TR
EN
Development of an Internal Safety Evaluation Program for Ready Mixed Concrete Producers
Abstract
The aim of this study is to assist the safety specialists and departments in ready mixed concrete (RMC) industry by preparing an internal safety evaluation program (ISEP). To constitute an ISEP the 287-item control list was created and grouped as negligible, moderate, and critical. The control list was applied to thirteen RMC plants which belongs to one RMC company. It is found that even the same company cannot ensure stability in terms of OHS between its plants, none of the plants had an approved OHS policy, emergency action plan and a plant entrance OHS warning sign. OHS training was mostly missing in plants.
Keywords
References
- [1] Unsar, S., Sut, N., General assessment of the occupational accidents that occurred in Turkey between the years 2000 and 2005. Saf Sci. 47:614–619, 2009.
- [2] Hinze, J.W., Construction Safety. New Jersey: Prentice Hall Publications; 1997.
- [3] Ringen, K., Seegal, J., Safety and health in construction industry. Annu Rev Public Health.16:165–188, 1995.
- [4] Lım, S., Oh, A., Won, J., Chon, J., Improvement of inspection system for reduction of small-scale construction site accident in Korea. Ind Health. 56:466-474, 2018
- [5] Cameron, I., Hare, B., Davies, R., Fatal and major construction accidents: a comparison between Scotland and the rest of Great Britain. Saf Sci. 46:692–708, 2008.
- [6] Ale, B.J.M., Bellamy, L.J., Baksteen, H., et al., Accidents in the construction industry in the Netherlands: An analysis of accident reports using Storybuilder. Reliability Eng Syst Saf. 93:1523–1533, 2008.
- [7] Arquillos, A.L., Romero, J.C.R., Gibb, A., Analysis of construction accidents in Spain, 2003-2008. J Saf Res. 43:381–388, 2012.
- [8] Colak, B., Etiler, N., Bicer, U., Fatal occupational injuries in the construction sector in Kocaeli, Turkey, 1990-2001. Ind Health. 42:424-430, 2004.
Details
Primary Language
English
Subjects
Civil Engineering
Journal Section
Research Article
Authors
Publication Date
March 1, 2022
Submission Date
March 6, 2020
Acceptance Date
September 28, 2020
Published in Issue
Year 2022 Volume: 33 Number: 2
APA
Akboğa Kale, Ö. (2022). Development of an Internal Safety Evaluation Program for Ready Mixed Concrete Producers. Teknik Dergi, 33(2), 11681-11705. https://doi.org/10.18400/tekderg.699837
AMA
1.Akboğa Kale Ö. Development of an Internal Safety Evaluation Program for Ready Mixed Concrete Producers. Teknik Dergi. 2022;33(2):11681-11705. doi:10.18400/tekderg.699837
Chicago
Akboğa Kale, Özge. 2022. “Development of an Internal Safety Evaluation Program for Ready Mixed Concrete Producers”. Teknik Dergi 33 (2): 11681-705. https://doi.org/10.18400/tekderg.699837.
EndNote
Akboğa Kale Ö (March 1, 2022) Development of an Internal Safety Evaluation Program for Ready Mixed Concrete Producers. Teknik Dergi 33 2 11681–11705.
IEEE
[1]Ö. Akboğa Kale, “Development of an Internal Safety Evaluation Program for Ready Mixed Concrete Producers”, Teknik Dergi, vol. 33, no. 2, pp. 11681–11705, Mar. 2022, doi: 10.18400/tekderg.699837.
ISNAD
Akboğa Kale, Özge. “Development of an Internal Safety Evaluation Program for Ready Mixed Concrete Producers”. Teknik Dergi 33/2 (March 1, 2022): 11681-11705. https://doi.org/10.18400/tekderg.699837.
JAMA
1.Akboğa Kale Ö. Development of an Internal Safety Evaluation Program for Ready Mixed Concrete Producers. Teknik Dergi. 2022;33:11681–11705.
MLA
Akboğa Kale, Özge. “Development of an Internal Safety Evaluation Program for Ready Mixed Concrete Producers”. Teknik Dergi, vol. 33, no. 2, Mar. 2022, pp. 11681-05, doi:10.18400/tekderg.699837.
Vancouver
1.Özge Akboğa Kale. Development of an Internal Safety Evaluation Program for Ready Mixed Concrete Producers. Teknik Dergi. 2022 Mar. 1;33(2):11681-705. doi:10.18400/tekderg.699837