ASSESSMENT OF PROJECT CHARACTERISTICS AFFECTING RISK OCCURRENCES IN CONSTRUCTION PROJECTS USING FUZZY AHP
Abstract
Keywords
References
- [1] Sexton, M., P. Barret, (2003), “A literature synthesis of innovation in small construction firms: insights, ambiguities and questions,” Construction Management and Economics, 21 (6), 613–622.
- [2] Barrett, P., M. Sexton, (2006), “Innovation in small, project-based construction firms,” British Journal of Management, 17 (4), 331–346.
- [3] Rezgui, Y., A. Zarli, (2006), “Paving the way to the vision of digital construction: A strategic roadmap,” Journal of Construction Engineering and Management, 132 (7), 767–776.
- [4] Beatham, S., C. Anumba, T. Thorpe, I. Hedges, (2004), “KPIs: A critical appraisal of their use in construction,” Benchmarking: An International Journal, 11 (1), 93–117.
- [5] Alinaitwe, H., J. A. Mwakali, B. Hansson, (2009), “Organizational effectiveness of Ugandan building firms as viewed by craftsmen,” Journal of Civil Engineering and Management, 15 (3), 281–288.
- [6] Rivas, R. A., J. D. Borcherding, V. González, L. F. Alarcón, (2011), “Analysis of factors influencing productivity using craftsmen questionnaires: Case study in a Chilean construction company,” Journal of Construction Engineering and Management, 137 (4), 312–320.
- [7] Fidan, G., I. Dikmen, A. M. Tanyer, M. T. Birgonul, (2011), “Ontology for Relating Risk and Vulnerability to Cost Overrun in International Projects,” Journal of Computing in Civil Engineering, 25 (4), 302–315.
- [8] Zhi, H., (1995), “Risk management for overseas construction projects,” International Journal of Project Management, 13 (4), 231–237.
Details
Primary Language
English
Subjects
Engineering
Journal Section
Research Article
Authors
Ozan Okudan
This is me
0000-0001-7816-2761
Türkiye
Cenk Budayan
This is me
0000-0002-8433-2824
Türkiye
Publication Date
October 5, 2021
Submission Date
February 24, 2020
Acceptance Date
July 25, 2020
Published in Issue
Year 2020 Volume: 38 Number: 3