Effect of Sub-Contractor Selection on Construction Project Success in Turkey
Abstract
Keywords
References
- Doloi, H., Iyer, K.C. and Sawhney, A., Structural equation model for assessing impacts of contractor’s performance on project success, International Journal of Project Management, Vol. 29, pp. 687-695, 2011.
- El-Mashaleh, M. S., A construction subcontractor selection model, Jordan Journal of Civil Engineering, Vol. 3., No.4, pp. 375-378, 2009.
- Ng, S. T.; Luu, C. D. T., Modelling subcontractor registration decisions through case-based reasoning approach, Automation in Construction Vol. 17, No. 7, pp. 873–881, 2008.
- Benjaoran, V., A cost control system development: A collaborative approach for small and medium-sized contractors, International Journal of Project Management, Vol. 27, pp. 270–277, 2009.
- Albino V and Garavelli A.C., A neural network application to subcontractor rating in construction firms, International Journal of Project Management, Vol. 16, pp. 9–14, 1998.
- Mbachu, J., Conceptual framework for the assessment of subcontractors’ eligibility and performance in the construction industry, Construction Management and Economics Vol.26, pp. 471–484, 2008.
- Marzouk M. M., El-Kherbawy A. A. and Khalifa M., Factors influencing sub-contractors selection in construction projects, HBRC Journal, Vol. 9, No.2, pp. 150–158, 2013.
- Hinze J. and Tracey A.2 Contractor-subcontractor relationship: the subcontractor's view, Journal of Construction Engineering and Management, Vol. 120, No. 2, pp. 274–287, 1994.
Details
Primary Language
English
Subjects
Civil Engineering
Journal Section
Research Article
Publication Date
July 1, 2022
Submission Date
May 4, 2020
Acceptance Date
March 1, 2021
Published in Issue
Year 2022 Volume: 33 Number: 4
Cited By
İnşaat Projelerinde Kalite Performansını Etkileyen Faktörler: Türkiye’de Bir Alan Çalışması
Teknik Dergi
https://doi.org/10.18400/tekderg.1015939Analysis of Factors Affecting the Success of Sustainable Development Projects with the Help of Machine Learning Tools
Discrete Dynamics in Nature and Society
https://doi.org/10.1155/2022/1956879Scheduling, Management and Optimization of Construction Process
Teknik Dergi
https://doi.org/10.18400/tekderg.981601Pythagorean Fuzzy AHP Based Dynamic Subcontractor Management Framework
Buildings
https://doi.org/10.3390/buildings13051351Multiple stakeholders’ critical success factors scale for success on large construction projects
Asian Journal of Civil Engineering
https://doi.org/10.1007/s42107-023-00871-3The application of Bayesian network analysis in demystifying construction project subcontracting complexities for developing countries
Journal of Financial Management of Property and Construction
https://doi.org/10.1108/JFMPC-07-2023-0038A non-price-based tender evaluation methodology considering tenderers’ self-confidence with partial value functions and time decay analysis
Expert Systems with Applications
https://doi.org/10.1016/j.eswa.2024.124186Machine learning-based dynamic model for on-site subcontractor performance management
Engineering, Construction and Architectural Management
https://doi.org/10.1108/ECAM-11-2024-1563A multi-objective multi-period mathematical programming model for integrated project portfolio optimization and contractor selection
MethodsX
https://doi.org/10.1016/j.mex.2025.103522Subcontractor Selection for a Construction Project: Optimal Plan
Journal of Construction Engineering and Management
https://doi.org/10.1061/JCEMD4.COENG-16409Quotation impact factors for general contractors: a viewpoint from private sectors in Taiwan
Journal of Civil Engineering and Management
https://doi.org/10.3846/jcem.2025.24803Design-build entity selection in public construction projects: a sustainable multi-criteria group model
International Journal of Construction Management
https://doi.org/10.1080/15623599.2026.2643745The effects of scope creep on project success in construction project management: mediating role of best practices for preventing scope creep
International Journal of Construction Management
https://doi.org/10.1080/15623599.2026.2628232