EN
Maintenance Performance of the Kwanyaku Water Treatment Plant
Abstract
The study assessed the Maintenance Performance of the Kwanyaku Water Treatment Plant. Availability and reliability of eleven facilities from the old and Jubilee treatment plants were compared. Twenty respondents view on the Maintenance Schedule at the Kwanyaku Headworks was also obtained. The t-test was the main statistical tool used with an alpha level of 0.05. There were significant differences in the availability of the equipment at the two treatment plants where the old recorded 93.33% better than the jubilee 77.50%. Also, there were significant differences in the average reliability of 48.20 days and 11.00 days for the facilities at the old and the jubilee plants respectively which fell below the GWCL benchmark and plant manufactures’ standard. The assessment further revealed significant differences in the maintainability of the two plants which were within the GWCL benchmark of 1 – 5 hours. Finally, the study revealed that the main causes of frequent plants and equipment failure at the treatment plant were power outages and instrumentation issues
Keywords
References
- Atepor , L. (2005a). Plant maintenance and work services: Plant I (Lecture note). Cape Coast, Ghana. Cape Coast Polytechnic, Mechanical Department.
- Atepor , L. (2005b). Plant maintenance and work services: Plant II (Lecture note). Cape Coast, Ghana. Cape Coast Polytechnic, Mechanical Department.
- Camp, R. C. (1989). Benchmarking: the search for industry best practice that lead to superior performance. Milwaukee,WI: Quality Press, pp.168-170.
- Campbell, J. D. (1995). Uptime - Strategies for excellence in maintenance management. London: Productivity Press.
- Clifton, R. H. (1987). Principles of planned maintenance. London: Edward Arnold (Publishers) Ltd., pp.1- 75.
- Davis, M. et. al.(2003). Fundamentals of operation management (4thed). New York, NY: McGraw-Hill Companies Inc., pp. 167-171.
- Dilworth, J. B. (1993). Production and operations management: Manufacturing and services (5thed). Birmingham: McGraw-Hill, Inc., pp 451-459.
- Dunlop, C. L. (1990). A practical guide to maintenance engineering. Borough Green: Butterworth & Co. (Publishers) Ltd., pp. 29-41.
Details
Primary Language
English
Subjects
-
Journal Section
-
Publication Date
July 23, 2016
Submission Date
July 23, 2016
Acceptance Date
-
Published in Issue
Year 2014 Volume: 4 Number: 1
APA
Duodu, E. A., & Owusu-sekyere, J. (2016). Maintenance Performance of the Kwanyaku Water Treatment Plant. TOJSAT, 4(1), 36-44. https://izlik.org/JA24WD49LP
AMA
1.Duodu EA, Owusu-sekyere J. Maintenance Performance of the Kwanyaku Water Treatment Plant. TOJSAT. 2016;4(1):36-44. https://izlik.org/JA24WD49LP
Chicago
Duodu, E. A., and J.D. Owusu-sekyere. 2016. “Maintenance Performance of the Kwanyaku Water Treatment Plant”. TOJSAT 4 (1): 36-44. https://izlik.org/JA24WD49LP.
EndNote
Duodu EA, Owusu-sekyere J (July 1, 2016) Maintenance Performance of the Kwanyaku Water Treatment Plant. TOJSAT 4 1 36–44.
IEEE
[1]E. A. Duodu and J. Owusu-sekyere, “Maintenance Performance of the Kwanyaku Water Treatment Plant”, TOJSAT, vol. 4, no. 1, pp. 36–44, July 2016, [Online]. Available: https://izlik.org/JA24WD49LP
ISNAD
Duodu, E. A. - Owusu-sekyere, J.D. “Maintenance Performance of the Kwanyaku Water Treatment Plant”. TOJSAT 4/1 (July 1, 2016): 36-44. https://izlik.org/JA24WD49LP.
JAMA
1.Duodu EA, Owusu-sekyere J. Maintenance Performance of the Kwanyaku Water Treatment Plant. TOJSAT. 2016;4:36–44.
MLA
Duodu, E. A., and J.D. Owusu-sekyere. “Maintenance Performance of the Kwanyaku Water Treatment Plant”. TOJSAT, vol. 4, no. 1, July 2016, pp. 36-44, https://izlik.org/JA24WD49LP.
Vancouver
1.E. A. Duodu, J.D. Owusu-sekyere. Maintenance Performance of the Kwanyaku Water Treatment Plant. TOJSAT [Internet]. 2016 Jul. 1;4(1):36-44. Available from: https://izlik.org/JA24WD49LP