Abstract

This study examined cost data for 130 wastewater treatment plant projects tendered by a public institution in Turkey between 2008 and 2022, and regression analysis was conducted to estimate the construction costs of these projects. Population projection, flow rate, aeration tank volume, sedimentation tank volume, and number of units are used as independent variables in the data set. The analysis determined that the independent variables had a significant impact on the total construction cost, and the developed model achieved an R² value of 0.763. The validity of the model was tested on three sample projects, and the accuracy rates between estimated and actual costs were determined to range from 92.56% to 97.58%. Therefore, the proposed model can be considered a suitable tool for preliminary feasibility assessments, early-stage planning, and approximate cost estimations. Nevertheless, it may not be sufficient as a standalone approach for detailed budgeting, tender preparation, or precise cost determination processes, where higher levels of accuracy are required, and should be supported by more comprehensive analytical methods.

Keywords

References

  1. Sueri̇, M., and Erdal, M., “Early estimation of sewerage line costs with regression analysis”, Gazi University Journal of Science, 35(3): 822–832, (2021). DOI: https://doi.org/10.35378/gujs.949726
  2. Türkiye İstatistik Kurumu, “Su ve atıksu istatistikleri”, (2023). https://data.tuik.gov.tr/Bulten/Index?p=Su-ve-Atiksu-Istatistikleri-2022-49607 Access Date: 27.09.2025
  3. Alshamrani, O. S., “Construction cost prediction model for conventional and sustainable college buildings in North America”, Journal of Taibah University for Science, 11(2): 315–323, (2016). DOI: https://doi.org/10.1016/j.jtusci.2016.01.004
  4. Narin, S., Doğan, O., Bande, N., and Genç, Y., “Comparison of multiple regression analysis and artificial neural networks methods in estimation of housing fair values in Kecioren/Ankara”, International Journal of Engineering Research and Development, 15(2): 828-839, (2023). DOI: https://doi.org/10.29137/umagd.1297672
  5. Özgan, E., “Bina maliyet girdileri için bir tahmin modeli ve bu girdilerin bina yapim maliyetine oranlarinin analizi”, Journal of Science and Technology of Dumlupınar University (8): 35-50, (2005). https://izlik.org/JA68ZJ46BU
  6. Han, A., “Factors affecting house sales in Türkiye: poisson regression analysis”, Gazi Journal of Economics&Business, 11(2): 122-135, (2025). DOI: https://doi.org/10.30855/gjeb.2025.11.2.002
  7. Özmaden, M. Ş., and Erdal, M., “Performance analysis of methods used in the cost estimation of residential buildings”, Konya Journal of Engineering Sciences, 8(4): 970–985, (2020). DOI: https://doi.org/10.36306/konjes.731119
  8. Yılmaz, M., Kanıt, R., Erdal, M., Yıldız, S., and Bakış, A., “Determination of the factors effecting the tender price by way of artificial neural networks and linear regression analyses in order to utilize maintenance and repair funds more effectively”, Journal of Polytechnic, 19(4): 461-470, (2016). https://izlik.org/JA78RT39ST

Details

Primary Language

English

Subjects

Civil Engineering (Other)

Journal Section

Research Article

Early Pub Date

May 26, 2026

Publication Date

-

Submission Date

December 12, 2025

Acceptance Date

April 28, 2026

Published in Issue

Year 2026 Number: Advanced Online Publication

APA
Özek, S. S., & Erdal, M. (2026). Preliminary Estimation of Wastewater Treatment Plant Construction Costs Using Regression Analysis. Gazi University Journal of Science, Advanced Online Publication. https://doi.org/10.35378/gujs.1840026
AMA
1.Özek SS, Erdal M. Preliminary Estimation of Wastewater Treatment Plant Construction Costs Using Regression Analysis. Gazi University Journal of Science. 2026;(Advanced Online Publication). doi:10.35378/gujs.1840026
Chicago
Özek, Samet Serkan, and Mürsel Erdal. 2026. “Preliminary Estimation of Wastewater Treatment Plant Construction Costs Using Regression Analysis”. Gazi University Journal of Science, no. Advanced Online Publication. https://doi.org/10.35378/gujs.1840026.
EndNote
Özek SS, Erdal M (May 1, 2026) Preliminary Estimation of Wastewater Treatment Plant Construction Costs Using Regression Analysis. Gazi University Journal of Science Advanced Online Publication
IEEE
[1]S. S. Özek and M. Erdal, “Preliminary Estimation of Wastewater Treatment Plant Construction Costs Using Regression Analysis”, Gazi University Journal of Science, no. Advanced Online Publication, May 2026, doi: 10.35378/gujs.1840026.
ISNAD
Özek, Samet Serkan - Erdal, Mürsel. “Preliminary Estimation of Wastewater Treatment Plant Construction Costs Using Regression Analysis”. Gazi University Journal of Science. Advanced Online Publication (May 1, 2026). https://doi.org/10.35378/gujs.1840026.
JAMA
1.Özek SS, Erdal M. Preliminary Estimation of Wastewater Treatment Plant Construction Costs Using Regression Analysis. Gazi University Journal of Science. 2026. doi:10.35378/gujs.1840026.
MLA
Özek, Samet Serkan, and Mürsel Erdal. “Preliminary Estimation of Wastewater Treatment Plant Construction Costs Using Regression Analysis”. Gazi University Journal of Science, no. Advanced Online Publication, May 2026, doi:10.35378/gujs.1840026.
Vancouver
1.Samet Serkan Özek, Mürsel Erdal. Preliminary Estimation of Wastewater Treatment Plant Construction Costs Using Regression Analysis. Gazi University Journal of Science. 2026 May 1;(Advanced Online Publication). doi:10.35378/gujs.1840026