Pre-Enrichment of Lead-Zinc Leaching Tailings by Hydrocyclone
Abstract
In this study, pre-enrichment of a typical lead-zinc leaching plant solid tailings were investigated. After the leaching process, due to the decrease in the grain size of the residual minerals (filter cake) and the deterioration of the mineral crystal structures, a concentrate with high recovery for lead (Pb) and zinc (Zn) could not be obtained with mineral enrichment methods / machines such as flotation, multi-gravity separator (MGS), shaking table and Knelson separator. It was determined that the Pb and Zn minerals were concentrated in very fine fractions (<75 µm) by chemical analyzes according to grain size fraction. Thus, it was decided to perform the enrichment method according to the grain size classification and 150 micron sieve and hydrocyclone were used respectively in the enrichment process. After the sieving, a concentration (51.35% by weight) was obtained with 86.64% Pb and 64.84% Zn recoveries. The enrichment process was continued with a series of hydrocyclone experiments using the obtained pre-concentrate. The highest recoveries for Pb and Zn with hydrocyclone experiments were obtained as 71.18% and 52.6%, respectively. As a result, it was found appropriate to disperse the agglomerated coarse sized grains using a roller and/or bar mill prior to sieving to obtain a concentrate with higher recovery.
Keywords
Lead,Zinc,Leach tailing,Hydrocyclone,Mineral processing,Mineral enrichment
References
- Abdel-Aal, EA., 2000. Kinetics of sulphuric acid leaching of low-grade zinc silicate ore. Hydrometallurgy. 55;3: 247–254.
- Altundoğan, HS., Erdem, M., Orhan, R., 1998. Heavy metal pollution potential of zinc leach residues discarded in Çinkur plant. Tr. Journal of Engineering and Environmental Science. 22;3: 167–178.
- Fujimoto, R.C., Maruyama, K., Miki, T., Nagasaka, T., 2016. The selective alkaline leaching of zinc oxide from electric arc furnace dust pre-treated with calcium oxide. Hydrometallurgy. 159: 120–125.
- Güler, E., Seyrankaya, A., Cocen, I., 2011. Hydrometallurgical evaluation of zinc leach plant residue. Asian Journal of Chemistry. 23;7: 2879-2888.
- Jha, MK., Kumar, V., Singh, RJ., 2001. Review of hydrometallurgical recovery of zinc from industrial wastes. Resources, Conservation and Recycling. 33: 1–22.
- Kul, M., Topkaya, Y., 2008. Recovery of germanium and other valuable metals from zinc plant residues. Hydrometallurgy. 92;3: 87–94.
- Lin, M., 2000. Alkaline leaching of metal melting industry wastes and separation of zinc and lead in the leach solution. Journal of Environmental Sciences. 12;4: 452–457.
- Özverdi, A., Erdem, M., 2010. Environmental risk assessment and stabilization/solidification of zinc extraction residue: I. Environmental risk assessment. Hydrometallurgy. 100;3: 103–109.
- Ruşen, A., Sunka,r AS., Topkaya, YA., 2008. Zinc and lead extraction from Çinkur leach residues by using hydrometallurgical method. Hydrometallurgy. 93: 45–50.
- Şahin, M., Erdem, M., 2015. Cleaning of high lead-bearing zinc leaching residue by recovery of lead with alkaline leaching. Hydrometallurgy. 153: 170–178.