Research Article

ASSESSMENT OF PROJECT CHARACTERISTICS AFFECTING RISK OCCURRENCES IN CONSTRUCTION PROJECTS USING FUZZY AHP

Volume: 38 Number: 3 October 5, 2021
  • Ozan Okudan
  • Cenk Budayan
EN

ASSESSMENT OF PROJECT CHARACTERISTICS AFFECTING RISK OCCURRENCES IN CONSTRUCTION PROJECTS USING FUZZY AHP

Abstract

The performance of the construction industry has been widely criticized in the literature due to substantial delays and cost overruns. The dynamic, turbulent, and complex environment of the construction industry can lead to poor performance causing occurrence of numerous risks that can adversely affect the performance of the projects. Risk management plays an important role in the improvement of performance of construction projects. However, performance of risk management is challenging due to limited availability of information, particularly during the risk identification stage. This study aims to identify the characteristics of the construction projects that are critical in the occurrence of the risks. For that purpose, an in-depth literature review was conducted to extract characteristics of the construction projects in the first step of the study. Then, a questionnaire survey was prepared to collect expert opinions. Finally, a MATLAB script was developed in-house to perform a fuzzy AHP method to analyze the gathered data. The findings show that the contract-related characteristics, contract type, project value, and construction-related characteristics are the most critical characteristics of construction projects related to risk occurrence cases.

Keywords

References

  1. [1] Sexton, M., P. Barret, (2003), “A literature synthesis of innovation in small construction firms: insights, ambiguities and questions,” Construction Management and Economics, 21 (6), 613–622.
  2. [2] Barrett, P., M. Sexton, (2006), “Innovation in small, project-based construction firms,” British Journal of Management, 17 (4), 331–346.
  3. [3] Rezgui, Y., A. Zarli, (2006), “Paving the way to the vision of digital construction: A strategic roadmap,” Journal of Construction Engineering and Management, 132 (7), 767–776.
  4. [4] Beatham, S., C. Anumba, T. Thorpe, I. Hedges, (2004), “KPIs: A critical appraisal of their use in construction,” Benchmarking: An International Journal, 11 (1), 93–117.
  5. [5] Alinaitwe, H., J. A. Mwakali, B. Hansson, (2009), “Organizational effectiveness of Ugandan building firms as viewed by craftsmen,” Journal of Civil Engineering and Management, 15 (3), 281–288.
  6. [6] Rivas, R. A., J. D. Borcherding, V. González, L. F. Alarcón, (2011), “Analysis of factors influencing productivity using craftsmen questionnaires: Case study in a Chilean construction company,” Journal of Construction Engineering and Management, 137 (4), 312–320.
  7. [7] Fidan, G., I. Dikmen, A. M. Tanyer, M. T. Birgonul, (2011), “Ontology for Relating Risk and Vulnerability to Cost Overrun in International Projects,” Journal of Computing in Civil Engineering, 25 (4), 302–315.
  8. [8] Zhi, H., (1995), “Risk management for overseas construction projects,” International Journal of Project Management, 13 (4), 231–237.

Details

Primary Language

English

Subjects

Engineering

Journal Section

Research Article

Authors

Publication Date

October 5, 2021

Submission Date

February 24, 2020

Acceptance Date

July 25, 2020

Published in Issue

Year 2020 Volume: 38 Number: 3

APA
Okudan, O., & Budayan, C. (2021). ASSESSMENT OF PROJECT CHARACTERISTICS AFFECTING RISK OCCURRENCES IN CONSTRUCTION PROJECTS USING FUZZY AHP. Sigma Journal of Engineering and Natural Sciences, 38(3), 1447-1462. https://izlik.org/JA85XU72SX
AMA
1.Okudan O, Budayan C. ASSESSMENT OF PROJECT CHARACTERISTICS AFFECTING RISK OCCURRENCES IN CONSTRUCTION PROJECTS USING FUZZY AHP. SIGMA. 2021;38(3):1447-1462. https://izlik.org/JA85XU72SX
Chicago
Okudan, Ozan, and Cenk Budayan. 2021. “ASSESSMENT OF PROJECT CHARACTERISTICS AFFECTING RISK OCCURRENCES IN CONSTRUCTION PROJECTS USING FUZZY AHP”. Sigma Journal of Engineering and Natural Sciences 38 (3): 1447-62. https://izlik.org/JA85XU72SX.
EndNote
Okudan O, Budayan C (October 1, 2021) ASSESSMENT OF PROJECT CHARACTERISTICS AFFECTING RISK OCCURRENCES IN CONSTRUCTION PROJECTS USING FUZZY AHP. Sigma Journal of Engineering and Natural Sciences 38 3 1447–1462.
IEEE
[1]O. Okudan and C. Budayan, “ASSESSMENT OF PROJECT CHARACTERISTICS AFFECTING RISK OCCURRENCES IN CONSTRUCTION PROJECTS USING FUZZY AHP”, SIGMA, vol. 38, no. 3, pp. 1447–1462, Oct. 2021, [Online]. Available: https://izlik.org/JA85XU72SX
ISNAD
Okudan, Ozan - Budayan, Cenk. “ASSESSMENT OF PROJECT CHARACTERISTICS AFFECTING RISK OCCURRENCES IN CONSTRUCTION PROJECTS USING FUZZY AHP”. Sigma Journal of Engineering and Natural Sciences 38/3 (October 1, 2021): 1447-1462. https://izlik.org/JA85XU72SX.
JAMA
1.Okudan O, Budayan C. ASSESSMENT OF PROJECT CHARACTERISTICS AFFECTING RISK OCCURRENCES IN CONSTRUCTION PROJECTS USING FUZZY AHP. SIGMA. 2021;38:1447–1462.
MLA
Okudan, Ozan, and Cenk Budayan. “ASSESSMENT OF PROJECT CHARACTERISTICS AFFECTING RISK OCCURRENCES IN CONSTRUCTION PROJECTS USING FUZZY AHP”. Sigma Journal of Engineering and Natural Sciences, vol. 38, no. 3, Oct. 2021, pp. 1447-62, https://izlik.org/JA85XU72SX.
Vancouver
1.Ozan Okudan, Cenk Budayan. ASSESSMENT OF PROJECT CHARACTERISTICS AFFECTING RISK OCCURRENCES IN CONSTRUCTION PROJECTS USING FUZZY AHP. SIGMA [Internet]. 2021 Oct. 1;38(3):1447-62. Available from: https://izlik.org/JA85XU72SX

IMPORTANT NOTE: JOURNAL SUBMISSION LINK https://eds.yildiz.edu.tr/sigma/