Multi-objective scheduling by maximizing machine preferences for unrelated parallel machines
Abstract
Keywords
References
- [1] Pinedo, M. 2002. Scheduling: theory, algorithms and systems. Third ed. NewJersey: Prentice all.
- [2] Allahverdi, A., J. N. D. Gupta, and T. Aldowaisan. 1999. “A review of scheduling research involving setup considerations.” Omega, no.27:219-239.
- [3] Allahverdi, A., C. T. Ng, T. C. E. Cheng, and M. Kovalyov. 2008. “A survey of scheduling problems with setup times or costs.” European Journal of Operational Research no.187: 985-1032.
- [4] França, P., M. Gendreau, G. Laporte, and F. Muller. 1996. “A tabu search heuristic for the multiprocessor scheduling problem with sequence dependent setup times.” International Journal of Production Economics 43(2-3):79–89.
- [5] Marsh, J.D. and Montgomery, D.C. (1973) ‘Optimal procedures for scheduling jobs with sequence-dependent changeover times on parallel processors’, AIIE Technical Papers, pp.279-286.
- [6] Guinet, A. 1991. “Textile production systems: A succession of non-identical parallel processor shops.” Journal of the Operational Research Society 42(8):655-671.
- [7] Elmaghraby, S.E, A. Guinet, and K.W. Schellenberger. 1993 “Sequencing on parallel processors: An alternate approach.” OR Technical Report no. 273, Raleigh, NC: North Carolina State University.
- [8] Zhu, Z. and R.B. Heady. 2000. “Minimizing the sum of earliness/ tardiness in multi-machine scheduling: A mixed integer programming approach.” Computers and Industrial Engineering no.38: 297–305.
Details
Primary Language
English
Subjects
Engineering
Journal Section
Research Article
Authors
İnci Sarıçiçek
This is me
0000-0002-3528-7342
Türkiye
Publication Date
March 27, 2020
Submission Date
March 14, 2019
Acceptance Date
January 8, 2020
Published in Issue
Year 2020 Volume: 38 Number: 1