Research Article

Robust Optimization Model for Production Planning Problem under Uncertainty

Volume: 4 Number: 1 January 15, 2017
EN TR

Robust Optimization Model for Production Planning Problem under Uncertainty

Abstract

Conditions of businesses change very quickly. To take into account the uncertainty engendered by changes has become almost a rule while planning. Robust optimization techniques that are methods of handling uncertainty ensure to produce less sensitive results to changing conditions. Production planning, is to decide from which product, when and how much will be produced, with a most basic definition. Modeling and solution of the Production planning problems changes depending on structure of the production processes, parameters and variables. In this paper, it is aimed to generate and apply scenario based robust optimization model for capacitated two-stage multi-product production planning problem under parameter and demand uncertainty. With this purpose, production planning problem of a textile company that operate in İzmir has been modeled and solved, then deterministic scenarios’ and robust method’s results have been compared. Robust method has provided a production plan that has higher cost but, will result close to feasible and optimal for most of the different scenarios in the future.

Keywords

Robust Optimization,Production Planning,Uncertainty

References

  1. Adasme, P., Lisser, A., ve Soto, I. (2011) “Robust Semidefinite Relaxations for a Quadratic OFDMA Resource Allocation Scheme”, Computers & Operations Research, 38(10): 1377-1399.
  2. Adida, E., ve Joshi, P. (2009) “A Robust Optimisation Approach to Project Scheduling and Resource Allocation”, International Journal of Services Operations and Informatics, 4(2): 169-193.
  3. Adida, E., ve Perakis, G. (2006) “A Robust Optimization Approach to Dynamic Pricing and İnventory Control with no Backorders”, Mathematical Programming, 107(1-2): 97-129.
  4. Adida, E., ve Perakis, G. (2010) “Dynamic Pricing and İnventory Control: Robust vs. Stochastic Uncertainty ModelsA Computational Study” Annals of Operations Research, 181(1): 125-157.
  5. Aghezzaf, E. (2005) “Capacity Planning and Warehouse Location in Supply Chains with Uncertain Demands”, Journal of the Operational Research Society, 56(4): 453-462.
  6. Agra, A., Christiansen, M., Figueiredo, R., Hvattum, L. M., Poss, M. ve Requejo, C. (2013) “The Robust Vehicle Routing Problem with Time Windows”, Computers & Operations Research, 40(3): 856-866.
  7. Ait-Alla, A., Teucke, M., Lütjen, M., Beheshti-Kashi, S. ve Karimi, H.R. (2014) “Robust Production Planning in Fashion Apparel Industry under Demand Uncertainty via Conditional Value at Risk”, Hindawi Publishing Corporation Mathematical Problems in Engineering, Cilt 2014.
  8. Alem, D. J. ve Morabito, R. (2012) “Production Planning in Furniture Settings via Robust Optimization”, Computers&Operations Research, 30: 139-150.
  9. Aloulou, M. A., Dolgui, A., & Kovalyov, M. Y. (2014). A Bibliography of Non-Deterministic Lot-Sizing Models. International Journal of Production Research. 52(8): 2293-2310.
  10. Atamtürk, A., ve Zhang, M. (2007) “Two-Stage Robust Network Flow and Design under Demand Uncertainty”, Operations Research, 55(4): 662-673.
APA
Güçlü, P., & Özdemir, A. (2017). Belirsizlik Altında Üretim Planlaması Problemi için Robust Eniyileme Modeli. Optimum Ekonomi Ve Yönetim Bilimleri Dergisi, 4(1), 55-76. https://doi.org/10.17541/optimum.285050
AMA
1.Güçlü P, Özdemir A. Belirsizlik Altında Üretim Planlaması Problemi için Robust Eniyileme Modeli. OJEMS. 2017;4(1):55-76. doi:10.17541/optimum.285050
Chicago
Güçlü, Pembe, and Ali Özdemir. 2017. “Belirsizlik Altında Üretim Planlaması Problemi Için Robust Eniyileme Modeli”. Optimum Ekonomi Ve Yönetim Bilimleri Dergisi 4 (1): 55-76. https://doi.org/10.17541/optimum.285050.
EndNote
Güçlü P, Özdemir A (January 1, 2017) Belirsizlik Altında Üretim Planlaması Problemi için Robust Eniyileme Modeli. Optimum Ekonomi ve Yönetim Bilimleri Dergisi 4 1 55–76.
IEEE
[1]P. Güçlü and A. Özdemir, “Belirsizlik Altında Üretim Planlaması Problemi için Robust Eniyileme Modeli”, OJEMS, vol. 4, no. 1, pp. 55–76, Jan. 2017, doi: 10.17541/optimum.285050.
ISNAD
Güçlü, Pembe - Özdemir, Ali. “Belirsizlik Altında Üretim Planlaması Problemi Için Robust Eniyileme Modeli”. Optimum Ekonomi ve Yönetim Bilimleri Dergisi 4/1 (January 1, 2017): 55-76. https://doi.org/10.17541/optimum.285050.
JAMA
1.Güçlü P, Özdemir A. Belirsizlik Altında Üretim Planlaması Problemi için Robust Eniyileme Modeli. OJEMS. 2017;4:55–76.
MLA
Güçlü, Pembe, and Ali Özdemir. “Belirsizlik Altında Üretim Planlaması Problemi Için Robust Eniyileme Modeli”. Optimum Ekonomi Ve Yönetim Bilimleri Dergisi, vol. 4, no. 1, Jan. 2017, pp. 55-76, doi:10.17541/optimum.285050.
Vancouver
1.Pembe Güçlü, Ali Özdemir. Belirsizlik Altında Üretim Planlaması Problemi için Robust Eniyileme Modeli. OJEMS. 2017 Jan. 1;4(1):55-76. doi:10.17541/optimum.285050