Research Article
BibTex RIS Cite

A Research on Primary Sludge and Anaerobic Mesophilic Stabilization of Activated Sludge in Biological Nitrogen and Phosphorus Elimination (ISAH-Method) in Chemnitz-Heinersdorf / Germany Pilot Wastewater Treatment Plant

Year 2025, Volume: 9 Issue: 2, 19 - 26

Abstract

The studies for the disposal of a large amount of wastewater treatment sludges from a wastewater treatment plant of a high-level treatment plant for the modernization of the Federal Wastewater Treatment Plant of Chemnitz-Heinersdorf in Germany, and its capacity are included.
The detailed properties of these sludges from the treatment were examined and various sludges formed at the treatment plant stages were mixed one by one and in certain proportions and examined in a mesophilic anaerobic model facility. In the model facility, the properties of the gas and digestion sludge that have come out without digestion have been examined.
A large amount of primary sludge coming out of the treatment plant and a large purification plant made for the experiment were subjected to an anaerobic mesophilic digestion test with a small amount of excessive sludge (biologically active sludge) obtained as a result of nitrogen and phosphorus elimination.
It has been experimentally determined that in the facility where biological nutrient removal (N, P elimination) is performed, it has undergone a significant organic stabilization as opposed to those previously given in the literature. In parallel with these studies, capillary flow times (CST-Tests) were investigated with the help of numerous experiments on sludge types before and after digestion.
Biological sludge mixed with premier sludge gave the best result in dewatering tests.

Ethical Statement

yok

Supporting Institution

Yok

Project Number

yok

Thanks

Bu araştırma makalemi yayınlanmak üzere Turkish Journal of Hydraulic dergisine göndermekten büyükbir gurur duyuyorum. Ülkemizde bilime katkı sunma adına teşekkür ediyorum. İnşallah TR ve SCI ındexlerde buluşmak üzere.

References

  • [1] Üçüncü, O., (1994), A Research on Mesophilic Digestion of Advanced Biological Treatment Plant Sludges, KTÜ, Institute of Science, PhD. Thesis.
  • [2] Temper, U., (1993), Metangaerung von Klaerschlamm und anderen Komplexen Subtraten bei Mesophilen und Thermophilen Temperaturen, Dissertation an der Ludwig-Maximilian Uni, München.
  • [3] Mitsdörfer, R., Demharter, W., Bischofsberger, W., Zweistufufig, (1991), Thermophile Faulung, Betriebserfahrungen an Grosstechnischen Anlagen, Korrospontenz Abwasser 38, S.55-59.
  • [4] Riegler, G., (1982), Aerobe oder anaerobe Klaerschlammstabilisieung? Korrospontenz Abwasser 29, H.11,S.790-802.
  • [5] Weber, H., Kulbe, K.D., Chmiel, H., Trösch, W., (1994), Microbial Acetate conversion to Methane: Kinetics, Yields and Pathways in two-step Digestion Process.Appl.Microbial.Biotechnol., 19,S.224-228.
  • [6] Fuchs, L., Und Jakob, J., (1986), Klaerschlammbehandlung durch aerob-thermophile Stabilisation, Ensorgungspraxis, H.2, S.221-223.
  • [7] Operating instructions for the CST measuring device (2024), http://www.zeitschrift-fuer-umweltrecht.de/zur/hefte/ZUR_03_03.pdf.
  • [8] Üçüncü, O., (2000), My Work at the Kaditz Wastewater Treatment Plant in the City of Dresden/Germany.
  • [9] Süme, V., Daneshfaraz, R., Marangoz, H.O., Aminvash, E., (2025), Sustainable wastewater management: A case study in Rize sewage network, Ain Shams Engineering Journal 16 (5), 103345.

A Research on Primary Sludge and Anaerobic Mesophilic Stabilization of Activated Sludge in Biological Nitrogen and Phosphorus Elimination (ISAH-Method) in Chemnitz-Heinersdorf / Germany Pilot Wastewater Treatment Plant

Year 2025, Volume: 9 Issue: 2, 19 - 26

Abstract

The studies for the disposal of a large amount of wastewater treatment sludges from a wastewater treatment plant of a high-level treatment plant for the modernization of the Federal Wastewater Treatment Plant of Chemnitz-Heinersdorf in Germany, and its capacity are included.
The detailed properties of these sludges from the treatment were examined and various sludges formed at the treatment plant stages were mixed one by one and in certain proportions and examined in a mesophilic anaerobic model facility. In the model facility, the properties of the gas and digestion sludge that have come out without digestion have been examined.
A large amount of primary sludge coming out of the treatment plant and a large purification plant made for the experiment were subjected to an anaerobic mesophilic digestion test with a small amount of excessive sludge (biologically active sludge) obtained as a result of nitrogen and phosphorus elimination.
It has been experimentally determined that in the facility where biological nutrient removal (N, P elimination) is performed, it has undergone a significant organic stabilization as opposed to those previously given in the literature. In parallel with these studies, capillary flow times (CST-Tests) were investigated with the help of numerous experiments on sludge types before and after digestion.
Biological sludge mixed with premier sludge gave the best result in dewatering tests.

Project Number

yok

References

  • [1] Üçüncü, O., (1994), A Research on Mesophilic Digestion of Advanced Biological Treatment Plant Sludges, KTÜ, Institute of Science, PhD. Thesis.
  • [2] Temper, U., (1993), Metangaerung von Klaerschlamm und anderen Komplexen Subtraten bei Mesophilen und Thermophilen Temperaturen, Dissertation an der Ludwig-Maximilian Uni, München.
  • [3] Mitsdörfer, R., Demharter, W., Bischofsberger, W., Zweistufufig, (1991), Thermophile Faulung, Betriebserfahrungen an Grosstechnischen Anlagen, Korrospontenz Abwasser 38, S.55-59.
  • [4] Riegler, G., (1982), Aerobe oder anaerobe Klaerschlammstabilisieung? Korrospontenz Abwasser 29, H.11,S.790-802.
  • [5] Weber, H., Kulbe, K.D., Chmiel, H., Trösch, W., (1994), Microbial Acetate conversion to Methane: Kinetics, Yields and Pathways in two-step Digestion Process.Appl.Microbial.Biotechnol., 19,S.224-228.
  • [6] Fuchs, L., Und Jakob, J., (1986), Klaerschlammbehandlung durch aerob-thermophile Stabilisation, Ensorgungspraxis, H.2, S.221-223.
  • [7] Operating instructions for the CST measuring device (2024), http://www.zeitschrift-fuer-umweltrecht.de/zur/hefte/ZUR_03_03.pdf.
  • [8] Üçüncü, O., (2000), My Work at the Kaditz Wastewater Treatment Plant in the City of Dresden/Germany.
  • [9] Süme, V., Daneshfaraz, R., Marangoz, H.O., Aminvash, E., (2025), Sustainable wastewater management: A case study in Rize sewage network, Ain Shams Engineering Journal 16 (5), 103345.
There are 9 citations in total.

Details

Primary Language English
Subjects Water Resources and Water Structures
Journal Section Research Article
Authors

Osman Üçüncü 0000-0002-8369-4487

Project Number yok
Early Pub Date November 25, 2025
Publication Date November 26, 2025
Submission Date July 15, 2025
Acceptance Date August 21, 2025
Published in Issue Year 2025 Volume: 9 Issue: 2

Cite

APA Üçüncü, O. (2025). A Research on Primary Sludge and Anaerobic Mesophilic Stabilization of Activated Sludge in Biological Nitrogen and Phosphorus Elimination (ISAH-Method) in Chemnitz-Heinersdorf / Germany Pilot Wastewater Treatment Plant. Türk Hidrolik Dergisi, 9(2), 19-26.