Research Article

AN INTEGER PROGRAMMING MODEL FOR DISASSEMBLY SYSTEM CONFIGURATION

Volume: 37 Number: 3 September 1, 2020
  • Ömer Faruk Yılmaz

AN INTEGER PROGRAMMING MODEL FOR DISASSEMBLY SYSTEM CONFIGURATION

Abstract

As the product life cycles have continuously decreased, disassembly system design has been regarded to be important for manufacturing enterprises. Effective design of a disassembly system enables the enterprises to recycle the end of life products with low cost and high utilization of labors. This study focuses on the line segmentation problem of disassembly system where the worker assignment and segment determination decisions are made simultaneously. To do so, higher utilization of worker resources is achieved and disassembly operations are carried out by effective worker teams since the worker timetabling and disassembly line segmentation problems taken into consideration concurrently. To represent the problem mathematically, an integer programming model is developed. Besides, two different heuristic procedures, namely SSGWA and CSGWA, are presented to solve the problem in a reasonable amount of time. According to the computational results, SSGWA heuristic superior to CSGWA heuristic consistently because it takes both line segmentation and worker assignment decisions into account simultaneously.

Keywords

References

  1. [1] Bentaha, M. L., Battaïa, O., Dolgui, A., & Hu, S. J. (2014). Dealing with uncertainty in disassembly line design. CIRP Annals-Manufacturing Technology, 63(1), 21-24.
  2. [2] Bentaha, M. L., Dolgui, A., Battaïa, O., Riggs, R. J., & Hu, J. (2018). Profit-oriented partial disassembly line design: dealing with hazardous parts and task processing times uncertainty. International Journal of Production Research, 1-23.
  3. [3] Desai, A., & Mital, A. (2003). Evaluation of disassemblability to enable design for disassembly in mass production. International Journal of Industrial Ergonomics, 32(4), 265-281.
  4. [4] Edis, E. B., Oguz, C., & Ozkarahan, I. (2013). Parallel machine scheduling with additional resources: Notation, classification, models and solution methods. European Journal of Operational Research, 230(3), 449-463.
  5. [5] Igarashi, K., Yamada, T., Gupta, S. M., Inoue, M., & Itsubo, N. (2016). Disassembly system modeling and design with parts selection for cost, recycling and CO2 saving rates using multi criteria optimization. Journal of Manufacturing Systems, 38, 151-164.
  6. [6] Igarashi, K., Yamada, T., & Inoue, M. (2014). 2-stage optimal design and analysis for disassembly system with environmental and economic parts selection using the recyclability evaluation method. Industrial Engineering and Management Systems, 13(1), 52-66.
  7. [7] Lee, D. H., Kang, J. G., & Xirouchakis, P. (2001). Disassembly planning and scheduling: review and further research. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, 215(5), 695-709.
  8. [8] Mascle, C. (2002). A system life-cycle model for disassembly-assembly line design. IFAC Proceedings Volumes, 35(1), 103-108.

Details

Primary Language

English

Subjects

Engineering

Journal Section

Research Article

Authors

Ömer Faruk Yılmaz This is me
0000-0002-6202-4011
Türkiye

Publication Date

September 1, 2020

Submission Date

October 14, 2018

Acceptance Date

May 7, 2019

Published in Issue

Year 2019 Volume: 37 Number: 3

APA
Yılmaz, Ö. F. (2020). AN INTEGER PROGRAMMING MODEL FOR DISASSEMBLY SYSTEM CONFIGURATION. Sigma Journal of Engineering and Natural Sciences, 37(3), 813-825. https://izlik.org/JA95SL66LR
AMA
1.Yılmaz ÖF. AN INTEGER PROGRAMMING MODEL FOR DISASSEMBLY SYSTEM CONFIGURATION. SIGMA. 2020;37(3):813-825. https://izlik.org/JA95SL66LR
Chicago
Yılmaz, Ömer Faruk. 2020. “AN INTEGER PROGRAMMING MODEL FOR DISASSEMBLY SYSTEM CONFIGURATION”. Sigma Journal of Engineering and Natural Sciences 37 (3): 813-25. https://izlik.org/JA95SL66LR.
EndNote
Yılmaz ÖF (September 1, 2020) AN INTEGER PROGRAMMING MODEL FOR DISASSEMBLY SYSTEM CONFIGURATION. Sigma Journal of Engineering and Natural Sciences 37 3 813–825.
IEEE
[1]Ö. F. Yılmaz, “AN INTEGER PROGRAMMING MODEL FOR DISASSEMBLY SYSTEM CONFIGURATION”, SIGMA, vol. 37, no. 3, pp. 813–825, Sept. 2020, [Online]. Available: https://izlik.org/JA95SL66LR
ISNAD
Yılmaz, Ömer Faruk. “AN INTEGER PROGRAMMING MODEL FOR DISASSEMBLY SYSTEM CONFIGURATION”. Sigma Journal of Engineering and Natural Sciences 37/3 (September 1, 2020): 813-825. https://izlik.org/JA95SL66LR.
JAMA
1.Yılmaz ÖF. AN INTEGER PROGRAMMING MODEL FOR DISASSEMBLY SYSTEM CONFIGURATION. SIGMA. 2020;37:813–825.
MLA
Yılmaz, Ömer Faruk. “AN INTEGER PROGRAMMING MODEL FOR DISASSEMBLY SYSTEM CONFIGURATION”. Sigma Journal of Engineering and Natural Sciences, vol. 37, no. 3, Sept. 2020, pp. 813-25, https://izlik.org/JA95SL66LR.
Vancouver
1.Ömer Faruk Yılmaz. AN INTEGER PROGRAMMING MODEL FOR DISASSEMBLY SYSTEM CONFIGURATION. SIGMA [Internet]. 2020 Sep. 1;37(3):813-25. Available from: https://izlik.org/JA95SL66LR

IMPORTANT NOTE: JOURNAL SUBMISSION LINK https://eds.yildiz.edu.tr/sigma/