Abstract

Throughout the study, the operational and long term investment performances of various power plants in Turkey are assessed and compared using Stochastic Frontier Analysis (SFA) and Data Envelopment Analysis (DEA). The data set is composed of 65 thermal, hydro and wind power plants with private and public ownership. Efficiency indices, reflecting operational and investment performance, are described and elaborated. Returns to scale, (constant and variable), assurance region, slack based measure, system comparison and bilateral type DEA models as well as stochastic frontier analysis employing the Cobb-Douglas and Translog production functions are used in the analysis. An analysis of returns to scale is carried out. The properties of the production frontiers are described for all efficiency indices. Public-private sector plants, renewable-thermal plants as well as natural gas-coal versus oil fired plants are compared according to their efficiency performance values. Efficiency scores obtained from DEA and SFA are compared and some relationships are identified. Interesting relationship are identified by elaborating the efficiency indices and various input/output factors. Even though natural gas fired power plants outperforms the coal fired ones in terms of investment efficiency, in general, reverse is true for operational performance under variable returns to scale.

Keywords

References

  1. Aigner, D.J., Lovell, C.A.K. and Schmidt P. (1977) Formulation and Estimation of Stochastic Frontier Production Function Models. Journal of Econometrics, 6, 21-37. doi: 10.1016/0304-4076(77)90052-5
  2. Bakos, G.C, Tsagas N.F. (2003) Technoeconomic Assessment of a Hybrid Solar/Wind Installation for Energy Saving, Energy and Buildings, 35, 139-145. doi: 10.1016/S0378-7788(02)00023-3
  3. Banker, R.D., Charnes A. and Cooper W.W. (1984) Some Models for Estimating Technical and Scale Inefficiencies in Data Envelopment Analysis, Management Science, 30(9), 1078-1092. doi: 10.1287/mnsc.30.9.1078
  4. Banker, R.D., Thrall R.M. (1992) Estimating Most Productive Scale Size Using Data Envelopment Analysis, European Journal of Operational Research, 62, 74-84. doi: 10.1016/0377-2217(84)90006-7
  5. Bauer, P.W. (1990) Recent Developments in the Econometric Estimation of Frontiers, Journal of Econometrics, 46, 39-56. doi: 10.1016/0304-4076(90)90046-V
  6. Coelli, T.J. (1992) A Computer Program for Frontier Production Function Estimation: Frontier, Version 2.0., Economics Letters, 39, 29-32. doi: 10.1016/0165-1765(92)90096-H
  7. Coelli, T., Rao, D. S. P., Battese, G. E. (1998) An Introduction to Efficiency and Productivity Analysis, Kluwer Academic Publishers, London.
  8. Charnes, A., Cooper W.W. and Rhodes E. (1978) Measuring the Efficiency of Decision Making Units, European Journal of Operational Research, 2, 429-444. doi: 10.1016/0377-2217(78)90138-8

Details

Primary Language

Turkish

Subjects

Engineering

Journal Section

Research Article

Publication Date

December 8, 2017

Submission Date

August 8, 2016

Acceptance Date

September 18, 2017

Published in Issue

Year 2017 Volume: 22 Number: 3

APA
Sarıca, K. (2017). PARAMETRİK VE PARAMETRİK OLMAYAN VERİMLİLİK DEĞERLENDİRMESİ VE KARŞILAŞTIRILMASI: TÜRKİYE ELEKTRİK SANTRALLERİ ÖRNEĞİ. Uludağ Üniversitesi Mühendislik Fakültesi Dergisi, 22(3), 21-42. https://doi.org/10.17482/uumfd.364087
AMA
1.Sarıca K. PARAMETRİK VE PARAMETRİK OLMAYAN VERİMLİLİK DEĞERLENDİRMESİ VE KARŞILAŞTIRILMASI: TÜRKİYE ELEKTRİK SANTRALLERİ ÖRNEĞİ. UUJFE. 2017;22(3):21-42. doi:10.17482/uumfd.364087
Chicago
Sarıca, Kemal. 2017. “PARAMETRİK VE PARAMETRİK OLMAYAN VERİMLİLİK DEĞERLENDİRMESİ VE KARŞILAŞTIRILMASI: TÜRKİYE ELEKTRİK SANTRALLERİ ÖRNEĞİ”. Uludağ Üniversitesi Mühendislik Fakültesi Dergisi 22 (3): 21-42. https://doi.org/10.17482/uumfd.364087.
EndNote
Sarıca K (December 1, 2017) PARAMETRİK VE PARAMETRİK OLMAYAN VERİMLİLİK DEĞERLENDİRMESİ VE KARŞILAŞTIRILMASI: TÜRKİYE ELEKTRİK SANTRALLERİ ÖRNEĞİ. Uludağ Üniversitesi Mühendislik Fakültesi Dergisi 22 3 21–42.
IEEE
[1]K. Sarıca, “PARAMETRİK VE PARAMETRİK OLMAYAN VERİMLİLİK DEĞERLENDİRMESİ VE KARŞILAŞTIRILMASI: TÜRKİYE ELEKTRİK SANTRALLERİ ÖRNEĞİ”, UUJFE, vol. 22, no. 3, pp. 21–42, Dec. 2017, doi: 10.17482/uumfd.364087.
ISNAD
Sarıca, Kemal. “PARAMETRİK VE PARAMETRİK OLMAYAN VERİMLİLİK DEĞERLENDİRMESİ VE KARŞILAŞTIRILMASI: TÜRKİYE ELEKTRİK SANTRALLERİ ÖRNEĞİ”. Uludağ Üniversitesi Mühendislik Fakültesi Dergisi 22/3 (December 1, 2017): 21-42. https://doi.org/10.17482/uumfd.364087.
JAMA
1.Sarıca K. PARAMETRİK VE PARAMETRİK OLMAYAN VERİMLİLİK DEĞERLENDİRMESİ VE KARŞILAŞTIRILMASI: TÜRKİYE ELEKTRİK SANTRALLERİ ÖRNEĞİ. UUJFE. 2017;22:21–42.
MLA
Sarıca, Kemal. “PARAMETRİK VE PARAMETRİK OLMAYAN VERİMLİLİK DEĞERLENDİRMESİ VE KARŞILAŞTIRILMASI: TÜRKİYE ELEKTRİK SANTRALLERİ ÖRNEĞİ”. Uludağ Üniversitesi Mühendislik Fakültesi Dergisi, vol. 22, no. 3, Dec. 2017, pp. 21-42, doi:10.17482/uumfd.364087.
Vancouver
1.Kemal Sarıca. PARAMETRİK VE PARAMETRİK OLMAYAN VERİMLİLİK DEĞERLENDİRMESİ VE KARŞILAŞTIRILMASI: TÜRKİYE ELEKTRİK SANTRALLERİ ÖRNEĞİ. UUJFE. 2017 Dec. 1;22(3):21-42. doi:10.17482/uumfd.364087

Cited By

Announcements:

30.03.2021-Beginning with our April 2021 (26/1) issue, in accordance with the new criteria of TR-Dizin, the Declaration of Conflict of Interest and the Declaration of Author Contribution forms fulfilled and signed by all authors are required as well as the Copyright form during the initial submission of the manuscript. Furthermore two new sections, i.e. ‘Conflict of Interest’ and ‘Author Contribution’, should be added to the manuscript. Links of those forms that should be submitted with the initial manuscript can be found in our 'Author Guidelines' and 'Submission Procedure' pages. The manuscript template is also updated. For articles reviewed and accepted for publication in our 2021 and ongoing issues and for articles currently under review process, those forms should also be fulfilled, signed and uploaded to the system by authors.