Application of Millisecond Delays for Improvement of Contour Blastings Results – Case Study Bellanica
Abstract
Keywords
References
- Dzodič R, (1985) Tehnologija bušenja i miniranja, Prishtinë. (Drilling and mining technology) Pristina
- Brahimaj I, (2008) Determining technical-economic parameters towards the advancement of massive detonations in exploring bauxites in Kosovo. M.Sc. thesis. Mitrovica.
- Brahimaj I, (2012) Contribution in the selection of optimal parameters of massive detonations in the limestone deposits of Gremnik. Ph.D. thesis. Mitrovica
- Brahimaj I., Brahimaj F, (2019). The massive and special blastings. Mitrovicë: University of Mitrovica "Isa Boletini".
- Brahimaj F, (2013) Appliance of contour blasting within road infrastructure Morine – Merdare. Msc. thesis. Mitrovica.
- Brahimaj F, (2014) Elaborate for blasting, Prishtina, Kosovo.
- Brahimaj F, (2020) Contribution for improvement of contour blastings in forming final slopes on the roadways and surface mines. Ph.D. thesis. Stip
- Brahimaj F., Dambov R., Brahimaj S, (2019). The contour blasting aplication in the Kosovo motorway project in Bellanica. XV International Conference of the Open and Underwater Mining of Minerals, (pp. 46-53). Varna.
Details
Primary Language
English
Subjects
Mining Engineering
Journal Section
Research Article
Authors
Risto Dambov
This is me
Macedonia
Frashër Brahimaj
*
Kosovo
Shkurte Brahimaj
This is me
Kosovo
Publication Date
March 31, 2021
Submission Date
February 24, 2021
Acceptance Date
March 30, 2021
Published in Issue
Year 2021 Volume: 16 Number: 1