Research Article

A Solution Approach Proposal for Disassembly Line Balancing Based on ELECTRE

Volume: 7 Number: 2 December 31, 2019
EN TR

A Solution Approach Proposal for Disassembly Line Balancing Based on ELECTRE

Abstract

Disassembly is a crucial subject in view of the fact that it has a pivotal role in reverse supply chains. It will be possible to make effective disassembly operations with disassembly line balancing. In this study, ELECTRE is used for the first time in the literature to determine the assignment priorities of the tasks to work stations. Two algorithms are also proposed to improve the initial assignments. The first improvement algorithm aims to minimize the workstation number if it is possible. On the other hand, the aim of the second improvement is to make a better balance with interchanging the tasks between workstations. The result is compared with the results in the literature. A novel comparison criteria is also proposed called Deviation Mean (DM) in this study.

Keywords

References

  1. Agrawal, S., Tiwari, M.K., (2008). A colloborative ant colony algorithm to stochastic mixed model U-shaped disassembly line balancing and sequencing problem. Int. J. Prod. Res. 46 (6), 1405-1429.
  2. Avikal, S., Jain, R., & Mishra, P. K. (2014b). A Kano model, AHP and M-TOPSIS method-based technique for disassembly line balancing under fuzzy environment. Applied Soft Computing, 25, 519-529
  3. Avikal, S., Mishra, P. K., & Jain, R. (2014a). A Fuzzy AHP and PROMETHEE method-based heuristic for disassembly line balancing problems. International Journal of Production Research, 52(5), 1306-1317
  4. Bentaha, M.L., Battaia, O., Dolgui, A., (2014). A sample average approximation method for disassembly line balancing problem under uncertainty. Comput. Oper. Res. 51, 111-122.
  5. Bezdrob M., Bićo-Čar, M., & Pašić F. (2011). Managerial Decision Making Tools – ELECTRE Methods Brief Overview of Methods with Practical Examples. Sarajevo Business and Economics Review, 31.
  6. Büyüközkan G., Çifçi G. & Güleryüz S. (2011). Strategic Analysis of Healthcare Service Quality Using Fuzzy AHP Methodology. Expert Systems with Applications, 38, 9407–9424
  7. Deniz N., Ozcelik F. (2018) Determining Task Assignment Priorities For Disassembly Line Balancing Problem with ELECTRE. 16th International Supply Chain Management Congress, October 18-20, Denizli, Turkey.
  8. Deniz N., Ozcelik F. (2019). An Extended Review on Disassembly Line Balancing with Bibliometric & Social Network and Future Study Realization Analysis. Journal of Cleaner Production, 225, 697-715.

Details

Primary Language

Turkish

Subjects

Operation

Journal Section

Research Article

Publication Date

December 31, 2019

Submission Date

April 30, 2019

Acceptance Date

October 11, 2019

Published in Issue

Year 1970 Volume: 7 Number: 2

APA
Deniz, N., & Özçelik, F. (2019). Demontaj Hattı Dengeleme Problemi için ELECTRE’ye Dayalı Bir Çözüm Yaklaşımı Önerisi. Alphanumeric Journal, 7(2), 399-416. https://doi.org/10.17093/alphanumeric.559310

Cited By

Alphanumeric Journal is hosted on DergiPark, a web based online submission and peer review system powered by TUBİTAK ULAKBIM.

Alphanumeric Journal is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License