| APA |
Sagaf, M. (2020). PREDICTING BOILER EFFICIENCY DETERIORATION USING ENERGY BALANCE METHOD: CASE STUDY IN 660 MW POWER PLANT JEPARA, CENTRAL JAVA, INDONESIA. Journal of Thermal Engineering, 6(6), 247-256. https://doi.org/10.18186/thermal.821052
|
|
| AMA |
Sagaf M. PREDICTING BOILER EFFICIENCY DETERIORATION USING ENERGY BALANCE METHOD: CASE STUDY IN 660 MW POWER PLANT JEPARA, CENTRAL JAVA, INDONESIA. Journal of Thermal Engineering. December 2020;6(6):247-256. doi:10.18186/thermal.821052
|
|
| Chicago |
Sagaf, Muhammad. “PREDICTING BOILER EFFICIENCY DETERIORATION USING ENERGY BALANCE METHOD: CASE STUDY IN 660 MW POWER PLANT JEPARA, CENTRAL JAVA, INDONESIA”. Journal of Thermal Engineering 6, no. 6 (December 2020): 247-56. https://doi.org/10.18186/thermal.821052.
|
|
| EndNote |
Sagaf M (December 1, 2020) PREDICTING BOILER EFFICIENCY DETERIORATION USING ENERGY BALANCE METHOD: CASE STUDY IN 660 MW POWER PLANT JEPARA, CENTRAL JAVA, INDONESIA. Journal of Thermal Engineering 6 6 247–256.
|
|
| IEEE |
M. Sagaf, “PREDICTING BOILER EFFICIENCY DETERIORATION USING ENERGY BALANCE METHOD: CASE STUDY IN 660 MW POWER PLANT JEPARA, CENTRAL JAVA, INDONESIA”, Journal of Thermal Engineering, vol. 6, no. 6, pp. 247–256, 2020, doi: 10.18186/thermal.821052.
|
|
| ISNAD |
Sagaf, Muhammad. “PREDICTING BOILER EFFICIENCY DETERIORATION USING ENERGY BALANCE METHOD: CASE STUDY IN 660 MW POWER PLANT JEPARA, CENTRAL JAVA, INDONESIA”. Journal of Thermal Engineering 6/6 (December2020), 247-256. https://doi.org/10.18186/thermal.821052.
|
|
| JAMA |
Sagaf M. PREDICTING BOILER EFFICIENCY DETERIORATION USING ENERGY BALANCE METHOD: CASE STUDY IN 660 MW POWER PLANT JEPARA, CENTRAL JAVA, INDONESIA. Journal of Thermal Engineering. 2020;6:247–256.
|
|
| MLA |
Sagaf, Muhammad. “PREDICTING BOILER EFFICIENCY DETERIORATION USING ENERGY BALANCE METHOD: CASE STUDY IN 660 MW POWER PLANT JEPARA, CENTRAL JAVA, INDONESIA”. Journal of Thermal Engineering, vol. 6, no. 6, 2020, pp. 247-56, doi:10.18186/thermal.821052.
|
|
| Vancouver |
Sagaf M. PREDICTING BOILER EFFICIENCY DETERIORATION USING ENERGY BALANCE METHOD: CASE STUDY IN 660 MW POWER PLANT JEPARA, CENTRAL JAVA, INDONESIA. Journal of Thermal Engineering. 2020;6(6):247-56.
|
|