DECISION-MAKING PROCESS TECHNIQUES USED IN THE OPTIMIZATION OF CONSTRUCTION PROJECTS

Volume: 13 Number: 2 April 21, 2018
TR EN

DECISION-MAKING PROCESS TECHNIQUES USED IN THE OPTIMIZATION OF CONSTRUCTION PROJECTS

Öz

It is desirable that the construction projects can be completed in the most appropriate manner at the desired time, cost or other purposes. If any of these requests are solely aimed, the appropriate project parameters can be determined and the results such as the optimal time or cost can be determined after an optimization process. If more than one goal is to be achieved at the same time, the decision making process becomes more difficult. In this case, rather than a single final result, multiple results can be obtained. A number of techniques are used to optimize both time and cost. In this study, the techniques proposed for this purpose in the literature have been examined and some of these techniques have been applied to the construction projects considered as time-cost problem. Also, the TLBO algorithm, popular in recent years, has been the preferred in the solution of the multi-objective optimization problem. Construction project business activities which are taken into account as a time-cost problem in the literature are examined as numerical examples. A computer program is developed to realize the time-cost trade-off problem by using MATLAB.

Anahtar Kelimeler

References

  1. [1] Bromilow, F.J., (1969). Contract Time Performance Expectation and the Reality. Building Forum, 1(3):70-80.
  2. [2] Le-Hoai, L. and Lee, Y.D., (2009). Time-Cost Relationships of Building Construction Project in Korea. Facilities, 27(13/14):549-559.
  3. [3] Parveen, S. and Saha, S.K. (2012). GA Based Multi-Objective Time-Cost Optimization in a Project with Resources Consideration. International Journal of Modern Engineering Research (IJMER), 2(6):4352-4359.
  4. [4] Rao, R.V., Savsani, V.J., and Vakharia, D.P., (2011). Teaching-Learning Based Optimization: A Novel Method for Constrained Mechanical Design Optimization Problems. Computer-Aided Design, 4:303-315.
  5. [5] Dede, T., (2014). Application of Teaching-Learning-Based-Optimization Algorithm for the Discrete Optimization of Truss Structures. KSCE Journal of Civil Engineering, 18(6):1759-1767.
  6. [6] Zheng, D.X.M., Thomas, N.S., and Kumaraswamy, M.M., (2005). Applying Pareto Ranking and Niche Formation to Genetic Algorithm-Based Multiobjective Time–Cost Optimization. J.Construction. Eng. Manage., 131(1):81-91.
  7. [7] Afshar, A., Kaveh, A., Kasaeian, A., and Shoghli, O.R., (2007). Modified Adaptive Weighting Method for Time-Cost Trade-off Problem based on Ant Colony Optimization. Proceedings of 3rd National Congress on Civil Engineering, 1-9.
  8. [8] Deb, K., (2002). A Fast and Elitist Multiobjective Genetic Algorithm: Nsga-Ii. IEEE Transactions on Evolutionary Computation, 6(2):182-197.

Details

Primary Language

Turkish

Subjects

Engineering

Journal Section

Research Article

Authors

Tayfun Dede
KARADENİZ TEKNİK ÜNİVERSİTESİ
Türkiye

Publication Date

April 21, 2018

Submission Date

November 3, 2017

Acceptance Date

March 8, 2018

Published in Issue

Year 2018 Volume: 13 Number: 2

APA
Dede, T. (2018). DECISION-MAKING PROCESS TECHNIQUES USED IN THE OPTIMIZATION OF CONSTRUCTION PROJECTS. Engineering Sciences, 13(2), 128-136. https://izlik.org/JA66RS66KW
AMA
1.Dede T. DECISION-MAKING PROCESS TECHNIQUES USED IN THE OPTIMIZATION OF CONSTRUCTION PROJECTS. Engineering Sciences. 2018;13(2):128-136. https://izlik.org/JA66RS66KW
Chicago
Dede, Tayfun. 2018. “DECISION-MAKING PROCESS TECHNIQUES USED IN THE OPTIMIZATION OF CONSTRUCTION PROJECTS”. Engineering Sciences 13 (2): 128-36. https://izlik.org/JA66RS66KW.
EndNote
Dede T (April 1, 2018) DECISION-MAKING PROCESS TECHNIQUES USED IN THE OPTIMIZATION OF CONSTRUCTION PROJECTS. Engineering Sciences 13 2 128–136.
IEEE
[1]T. Dede, “DECISION-MAKING PROCESS TECHNIQUES USED IN THE OPTIMIZATION OF CONSTRUCTION PROJECTS”, Engineering Sciences, vol. 13, no. 2, pp. 128–136, Apr. 2018, [Online]. Available: https://izlik.org/JA66RS66KW
ISNAD
Dede, Tayfun. “DECISION-MAKING PROCESS TECHNIQUES USED IN THE OPTIMIZATION OF CONSTRUCTION PROJECTS”. Engineering Sciences 13/2 (April 1, 2018): 128-136. https://izlik.org/JA66RS66KW.
JAMA
1.Dede T. DECISION-MAKING PROCESS TECHNIQUES USED IN THE OPTIMIZATION OF CONSTRUCTION PROJECTS. Engineering Sciences. 2018;13:128–136.
MLA
Dede, Tayfun. “DECISION-MAKING PROCESS TECHNIQUES USED IN THE OPTIMIZATION OF CONSTRUCTION PROJECTS”. Engineering Sciences, vol. 13, no. 2, Apr. 2018, pp. 128-36, https://izlik.org/JA66RS66KW.
Vancouver
1.Tayfun Dede. DECISION-MAKING PROCESS TECHNIQUES USED IN THE OPTIMIZATION OF CONSTRUCTION PROJECTS. Engineering Sciences [Internet]. 2018 Apr. 1;13(2):128-36. Available from: https://izlik.org/JA66RS66KW