alighting and boarding rates instead of deterministic passenger flow assumptions. Subsequently, the timetable was improved through the formulation of an appropriate objective function and relevant constraints in order to obtain a superior alternative strategy vector. The proposed model was further solved using a Genetic Algorithm approach to enhance solution quality and robustness. The findings indicate that the proposed alternative scheduling strategy outperforms the existing system in terms of congestion reduction, capacity utilization, and overall operational efficiency

Keywords

References

  1. Amit, I., & Goldfard, D. (1971). The Timetable Problem for Railways, Development in Operations Research,. Gordon and Breach, New York, 379-387.
  2. Barrena, E., Coelho, D. C., & Laporte, G. (2014). Single-Line Rail Rapid Transit Timetabling Under Dynamic Passenger Demand. Transportation Research Part B: Methodological, 134-150.
  3. Binder, S., Maknoon, Y., & Bierlaire, M. (2017). he Multi-Objective Railway Timetable Rescheduling Problem. Transportation Research Part C: Emerging Technologies, 78-94.
  4. Cacchiani, V., Caprara, A., & Fischetti, M. (2012). A Lagrangian Heuristic for Robustness, with an Application to Train Timetabling. Transportation Science, 124-133.
  5. Can, T. (2019). Matematik 1, Nedensellik Üzerine Diyaloglar. İstanbul: Beta.
  6. Chai, S., Yin, J., D’Ariano, A., Samà, M., & Tang, T. (2023). Train schedule optimization for commuter-metro networks. Transportation Research Part C: Emerging Technologies, 155.
  7. Charnes, A., & Miller, M. H. (1956). A Model For The Optimal Programming of Railway Freight Train Movements. Management Science, 3(1), 74-92.
  8. Chung, J. W., Oh, S. M., & Choi, I. C. (2009). A Hybrid Genetic Algorithm for Train Sequencing in the Korean Railway. Omega(37), 555–565.

Details

Primary Language

English

Subjects

Econometrics (Other)

Journal Section

Research Article

Publication Date

October 20, 2026

Submission Date

February 22, 2026

Acceptance Date

June 2, 2026

Published in Issue

Year 2026 Volume: 10 Number: 2

APA
Kistik, V., & Can, T. (2026). A MULTI-CRITERIA EVALUATION FRAMEWORK FOR ALTERNATIVE MARMARAY TIMETABLE STRATEGIES UNDER FUZZY PASSENGER DEMAND. Journal of Research in Economics, 10(2), 156-178. https://doi.org/10.29228/JORE.59
AMA
1.Kistik V, Can T. A MULTI-CRITERIA EVALUATION FRAMEWORK FOR ALTERNATIVE MARMARAY TIMETABLE STRATEGIES UNDER FUZZY PASSENGER DEMAND. JORE. 2026;10(2):156-178. doi:10.29228/JORE.59
Chicago
Kistik, Vildan, and Tuncay Can. 2026. “A MULTI-CRITERIA EVALUATION FRAMEWORK FOR ALTERNATIVE MARMARAY TIMETABLE STRATEGIES UNDER FUZZY PASSENGER DEMAND”. Journal of Research in Economics 10 (2): 156-78. https://doi.org/10.29228/JORE.59.
EndNote
Kistik V, Can T (October 1, 2026) A MULTI-CRITERIA EVALUATION FRAMEWORK FOR ALTERNATIVE MARMARAY TIMETABLE STRATEGIES UNDER FUZZY PASSENGER DEMAND. Journal of Research in Economics 10 2 156–178.
IEEE
[1]V. Kistik and T. Can, “A MULTI-CRITERIA EVALUATION FRAMEWORK FOR ALTERNATIVE MARMARAY TIMETABLE STRATEGIES UNDER FUZZY PASSENGER DEMAND”, JORE, vol. 10, no. 2, pp. 156–178, Oct. 2026, doi: 10.29228/JORE.59.
ISNAD
Kistik, Vildan - Can, Tuncay. “A MULTI-CRITERIA EVALUATION FRAMEWORK FOR ALTERNATIVE MARMARAY TIMETABLE STRATEGIES UNDER FUZZY PASSENGER DEMAND”. Journal of Research in Economics 10/2 (October 1, 2026): 156-178. https://doi.org/10.29228/JORE.59.
JAMA
1.Kistik V, Can T. A MULTI-CRITERIA EVALUATION FRAMEWORK FOR ALTERNATIVE MARMARAY TIMETABLE STRATEGIES UNDER FUZZY PASSENGER DEMAND. JORE. 2026;10:156–178.
MLA
Kistik, Vildan, and Tuncay Can. “A MULTI-CRITERIA EVALUATION FRAMEWORK FOR ALTERNATIVE MARMARAY TIMETABLE STRATEGIES UNDER FUZZY PASSENGER DEMAND”. Journal of Research in Economics, vol. 10, no. 2, Oct. 2026, pp. 156-78, doi:10.29228/JORE.59.
Vancouver
1.Vildan Kistik, Tuncay Can. A MULTI-CRITERIA EVALUATION FRAMEWORK FOR ALTERNATIVE MARMARAY TIMETABLE STRATEGIES UNDER FUZZY PASSENGER DEMAND. JORE. 2026 Oct. 1;10(2):156-78. doi:10.29228/JORE.59

Journal of Research in Economics is licensed under Creative Commons Attribution-NonCommercial 4.0 International (CC BY-NC 4.0)

JORE is indexed in ECONLIT, EBSCO and BASE.

 28139  28138  download?token=eyJhdXRoX3JvbGVzIjpbXSwiZW5kcG9pbnQiOiJmaWxlIiwicGF0aCI6IjhiZmEvMDA4Yy80MDZmLzY5MTZmMWRhMTQxY2M3LjA1MTEzNDQ1LmpwZyIsImV4cCI6MTc2MzExNTA5Miwibm9uY2UiOiJjMjhhMTAzODhjMGVkMTEzN2YxYmEzZDM0ZDJjNWUzMSJ9.qFw4a5L7cCGcJFzt1ICt3HzE6EUInFn9ok64wArbe0U