Cost and duration estimation of autonomous grading algorithm by simulation

Volume: 42 Number: 3 June 12, 2024
EN

Cost and duration estimation of autonomous grading algorithm by simulation

Abstract

Estimation of cost and duration of grading a particular area provides important information for contractors and construction machine manufacturers. In this study, cost and duration of excavation by dozer is estimated by simulating the movements of the dozer. Specifications of the dozer, soil conditions and site conditions are defined to the simulator. The simulation considers tire penetration, rolling, grade, hauling, as well as cutting resistances and estimates the necessary force to be applied. The simulation implements an autonomous grading algorithm established for electric powered dozers which starts grading from a local highest point to prevent uphill excavation and hauling. The algorithm determines the necessary maneuvers to reach local highest point, excavate or haul the earth pile to the dump area. The simulation runs until the objected elevation is obtained at each portion of the excavation site. The simulator calculates the consumed energy, time, and total cost of the excavation. The excavations of 30x45 square meter area by one existing electric dozer and five updated versions of it are simulated. The simulation of the excavation is computed in 23 seconds for the smallest and 10 seconds for the largest dozer. The cost of grading and pushing the excavated material at most 20 meters away is estimated as less than 5 cents/m3 for the lead-acid battery powered dozer and 8 cents/m3 in the average for the lithium-ion battery powered dozers. The simulation revealed that electric powered dozers have less unit excavation cost than diesel powered ones, also larger dozers consumes less energy than the smaller ones. The developed simulation technique is implemented without any numerical errors and the technique can be beneficial for the construction machine manufacturers to optimize their designs and for the contractors to select the most suitable construction machine among the present alternatives.

Keywords

References

  1. [1] Zhong D, Ping Z, KangXin W. Theory and practice of construction simulation for high rockfill dam. Sci China Technol Sci 2007;50:51–61. [CrossRef]
  2. [2] Lu M, Chen W, Shen X, Lam HC, Liu J. Positioning and tracking construction vehicles in highly dense urban areas and building construction site. Autom Constr 2007;16:647–656. [CrossRef]
  3. [3] Vahdatikhaki F, Hammad A, Siddiqui H. Optimization-based excavator pose estimation using real-time location systems. Autom Constr 2015;56:76–92. [CrossRef]
  4. [4] Hammad A, Vahdatikhaki F Zhang C. A novel integrated approach to project-level automated machine control/guidance systems in construction projects. J Inf Technol in Constr 2013;18:162–181.
  5. [5] Jurasz J, Kley K. A Cost-effective positioning solution for asphalt rollers based on low-cost DGPS receivers. In proceedings of the 19th International Symposium on Automation
  6. and Robotics in Construction; 2002 Sept 23–25; Washington, USA. 2002. p. 403–408. [CrossRef]
  7. [6] Hung WH, Kang SCJ. Automatic clustering method for real-time construction simulation. Adv Eng Inform 2014:28:138–152. [CrossRef]
  8. [7] Oloufa A, Ikeda M, Oda H. Situational awareness of construction equipment using GPS, wireless and web technologies. Autom Constr 2003;12:737–748. [CrossRef]

Details

Primary Language

English

Subjects

Structural Biology

Journal Section

Research Article

Authors

Publication Date

June 12, 2024

Submission Date

July 24, 2022

Acceptance Date

January 2, 2023

Published in Issue

Year 2024 Volume: 42 Number: 3

APA
Bettemir, Ö. H. (2024). Cost and duration estimation of autonomous grading algorithm by simulation. Sigma Journal of Engineering and Natural Sciences, 42(3), 831-844. https://izlik.org/JA82SB47WX
AMA
1.Bettemir ÖH. Cost and duration estimation of autonomous grading algorithm by simulation. SIGMA. 2024;42(3):831-844. https://izlik.org/JA82SB47WX
Chicago
Bettemir, Önder Halis. 2024. “Cost and Duration Estimation of Autonomous Grading Algorithm by Simulation”. Sigma Journal of Engineering and Natural Sciences 42 (3): 831-44. https://izlik.org/JA82SB47WX.
EndNote
Bettemir ÖH (June 1, 2024) Cost and duration estimation of autonomous grading algorithm by simulation. Sigma Journal of Engineering and Natural Sciences 42 3 831–844.
IEEE
[1]Ö. H. Bettemir, “Cost and duration estimation of autonomous grading algorithm by simulation”, SIGMA, vol. 42, no. 3, pp. 831–844, June 2024, [Online]. Available: https://izlik.org/JA82SB47WX
ISNAD
Bettemir, Önder Halis. “Cost and Duration Estimation of Autonomous Grading Algorithm by Simulation”. Sigma Journal of Engineering and Natural Sciences 42/3 (June 1, 2024): 831-844. https://izlik.org/JA82SB47WX.
JAMA
1.Bettemir ÖH. Cost and duration estimation of autonomous grading algorithm by simulation. SIGMA. 2024;42:831–844.
MLA
Bettemir, Önder Halis. “Cost and Duration Estimation of Autonomous Grading Algorithm by Simulation”. Sigma Journal of Engineering and Natural Sciences, vol. 42, no. 3, June 2024, pp. 831-44, https://izlik.org/JA82SB47WX.
Vancouver
1.Önder Halis Bettemir. Cost and duration estimation of autonomous grading algorithm by simulation. SIGMA [Internet]. 2024 Jun. 1;42(3):831-44. Available from: https://izlik.org/JA82SB47WX

IMPORTANT NOTE: JOURNAL SUBMISSION LINK https://eds.yildiz.edu.tr/sigma/