Research Article

RISK ASSESSMENT WITH MONTE CARLO SIMULATION METHOD IN A HOSPITAL CONSTRUCTION

Volume: 2 Number: 2 December 30, 2018
EN

RISK ASSESSMENT WITH MONTE CARLO SIMULATION METHOD IN A HOSPITAL CONSTRUCTION

Abstract

Risk assessment and hazard identification are important concepts that must be addressed in the field of occupational health and safety. The purpose of this study is to determine the hazards that may arise in the construction of a hospital and assess the risks that may be encountered in terms of occupational health and safety. In order to achieve this purpose, any potential damage or damage that may occur during the construction of the hospital or that may affect the worker or the workplace may be observed and assessed using the Monte Carlo simulation method. These findings obtained by Monte Carlo method will be discussed. Future hospital construction will be accompanied by proposals that could prevent hazards that may arise in terms of occupational health and safety.

Keywords

References

  1. AFEFY, I.H.,2015. Hazard Analysis and Risk Assessments for Industrial Processes Using FMEA and Bow-Tie Methodologies, Industrial Engineering & Management Systems,Vol 14, No 4, pp.379-391.JIANG, Y., NAN, Z., YANG, S.,2013. Risk assessment of water quality using Monte Carlo simulation and artificial neural network method, Journal of Environmental Management,122,130-136.CHEN, H., LI, L., SU,Y.,2014. Risk Assessment of Aero Engine Failure Based on Monte Carlo Simulation, Procedia Engineering, 80, 415 – 423.MANGLA S.,K., KUMAR P.,BARUA, M.K., 2014. Monte Carlo Simulation Based Approach to Manage Risks in Operational Networks in Green Supply Chain, Procedia Engineering, 97, 2186 – 2194.LI, W., ZHOU, J., XIE, K.& XIONG, X.,2008. Power System Risk Assessment Using a Hybrid Method of Fuzzy Set and Monte Carlo Simulation, IEEE TRANSACTIONS ON POWER SYSTEMS,23, 2.

Details

Primary Language

English

Subjects

-

Journal Section

Research Article

Publication Date

December 30, 2018

Submission Date

November 19, 2018

Acceptance Date

December 29, 2018

Published in Issue

Year 2018 Volume: 2 Number: 2

APA
Çabuk, S. (2018). RISK ASSESSMENT WITH MONTE CARLO SIMULATION METHOD IN A HOSPITAL CONSTRUCTION. Journal of Turkish Operations Management, 2(2), 155-160. https://izlik.org/JA55AY68MD
AMA
1.Çabuk S. RISK ASSESSMENT WITH MONTE CARLO SIMULATION METHOD IN A HOSPITAL CONSTRUCTION. JTOM. 2018;2(2):155-160. https://izlik.org/JA55AY68MD
Chicago
Çabuk, Selin. 2018. “RISK ASSESSMENT WITH MONTE CARLO SIMULATION METHOD IN A HOSPITAL CONSTRUCTION”. Journal of Turkish Operations Management 2 (2): 155-60. https://izlik.org/JA55AY68MD.
EndNote
Çabuk S (December 1, 2018) RISK ASSESSMENT WITH MONTE CARLO SIMULATION METHOD IN A HOSPITAL CONSTRUCTION. Journal of Turkish Operations Management 2 2 155–160.
IEEE
[1]S. Çabuk, “RISK ASSESSMENT WITH MONTE CARLO SIMULATION METHOD IN A HOSPITAL CONSTRUCTION”, JTOM, vol. 2, no. 2, pp. 155–160, Dec. 2018, [Online]. Available: https://izlik.org/JA55AY68MD
ISNAD
Çabuk, Selin. “RISK ASSESSMENT WITH MONTE CARLO SIMULATION METHOD IN A HOSPITAL CONSTRUCTION”. Journal of Turkish Operations Management 2/2 (December 1, 2018): 155-160. https://izlik.org/JA55AY68MD.
JAMA
1.Çabuk S. RISK ASSESSMENT WITH MONTE CARLO SIMULATION METHOD IN A HOSPITAL CONSTRUCTION. JTOM. 2018;2:155–160.
MLA
Çabuk, Selin. “RISK ASSESSMENT WITH MONTE CARLO SIMULATION METHOD IN A HOSPITAL CONSTRUCTION”. Journal of Turkish Operations Management, vol. 2, no. 2, Dec. 2018, pp. 155-60, https://izlik.org/JA55AY68MD.
Vancouver
1.Selin Çabuk. RISK ASSESSMENT WITH MONTE CARLO SIMULATION METHOD IN A HOSPITAL CONSTRUCTION. JTOM [Internet]. 2018 Dec. 1;2(2):155-60. Available from: https://izlik.org/JA55AY68MD