Scheduling Optimization in Automotive Supplier Industry under Sequence Dependent Constraints

Volume: 9 Number: 2 May 28, 2021
EN

Scheduling Optimization in Automotive Supplier Industry under Sequence Dependent Constraints

Abstract

In today's production conditions, it is very important for companies to produce products that meet the determined quality
standards. In addition to the production of semi-finished products produced in plastic injection lines with high quality and
efficiency, it is aimed to reduce the lost time and waste materials in production. Since automobile headlights can be in many
different colors, it is necessary to keep the product quality at a high level in the transition between colors in the production made
by plastic injection and to reduce the number of defective products caused by color errors. In this study, the problem of a single
row-dependent machine to reduce the amount of waste that occurs between color transitions in the plastic injection line of an
automotive side-industry company producing headlights is discussed. Tabu Search method, which is one of the heuristic
optimization algorithms was used to solve the problem. In the solution, production sequences that will reduce the amount of
waste of the products in the production program were created by using the annual data kept by the production department of the
factory. The algorithm was run using data from two machines out of 18, saving 134 kg of waste materials. It has been clarified
that if the developed algorithm is applied to all machines in the department, productivity and product quality will be increased
by saving waste materials.

Keywords

References

  1. T. Saraç and S. Kaya, “Plasti̇k enjeksi̇yon maki̇neleri̇ni̇n vardi̇ya bazinda çi̇zelgelenmesi̇ problemi̇ i̇çi̇n bi̇r hedef programlama modeli̇,” Journal of Industrial Engineering, vol. 24, pp. 12–26.
  2. T. Eren and E. Güner, “Sıra-Bağımlı Hazırlık Zamanlı İki Ölçütlü Çizelgeleme Problemi: Toplam Tamamlanma Zamanı Ve Maksimum Erken Bitirme,” Erciyes University Journal of Science and Technology, vol. 23, no. 1-2, pp. 95–105, 2007.
  3. T. Eren, “Learning and Deteriorating Effects on the Single Machine Scheduling Problems,” International Journal of Engineering Research and Development, vol. 6, no. 1, pp. 15–20, Jan. 2014.
  4. "Digital Conversion on the Way to Industry 4.0", Springer Science and Business Media LLC, 2021
  5. Boasberg, James, The Department of Education, Tatarstan Academy, Russian Academy, Sciences Sibirsky Trakt, Geo Quinot, Sandra Liebenberg, et al. 2019. Duke Law Journal 1 (1): 1–13. https://doi.org/10.1017/CBO9781107415324.004.
  6. Y. Zhao and G. Wang, “A dynamic differential evolution algorithm for the dynamic single-machine scheduling problem with sequence-dependent setup times Yue,” Journal of the Operational Research Society, vol. 71, no. 2, pp. 225–236, 2020.
  7. M. Settar and T. Eren, “The Single Machine Scheduling Problem with Sequence-Dependent Setup Times and a Learning Effect on Processing Times.,” Applied Soft Computing Journal , vol. 71, pp. 291–306, 2018.
  8. P. Perez-Gonzalez and J. M. Framinan, “Single machine scheduling with periodic machine availability,” Computers & Industrial Engineering, vol. 123, pp. 180–188, 2018.

Details

Primary Language

English

Subjects

Engineering

Journal Section

Research Article

Publication Date

May 28, 2021

Submission Date

April 21, 2021

Acceptance Date

May 24, 2021

Published in Issue

Year 2021 Volume: 9 Number: 2

APA
Mohamedsalih, M., & Şimşir, F. (2021). Scheduling Optimization in Automotive Supplier Industry under Sequence Dependent Constraints. Academic Platform - Journal of Engineering and Science, 9(2), 378-387. https://doi.org/10.21541/apjes.923838
AMA
1.Mohamedsalih M, Şimşir F. Scheduling Optimization in Automotive Supplier Industry under Sequence Dependent Constraints. APJES. 2021;9(2):378-387. doi:10.21541/apjes.923838
Chicago
Mohamedsalih, Muhammed, and Fuat Şimşir. 2021. “Scheduling Optimization in Automotive Supplier Industry under Sequence Dependent Constraints”. Academic Platform - Journal of Engineering and Science 9 (2): 378-87. https://doi.org/10.21541/apjes.923838.
EndNote
Mohamedsalih M, Şimşir F (May 1, 2021) Scheduling Optimization in Automotive Supplier Industry under Sequence Dependent Constraints. Academic Platform - Journal of Engineering and Science 9 2 378–387.
IEEE
[1]M. Mohamedsalih and F. Şimşir, “Scheduling Optimization in Automotive Supplier Industry under Sequence Dependent Constraints”, APJES, vol. 9, no. 2, pp. 378–387, May 2021, doi: 10.21541/apjes.923838.
ISNAD
Mohamedsalih, Muhammed - Şimşir, Fuat. “Scheduling Optimization in Automotive Supplier Industry under Sequence Dependent Constraints”. Academic Platform - Journal of Engineering and Science 9/2 (May 1, 2021): 378-387. https://doi.org/10.21541/apjes.923838.
JAMA
1.Mohamedsalih M, Şimşir F. Scheduling Optimization in Automotive Supplier Industry under Sequence Dependent Constraints. APJES. 2021;9:378–387.
MLA
Mohamedsalih, Muhammed, and Fuat Şimşir. “Scheduling Optimization in Automotive Supplier Industry under Sequence Dependent Constraints”. Academic Platform - Journal of Engineering and Science, vol. 9, no. 2, May 2021, pp. 378-87, doi:10.21541/apjes.923838.
Vancouver
1.Muhammed Mohamedsalih, Fuat Şimşir. Scheduling Optimization in Automotive Supplier Industry under Sequence Dependent Constraints. APJES. 2021 May 1;9(2):378-87. doi:10.21541/apjes.923838