ASSESSMENT OF CONSTRUCTION INVESTMENT PROJECTS USING OF ANALYTIC HIERARCHY METHOD

Volume: 7 Number: 1 February 1, 2012
  • Osman Aytekin
  • İlker Özdemir
  • Hakan Kuşan
  • Ömür Tezcan
EN TR

ASSESSMENT OF CONSTRUCTION INVESTMENT PROJECTS USING OF ANALYTIC HIERARCHY METHOD

Abstract

In this study, it has been researched the applicability of AHP method (Analytic Hierarchy Method) that is one of multi-criteria decision-making methods, in assessment of construction investment projects. For this aim, it has been considered an application having shopping center, housing estate and residence alternatives. For application of AHP method, a binary comparison matrices have been established using main criteria which have financial conditions, sales and marketing, location and contribution to firm and related sub-criteria. It has been solved and examined AHP problem using these matrices. As a result, it has been determined that AHP method can easily be used in the construction sector for investment selection of project alternatives and to present multi-faceted decision-making opportunities for decision-making department of construction firms.

Keywords

Details

Primary Language

Turkish

Subjects

-

Journal Section

-

Authors

Osman Aytekin This is me

İlker Özdemir This is me

Hakan Kuşan This is me

Ömür Tezcan This is me

Publication Date

February 1, 2012

Submission Date

August 29, 2014

Acceptance Date

-

Published in Issue

Year 1970 Volume: 7 Number: 1

APA
Aytekin, O., Özdemir, İ., Kuşan, H., & Tezcan, Ö. (2012). İNŞAAT PROJE YATIRIMLARININ DEĞERLENDİRİLMESİNDE ANALİTİK HİYERARŞİ YÖNTEMİNİN KULLANILMASI. Engineering Sciences, 7(1), 229-238. https://doi.org/10.12739/nwsaes.v7i1.5000066883
AMA
1.Aytekin O, Özdemir İ, Kuşan H, Tezcan Ö. İNŞAAT PROJE YATIRIMLARININ DEĞERLENDİRİLMESİNDE ANALİTİK HİYERARŞİ YÖNTEMİNİN KULLANILMASI. Engineering Sciences. 2012;7(1):229-238. doi:10.12739/nwsaes.v7i1.5000066883
Chicago
Aytekin, Osman, İlker Özdemir, Hakan Kuşan, and Ömür Tezcan. 2012. “İNŞAAT PROJE YATIRIMLARININ DEĞERLENDİRİLMESİNDE ANALİTİK HİYERARŞİ YÖNTEMİNİN KULLANILMASI”. Engineering Sciences 7 (1): 229-38. https://doi.org/10.12739/nwsaes.v7i1.5000066883.
EndNote
Aytekin O, Özdemir İ, Kuşan H, Tezcan Ö (February 1, 2012) İNŞAAT PROJE YATIRIMLARININ DEĞERLENDİRİLMESİNDE ANALİTİK HİYERARŞİ YÖNTEMİNİN KULLANILMASI. Engineering Sciences 7 1 229–238.
IEEE
[1]O. Aytekin, İ. Özdemir, H. Kuşan, and Ö. Tezcan, “İNŞAAT PROJE YATIRIMLARININ DEĞERLENDİRİLMESİNDE ANALİTİK HİYERARŞİ YÖNTEMİNİN KULLANILMASI”, Engineering Sciences, vol. 7, no. 1, pp. 229–238, Feb. 2012, doi: 10.12739/nwsaes.v7i1.5000066883.
ISNAD
Aytekin, Osman - Özdemir, İlker - Kuşan, Hakan - Tezcan, Ömür. “İNŞAAT PROJE YATIRIMLARININ DEĞERLENDİRİLMESİNDE ANALİTİK HİYERARŞİ YÖNTEMİNİN KULLANILMASI”. Engineering Sciences 7/1 (February 1, 2012): 229-238. https://doi.org/10.12739/nwsaes.v7i1.5000066883.
JAMA
1.Aytekin O, Özdemir İ, Kuşan H, Tezcan Ö. İNŞAAT PROJE YATIRIMLARININ DEĞERLENDİRİLMESİNDE ANALİTİK HİYERARŞİ YÖNTEMİNİN KULLANILMASI. Engineering Sciences. 2012;7:229–238.
MLA
Aytekin, Osman, et al. “İNŞAAT PROJE YATIRIMLARININ DEĞERLENDİRİLMESİNDE ANALİTİK HİYERARŞİ YÖNTEMİNİN KULLANILMASI”. Engineering Sciences, vol. 7, no. 1, Feb. 2012, pp. 229-38, doi:10.12739/nwsaes.v7i1.5000066883.
Vancouver
1.Osman Aytekin, İlker Özdemir, Hakan Kuşan, Ömür Tezcan. İNŞAAT PROJE YATIRIMLARININ DEĞERLENDİRİLMESİNDE ANALİTİK HİYERARŞİ YÖNTEMİNİN KULLANILMASI. Engineering Sciences. 2012 Feb. 1;7(1):229-38. doi:10.12739/nwsaes.v7i1.5000066883