Research Article
BibTex RIS Cite

AN ANALYSIS OF THE LINKS BETWEEN PROJECT SUCCESS FACTORS AND PROJECT PERFORMANCE

Year 2016, Volume: 34 Issue: 2, 223 - 239, 01.06.2016

Abstract

Organizations not only need to adapt themselves to fast evolving environment, but also endeavor to shape it for their survival. Executing projects is one of the important practices for handling difficulties created by changes taking place. Thus, almost all organizations, at any scale, implement a number of projects simultaneously all the time. Yet, executing projects does not ensure success. Thus, in this paper, the links between project success factors and project performance and strength of the relationships between the support factors and the success factors are studied and demonstrated to shed some light on project environment.
In order to analyze all factors simultaneously, a project environment model is proposed. To test the research model, a questionnaire survey is conducted in 2012 summer and structural equation modeling (SEM) is used at analyzing stage. Analyzes showed that there four main factors which are forming project environment; these are Strategic Support (1), Operational Support (2), Project Performance (3), and Organizational Success (4). As a result of the analysis, strategic support enables more effective operational support. With effective operational support, project performance increases. Organizational success is affected by both project performance and strategic support directly, whereas the effect of operational support is indirect.

References

  • [1] Patanakul P. and Milosevic D.(2008) A competency model for effectiveness in managing multiple projects, J. High Technol. Manag. Res., 18,118–131.
  • [2] Patanakul P. and Milosevic D.(2009) The effectiveness in managing a group of multiple projects: Factors of influence and measurement criteria,Int. J. Proj. Manag., 27, 216–233.
  • [3] Bolles D (2002) Building Project-Management Centers of Excellence. Newyork, USA.
  • [4] Kendall G. I. and Rollins S. C. (2003) Advanced Project Portfolio Management and the PMO. Ross Publishing, Inc., USA.
  • [5] Liu L. and Yetton P. (2007) The Contingent Effects on Project Performance of Conducting Project Reviews and Deploying Project Management Offices, IEEE Trans. Eng. Manag., 54, 789–799.
  • [6] Winter S. G. and Wiley J. (2003) Understanding Dynamic Capabilities, Strateg. Manag., 24, 991–995.
  • [7] Jugdev K. (2004) Through the Looking Glass: Examining Theory Development in Project Management with the Resource-Based View Lens, Proj. Manag. J., 35,15–26.
  • [8] Kerzner H., (2009) Project Management: A Systems Approach to Planning, Scheduling, and Controlling John Wiley and Sons, USA.
  • [9] Hyvari I. (2006) Success of Projects in Different Organizational Conditions,”Proj. Manag. J., 37, 31–42.
  • [10] Hyvari I. (2006) Project management effectiveness in project-oriented business organizations, Int. J. Proj. Manag., 24, 216–225.
  • [11] Voss M. (2012) Impact of customer integration on project portfolio management and its success—Developing a conceptual framework, Int. J. Proj. Manag.,30, 567–581.
  • [12] Petit Y. (2011) Project portfolios in dynamic environments: Organizing for uncertainty, Int. J. Proj. Manag., 30, 539–553.
  • [13] Cooke-Davies T. (2002) The ‘“ real ”’ success factors on projects, Int. J. Proj. Manag., 20, 185–190.
  • [14] Engwall M. and Jerbrant A. (2003) The resource allocation syndrome: the prime challenge of multi-project management?, Int. J. Proj. Manag., 21, 403–409,.
  • [15] Teller J., Unger B. N., Kock A., andGemünden H. G. (2012) Formalization of project portfolio management: The moderating role of project portfolio complexity, Int. J. Proj. Manag., 30, 596–607.
  • [16] Chao R. O., Kavadias S., and Gaimon C. (2009) Revenue Driven Resource Allocation: Funding Authority, Incentives, and New Product Development Portfolio Management, Manage. Sci., 55, 1556–1569.
  • [17] Kumar V., Persaud A., and Kumar T. (1996) To Terminate or Not an Ongoing R & D Project : A Managerial Dilemma, IEEE Trans. Eng. Manag., 43, 273–284.
  • [18] Blichfeldt B. S. and Eskerod P., (2008) Project portfolio management – There’s more to it than what management enacts, Int. J. Proj. Manag., 26, 357–365.
  • [19] Jonas D., Kock A., and Gemünden H. G., (2010) The impact of portfolio management quality on project portfolio success, EURAM, 2010, Rom, Italy.
  • [20] Meskendahl S. (2010) The influence of business strategy on project portfolio management and its success — A conceptual framework,”Int. J. Proj. Manag., 28, 807–817.
  • [21] Baccarini D. (1999) The Logical Framework Method for Defining Project Success, Proj. Manag. J., 30, 25–32.
  • [22] Jugdev K., Mathur G., and Fung T. (2006) Project Management Assets and Project Management Performance : Preliminary Findings, J. Oper. Manag., 29, 604-617.
  • [23] Muller R. and Turner R., (2007) The Influence of Project Managers on Project Success Criteria and Project Success by Type of Project,”Eur. Manag. J., 25, 298–309.
  • [24] Shenhar A. J., Dvir D., Levy O., and Maltz A. C. (2001) Project Success: A Multidimensional Strategic Concept, 34, 699–725.
  • [25] Belassi W. and Tukel O. I., (1996) A new framework for determining critical success/failure factors in projects, Int. J. Proj. Manag., 14, 141–151.
  • [26] Caccia-Bava M. C., Guimaraes V., and T. Guimaraes (2013) Important Factors for Success in Hospital BPR Project Phases, Int. J. Health Care Qual. Assur., 26, 729 – 745.
  • [27] Biazzo S. (2009) Flexibility, Structuration, and Simultaneity in New Product Development, J Prod Innov Manag, 26, 336–353.
  • [28] Tatikonda M. V. and Rosenthal S. R., (200) Technology novelty, project complexity, and product development project execution success: a deeper look at task uncertainty in product innovation, IEEE Trans. Eng. Manag., 47, 74–87.
  • [29] Baccarini D. (1996) The concept of project complexity—a review, Int. J. Proj. Manag., 14, 201–204.
  • [30] Dvir D., Lipovetsky S., Shenhar A., and Tishler A (1998) In search of project classification: a non-universal approach to project success factors, Res. Policy, vol. 27, 915–935.
  • [31] Griffin A. (1997) The Effect of Time Project and on Product Characteristics Development Cycle, J. Mark. Res., 34, 24–35.
  • [32] Hendriks M., Voeten B., and Kroep L. (1999) Human resource allocation in a multi-project R&D environment, Int. J. Proj. Manag., 17, 181–188.
  • [33] Huemann M., Keegan A., and Turner J. R. (2007) Human resource management in the project-oriented company: A review, Int. J. Proj. Manag., 25, no. 3, pp. 315–323.
  • [34] Belout A. and Gauvreau C. (2004) Factors influencing project success: the impact of human resource management, Int. J. Proj. Manag., 22, 1–11.
  • [35] Chevrier S., (2003) Cross-cultural management in multinational project groups, J. World Bus., 38, 141–149.
  • [36] Watson W. E., Kumar K., and Michaelsen L. K. (1993) Cultural Diversity’S Impact on Interaction Process and Performance: Comparing Homogeneous and Diverse Task Groups., Acad. Manag. J., vol. 36, 590–602.
  • [37] Kruglianskas I. and Thamhain H. J. (2000) Managing Technology-Based Projects in Multinational Environments, IEEE Trans. Eng. Manag., 47, 55–64.
  • [38] Thamhain H. J. (2011) Critical Success Factors for Managing Technology- Intensive Teams in the Global Enterprise, Eng. Manag. J., 23, 30–36.
  • [39] Dietrich P. and Lehtonen P. (2005) Successful management of strategic intentions through multiple projects – Reflections from empirical study, Int. J. Proj. Manag., 23, 386–391.
  • [40] Fortune J. and White D. (2006) Framing of project critical success factors by a systems model, Int. J. Proj. Manag., 24, 53–65.
  • [41] Nitithamyong P. and Skibniewski M. J. (2006) Success / Failure Factors and Performance Measures of Web-Based Construction Project Management Systems: Professionals’ Viewpoint, J. Constr. Eng. Manag., 80–88.
  • [42] Turner R., Ledwith A., andKelly J. (2012) Project management in small to medium-sized enterprises: Tailoring the practices to the size of company, Manag. Decis., 50, 942–957, 2012.
  • [43] Killen C. P., Jugdev K., Drouin N., and Petit Y., (2012) Advancing project and portfolio management research: Applying strategic management theories,” Int. J. Proj. Manag., 30, 525–538.
  • [44] Martinsuo M. (2003) Project portfolio management in practice and in context, Int. J. Proj. Manag., 31, 794–803.
  • [45] Kaiser M. G., El Arbi F., and Ahlemann F. (2015) Successful project portfolio management beyond project selection techniques: Understanding the role of structural alignment, Int. J. Proj. Manag., 33, 129-139.
  • [46] Unger B. N., Kock A., Gemünden H. G., and Jonas D. (2012) Enforcing strategic fit of project portfolios by project termination: An empirical study on senior management involvement, Int. J. Proj. Manag., 30, 675-685.
  • [47] Lim C. S. and Mohamed M. Z. (1999) Criteria of project success: an exploratory re-examination, Int. J. Proj. Manag., 17, 243–248.
  • [48] Bryde D. and Robinson L. (2005) Client versus contractor perspectives on project success criteria, Int. J. Proj. Manag., 23, 622–629.
  • [49] Dvir D., Raz T., and Shenhar A. J. (2003) An empirical analysis of the relationship between project planning and project success, Int. J. Proj. Manag., 21, 89–95.
  • [50] Judgev K. and Müller R. (2005) A Retrospective Look at Our Evolving Understanding of Project Success, Proj. Manag. J., 36, 19–31.
  • [51] Kerzner H. R. (2013) Project Management: A Systems Approach to Planning, Scheduling, and Controlling, 11th ed. John Wiley & Sons, USA.
  • [52] Davis K. (2014) Different stakeholder groups and their perceptions of project success, Int. J. Proj. Manag., 32, 189–201.
  • [53] Kloppenborg T. J., Tesch D., and Manolis C. (2014) Project Success and Executive Sponsor Behaviors: Empirical Life Cycle Stage Investigations, Proj. Manag. Institude Res. Conf., 45, 9–20.
  • [54] Alzahrani J. I. and Emsley M. W. (2013) The impact of contractors’ attributes on construction project success: A post construction evaluation, Int. J. Proj. Manag., 31, 313–322.
  • [55] Waia S. H., Aminah M. Y., and Syuhaida I. (2013)Social Infrastructure Project Success Criteria – An Exploratory Study, Int. J. Constr. Manag., 13, 95–104.
  • [56] Drury-Grogan M. L. (2014) Performance on agile teams: Relating iteration objectives and critical decisions to project management success factors, Inf. Softw. Technol., 56, 506–515.
  • [57] Toor S.R. and Ogunlana S. O. (2010) Beyond the ‘iron triangle’: Stakeholder perception of key performance indicators (KPIs) for large-scale public sector development projects, Int. J. Proj. Manag., 28, 228–236.
  • [58] Lauras M., G. Marques, and D. Gourc (2010) Towards a multi-dimensional project Performance Measurement System, Decis. Support Syst., 48, 342–353.
  • [59] Dvir D., Ben-David A., Sadeh A., and Shenhar A. J. (2006) Critical managerial factors affecting defense projects success: A comparison between neural network and regression analysis, Eng. Appl. Artif. Intell., 19, 535–543.
  • [60] Mir F. A. and Pinnington A. H. (2014) Exploring the value of project management: Linking Project Management Performance and Project Success, Int. J. Proj. Manag., 32, 202–217.
  • [61] Cserháti G. and Szabó L. (2014) The relationship between success criteria and success factors in organisational event projects,” Int. J. Proj. Manag., 32, 202–217.
  • [62] Heising W. (2012)The integration of ideation and project portfolio management — A key factor for sustainable success, Int. J. Proj. Manag., 30, 582–595.
  • [63] Shenhar A. and Dvir D. (2007) Reinventing Project Management: The Diamond Approach to Successful Growth and Innovation. Harvard Business Press,.USA.
  • [64] Serrador P. and Turner J. R., (2014) The Relationship between Project Success and Project Efficiency, Procedia - Soc. Behav. Sci.,119, 75 – 84.
  • [65] Carmines E. G. and Zeller R. A. (1979) Reliability and Validity Assessment. New- bury Park, CA.: Sage, USA.
  • [66] Hair J. F., Anderson R. E., Tatham R. E., and Black W. C. (1995) Structural Equation Modeling,” in Multivariate Data Analysis with Readings, Forth ed., 617–671 Prentice Hall, USA.
  • [67] Sharma S. (1996) Covariance Structure Models, in Applied Multivariate Techniques, John Wiley & Sons, 419–455, USA.
  • [68] Maruyama G. M. (1998) Basics of Structural Equation Modeling. California: SAGE Publications, USA.
  • [69] Schumacker R. E. and Lomax R. G. (2004) A Beginner’s Guide to Structural Equation Modeling, Second Ed. London: Lawrence Erlbaum Associates, Publishers, ENGLAND.
  • [70] Byrne B. M. (2001) Structural Equation Modeling with AMOS. London: Lawrence Erlbaum Associates, Publishers, ENGLAND.
  • [71] Akın Ü., Akın A., and Abacı R. (2007) Öz-Duyarlılık Ölçeği: Gerçeklik ve Güvenilirlik Çalışması,” Hacettepe Üniversitesi Eğitim Fakültesi Derg., 33, 1–10.
  • [72] Demir S. B. and Akengin H. (2010) Sosyal Bilgiler Tutum Ölçeği, E-International J. Educ. Res.,1, 26–40.
  • [73] Mulaik S. A., James L. R., Alstine J. V., Bennett N., Lind S., and Stilwell C. D.(1989) Evaluation of goodness-of-fit indices for structural equation models.,”Psychol. Bull., 105, 430–445.
  • [74] Hooper, D., Coughlan, J., Mullen, M. (2008) Structural Equation Modelling: Guidelines for Determining Model Fit. Electronic Journal of Business Research Methods, 61 53-60.
  • [75] A. Morris, P.W.G., Jamieson, “Moving from corporate strategy to project strategy,” Proj. Manag. J., vol. 36, pp. 5–18, 2005.
  • [76] Prencipe A. andTell F. (2001) Inter-project learning: processes and outcomes of knowledge codification in project-based firms, Res. Policy, 30, 1374–1394.
  • [77] Söderlund J. and Tell F. (2009) The P-form organization and the dynamics of project competence: project epochs in Asea/Abb, 1950–2000, Int. J. Proj. Manag., 27, 101–112.
  • [78] Söderlund J. (2004) Building theories of project management: past research, questions for the future, Int. J. Proj. Manag., 22,183–191.
  • [79] Brucker P., Drexl A., Rolf M., and Neumann K. (1999) Resource-constrained project scheduling: Notation , classi ® cation , models , and methods, Eur. J. Oper. Res., 112, 3–41.
  • [80] Kolisch R. (1999) Resource Allocation Capabilities of Commercial Project Management Software Packages, Interfaces, 29, no. 4, 19–31.
  • [81] Bouleimen K. and Lecocq H. (2003) A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version, Eur. J. Oper. Res., 149, 268–281.
  • [82] Kolisch R. and Hartmann S. (2006) Experimental investigation of heuristics for resource-constrained project scheduling: An update, Eur. J. Oper. Res., 174, 23–37.
  • [83] Wei C. C., Liu P.H., and Tsai Y.C. (2002) Resource-constrained project management using enhanced theory of constraint, Int. J. Proj. Manag., vol. 20, 561–567.
  • [84] Jugdev K., Mathur G., and Fung T. S. (2007) Project management assets and their relationship with the project management capability of the firm, Int. J. Proj. Manag., 25, 560–568.
There are 84 citations in total.

Details

Primary Language English
Journal Section Research Articles
Authors

Dilek Özdemir Güngör This is me

Sıtkı Gözlü This is me

Publication Date June 1, 2016
Submission Date October 1, 2015
Published in Issue Year 2016 Volume: 34 Issue: 2

Cite

Vancouver Özdemir Güngör D, Gözlü S. AN ANALYSIS OF THE LINKS BETWEEN PROJECT SUCCESS FACTORS AND PROJECT PERFORMANCE. SIGMA. 2016;34(2):223-39.

IMPORTANT NOTE: JOURNAL SUBMISSION LINK https://eds.yildiz.edu.tr/sigma/