Urban Road Network Maintenance Scheduling Using Ant Colony Optimization
Abstract
Keywords
References
- Fwa, T. F., Cheu, R. L., Muntasir, A., “Scheduling of pavement maintenance to minimize traffic delays”, Transportation Research Record, 1650: 28–44, (1998).
- Martinelli, D. R., Xu, D., “Delay Estimation and Optimal Length For Four-Lane Divided Freeway Workzones”, Journal of Transportation Engineering, 122(2): 114–122, (1996).
- Chang, Y., Sawaya, O. B., Chang, Y., “A Tabu Search Based Approach for Work Zone Scheduling”, Computer Science, August, (2000).
- Cheu, R. L., Wang, Y., Fwa, T. F., “Genetic Algorithm-Simulation Methodology for Pavement Maintenance Scheduling”, Computer-Aided Civil and Infrastructure Engineering, 19: 446–455, (2004).
- Lu, G., Xiong, Y., Ding, C., Wang, Y., “An optimal schedule for urban road network repair based on the greedy algorithm”, Plos One, 11(10): 1–15, (2016).
- Ma, J., Cheng, L., Li, D., “Road Maintenance Optimization Model Based on Dynamic Programming in Urban Traffic Network”, Journal of Advanced Transportation, (2018).
- Yang, D., Zhao, X., Chen, Y., Zhang, X., & Chen, C., “Study on the day-based work zone scheduling problem in urban road networks based on the day-to-day traffic assignment model”, Transportation Research Record, 2672(16): 14–22, (2018).
- Rey, D., Bar-gera, H., Dixit, V. V, Waller, S. T., “A Branch-and-Price Algorithm for the Bilevel Network Maintenance Scheduling Problem”, Transportation Science Publication, 53(5): 1213–1499, (2019).
Details
Primary Language
English
Subjects
Engineering
Journal Section
Research Article
Authors
Yalçın Alver
0000-0002-9833-4505
Türkiye
Publication Date
September 1, 2021
Submission Date
September 2, 2020
Acceptance Date
December 20, 2020
Published in Issue
Year 2021 Volume: 34 Number: 3
Cited By
Effect of Natural Bitumen on the Performance of Hot Asphalt Mixture
Gazi University Journal of Science
https://doi.org/10.35378/gujs.1282239