Akiş Tipi Çizelgeleme Üzerine Bir Uygulama
Öz
Anahtar Kelimeler
References
- Ashour, S. (1970). An experimental investigation and comparative evaluation of flowshop sequencing techniques.
- Operations Research, 18, 541–549. Ben-Daya, M., & Al-Fawzan, M. (1998). A Tabu Search
- Approach for the Flowshop Scheduling Problem. European Journal of Operational Research, 109, 88-95. Bullnheimer, B., Hartl, R.F. & Strauss, C. (1999). A New
- Rank-based Version of the Ant System: A Computational Study. Central European Journal for Operations Research and Economics, 7, 25–38. Campbell, H.G., Dudek, R.A., & Smith B.L. (1970). A
- Heuristic Algorithm for the n Job m Machine Sequencing Problem. Management Science, 16, 10-16. Colorni, A., Dorigo, M., & Maniezzo, V. (1992a).
- Distributed optimization by ant colonies. In F. J. Varela & P. Bourgine (Eds.), Proceedings of the first European conference on artificial life (pp. 134–142). Cambridge: MIT Press. Colorni, A., Dorigo, M., & Maniezzo, V. (1992b). An investigation of some properties of an ant algorithm. In R.
- Manner & B. Manderick (Eds.), Proceedings of PPSN-II, second international conference on parallel problem solving from nature 509–520). Dag, S. (2012). Optimizatıon of flowshop scheduling problems using heuristic techniques. Istanbul University, Ph.D.
- Thesis, Istanbul, Turkey: Department of Business Administration (in Turkish). Dannenbring, D.G. (1977). An Evaluation of Flowshop
Details
Primary Language
Turkish
Subjects
-
Journal Section
Research Article
Authors
Sündüs Dağ
İstanbul Üniveristesi
Publication Date
December 1, 2013
Submission Date
September 9, 2013
Acceptance Date
December 1, 2013
Published in Issue
Year 2013 Volume: 1 Number: 1