Contract prices on
construction works have high importance among public expenses, and, thus,
minimum contract price has to be ensured in the tender process. However, it is
not clear whether or not the construction work contract price is affected by
tendering procedures and/or contract type. This study aims at investigating the
relationship between (1) contract price and tendering procedure (2) contract
price and contract type (3) contract price/approximate cost ratio and tendering
procedure. Within this context, the data of construction works between the
years 2007 and 2017 have been analyzed. The results show that both the
tendering procedure and the contract type have a statistically significant
effect on the contract prices. In addition, negotiated tender procedure causes
a statistical significance on the contract price/approximate cost ratio.
Yapım işlerinde
sözleşme bedeli kamu harcamaları içinde büyük öneme sahiptir ve dolayısıyla en
düşük bedelli sözleşmenin ihale sürecinde sağlanması gerekmektedir. Ancak,
yapım işi sözleşme bedelinin ihale usullerinden ve/veya sözleşme türünden
etkilenip etkilenmediği konusunda açıklık yoktur. Bu çalışma, (1) sözleşme
bedeli ve ihale usulü (2) sözleşme bedeli ve sözleşme türü (3) sözleşme
bedeli/yaklaşık maliyet oranı ve ihale usulü arasındaki ilişkinin araştırılması
amaçlamaktadır. Bu kapsamda 2007 ve 2017 yılları arasında gerçekleşen yapım
işleri verileri analiz edilmiştir. Sonuçlar, ihale usulü ve sözleşme türünün
sözleşme bedelleri üzerinde istatistiksel olarak anlamlı etkisi olduğunu
göstermektedir. Ayrıca, pazarlık usulü ihale türü, sözleşme bedeli/yaklaşık
maliyet oranında istatistiksel olarak farka neden olmaktadır.
Primary Language | Turkish |
---|---|
Subjects | Civil Engineering |
Journal Section | Articles |
Authors | |
Publication Date | January 1, 2020 |
Submission Date | September 7, 2018 |
Published in Issue | Year 2020 Volume: 31 Issue: 1 |