For the purposes, actual production values and
simulation values were compared with using the datas of 200kWp Lebit Enerji
solar power plant, which was transferred and simulated to PVsyst V6.67-TRIAL
program. Systematic losses (temperature and wind loss, cable loss, shading
loss, loss of incompatibility, loss of dust and snow, loss of panel, loss of
inverter, etc.) were analyzed by the report obtained as a result of the
simulation. In the analysis shows that, there is a difference about % 0.56
between the simulation results and the actual production values. This will
provide big convenience for feasibility studies of PV systems that are in the
design step, on the other hand it can be guide to make revision more effective
PV systems.
Birincil Dil | Türkçe |
---|---|
Bölüm | Araştırma Makalesi |
Yazarlar | |
Yayımlanma Tarihi | 26 Eylül 2020 |
Gönderilme Tarihi | 25 Kasım 2019 |
Kabul Tarihi | 9 Nisan 2020 |
Yayımlandığı Sayı | Yıl 2020 Cilt: 9 Sayı: 3 |