One problem encountering at the job shop scheduling is minimum production size of machine is different from each another. This case increases lead time. A new approach was improved to reduce lead time. In this new approach, the parts, which materials are in stock and orders coming very frequently are assigned to machine to reduce lead time. Due the fact that there are a lot of machine and orders, it is possible to become so1ne probletns. In this paper, fuzzy logic is used to cope with this problem. New approach was simulated at the job sop that has owner 15 machinery and 50 orders. Simulation results showed that new approach reduced lead time between 27.89% and 32.36o/o
Atölye planlaması da karşılaşmadan bir sorun makinenin minimum üretim boyutu her birbirinden farklı olmasıdır.
Job shop scheduling fuzzy logic simulation of scheduling lead time
Birincil Dil | TR |
---|---|
Konular | Mühendislik |
Bölüm | Araştırma Makalesi |
Yazarlar | |
Yayımlanma Tarihi | 1 Haziran 2000 |
Gönderilme Tarihi | 6 Mayıs 2014 |
Yayımlandığı Sayı | Yıl 2000 Cilt: 4 Sayı: 1-2 |
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.