Factors Influencing Schedule Management Delays on Residential Projects in China - A Case Study of Yun Yue Dong Fang Project

Volume: 36 Number: 6 November 3, 2025
TR EN

Factors Influencing Schedule Management Delays on Residential Projects in China - A Case Study of Yun Yue Dong Fang Project

Abstract

With the rapid development of China's property industry, residential construction projects face significant schedule delays due to inadequate progress management. It makes it difficult for enterprises to realize the return of funds on time, causing economic losses and reputational damage which brings serious economic losses and loss of corporate reputation. This study aims to identify and prioritize delay factors and propose effective control measures. Qualitative research methods, including semi-structured interviews, are used to collect data from the Yun Yue Dong Fang residential project in China, a case study, and analyze the influencing factors of project schedule management. Like construction, design, materials, finance, communication, non-human elements, planning, and supervision. Results show construction factors (particularly execution efficiency, funding timeliness, and resource allocation) dominate, as evidenced by their highest word frequency in interview coding. Followed by client factors, while the factors related to the design teams, as well as the factors related to the raw material and equipment suppliers have less impact. The study proposes strengthening control through integrated management systems and real-time monitoring, validated by the case study, to mitigate delays. The results of the study provide actionable insights for optimizing schedule management in residential projects as well as the project schedule management of residential development enterprises and enhancing enterprise performance.

Keywords

References

  1. Abbasi, O., Noorzai, E., Gharouni Jafari, K., & Golabchi, M. (2020). Exploring the Causes of Delays in Construction Industry Using a Cause-and-Effect Diagram: Case Study for Iran. Journal of Architectural Engineering, 26(3). https://doi.org/10.1061/(ASCE)AE.1943-5568.0000431
  2. Abdul Nabi, M., & El-adaway, I. H. (2021). Understanding the Key Risks Affecting Cost and Schedule Performance of Modular Construction Projects. Journal of Management in Engineering, 37(4). https://doi.org/10.1061/(ASCE)ME.1943-5479.0000917
  3. Acebes, F., Poza, D., González-Varona, J. M., & López-Paredes, A. (2022). Stochastic Earned Duration Analysis for Project Schedule Management. Engineering, 9, 148–161. https://doi.org/10.1016/j.eng.2021.07.019
  4. Adnan, T., Maleque, M. S. E., Jamal, M. S., & Sobuz, M. H. R. (2020). Factors affecting delay and safety on construction projects in Bangladesh. Proceedings of the 5th International Conference on Civil Engineering for Sustainable Development (ICCESD 2020), 7–9.
  5. Ahmed, R., Hussain, A., & Philbin, S. P. (2022). Moderating Effect of Senior Management Support on the Relationship Between Schedule Delay Factors and Project Performance. Engineering Management Journal, 34(3), 374–393. https://doi.org/10.1080/10429247.2021.1940033
  6. Alshakhrit, A. K., Supeni, E. E., & Zahari, N. I. (2019). Causes and effects of delays in Saudi Arabian construction projects. Journal of Global Economics, Management and Business Research, 11(4), 165–174.
  7. Alsuliman, J. A. (2019). Causes of delay in Saudi public construction projects. Alexandria Engineering Journal, 58(2), 801–808. https://doi.org/10.1016/J.AEJ.2019.07.002
  8. Amusan, L. M., Afolabi, A., Ojelabi, R., Omuh, I., & Okagbue, H. I. (2018). Data exploration on factors that influences construction cost and time performance on construction project sites. Data in Brief, 17, 1320–1325. https://doi.org/10.1016/j.dib.2018.02.035

Details

Primary Language

English

Subjects

Civil Construction Engineering, Architectural Engineering

Journal Section

Research Article

Early Pub Date

May 9, 2025

Publication Date

November 3, 2025

Submission Date

October 23, 2024

Acceptance Date

May 5, 2025

Published in Issue

Year 2025 Volume: 36 Number: 6

APA
Hengbing, Y., Terh Jing, K., Qinghua, L., & Yao, L. (2025). Factors Influencing Schedule Management Delays on Residential Projects in China - A Case Study of Yun Yue Dong Fang Project. Turkish Journal of Civil Engineering, 36(6), 1-25. https://doi.org/10.18400/tjce.1571706
AMA
1.Hengbing Y, Terh Jing K, Qinghua L, Yao L. Factors Influencing Schedule Management Delays on Residential Projects in China - A Case Study of Yun Yue Dong Fang Project. TJCE. 2025;36(6):1-25. doi:10.18400/tjce.1571706
Chicago
Hengbing, Yin, Khoo Terh Jing, Liu Qinghua, and Li Yao. 2025. “Factors Influencing Schedule Management Delays on Residential Projects in China - A Case Study of Yun Yue Dong Fang Project”. Turkish Journal of Civil Engineering 36 (6): 1-25. https://doi.org/10.18400/tjce.1571706.
EndNote
Hengbing Y, Terh Jing K, Qinghua L, Yao L (November 1, 2025) Factors Influencing Schedule Management Delays on Residential Projects in China - A Case Study of Yun Yue Dong Fang Project. Turkish Journal of Civil Engineering 36 6 1–25.
IEEE
[1]Y. Hengbing, K. Terh Jing, L. Qinghua, and L. Yao, “Factors Influencing Schedule Management Delays on Residential Projects in China - A Case Study of Yun Yue Dong Fang Project”, TJCE, vol. 36, no. 6, pp. 1–25, Nov. 2025, doi: 10.18400/tjce.1571706.
ISNAD
Hengbing, Yin - Terh Jing, Khoo - Qinghua, Liu - Yao, Li. “Factors Influencing Schedule Management Delays on Residential Projects in China - A Case Study of Yun Yue Dong Fang Project”. Turkish Journal of Civil Engineering 36/6 (November 1, 2025): 1-25. https://doi.org/10.18400/tjce.1571706.
JAMA
1.Hengbing Y, Terh Jing K, Qinghua L, Yao L. Factors Influencing Schedule Management Delays on Residential Projects in China - A Case Study of Yun Yue Dong Fang Project. TJCE. 2025;36:1–25.
MLA
Hengbing, Yin, et al. “Factors Influencing Schedule Management Delays on Residential Projects in China - A Case Study of Yun Yue Dong Fang Project”. Turkish Journal of Civil Engineering, vol. 36, no. 6, Nov. 2025, pp. 1-25, doi:10.18400/tjce.1571706.
Vancouver
1.Yin Hengbing, Khoo Terh Jing, Liu Qinghua, Li Yao. Factors Influencing Schedule Management Delays on Residential Projects in China - A Case Study of Yun Yue Dong Fang Project. TJCE. 2025 Nov. 1;36(6):1-25. doi:10.18400/tjce.1571706

Cited By