Research Article

Fuzzy Time Series Forecasting with Different Interval Selection and a Case Study for Adana Dam Occupancy Rate Forecasting

Volume: 10 Number: 1 June 30, 2026
EN

Fuzzy Time Series Forecasting with Different Interval Selection and a Case Study for Adana Dam Occupancy Rate Forecasting

Abstract

In the literature, various methods are suggested and various studies are conducted to improve existing methods to obtain the best forecasting. The purpose of this study is to show that although fuzzy time series has the disadvantage of interval selection, it can give as good results as other popular methods and emphasize that it is a more dynamic method. In this study, the monthly dam occupancy rates of the Adana/Turkey province were used as the dataset, and forecasts were made using autoregressive integrated moving average, decomposition, and fuzzy time series methods. The effect of different interval selections on the forecasting performance in fuzzy time series is also investigated. This study shows that choosing the correct interval significantly impacts the performance of fuzzy time series. This study shows that choosing the correct interval significantly impacts the performance of fuzzy time series. The prediction performance of the fuzzy time series model for extreme values was much better than other prediction methods used in the study. According to the results and evaluations, the fuzzy time series method produces dynamic and robust forecasts close to reality and gives good results with the right interval number and length selection.

Keywords

References

  1. Abu Salam, Z. K. A., & Keskin, M. E. (2018). Forecasting of water level in Dibis dam using artificial neural network. Journal of Engineering Sciences and Design, 6(4), 564-569. google scholar
  2. Adana, A.S. (2021). Dam occupancy rate. Retrieved in 2021 from https://www.adana-aski.gov.tr/web/barajdoluluk.aspx. google scholar
  3. Aladağ, C.H., Yolcu, U., & Eğrioğlu, E. (2010). A high-order fuzzy time-series forecasting model based on adaptive expectation and artificial neural networks Mathematics and Computers in Simulation, vol. 81, pp. 875–882. google scholar
  4. Ashraf, S., Sohail, M., Chohan, M. S., Paokanta, S., & Park, C. (2024). Higher-order circular intuitionistic fuzzy time series forecasting methodology: Application of stock change index. Demonstratio Mathematica, 57, 20230115. https://doi.org/10.1016/j.dmmat.2024.02.030115. google scholar
  5. Cai, Q., Zhang, D., Wu, B., & Leung, S. C. H. (2013). A novel stock forecasting model based on fuzzy time series and genetic algorithm. Proceedings of Computer Science, 18, 1155–1162. google scholar
  6. Cai, Q., Zhang, D., Zheng, W., & Leung, S. C. H. (2015). A new fuzzy time series forecasting model combined with ant colony optimization and auto-regression. Knowledge-Based Systems, 74, 61–68. https://doi.org/10.1016/j.kbs.2015.09.010. google scholar
  7. Chen, S. M. (1996). Forecasting enrollments based on fuzzy time series. Fuzzy Sets and Systems, 81, 311-319. google scholar
  8. Chen, S. M., & Hsu, C. C. (2004). A new method to forecast enrollments using fuzzy time series. International Journal of Applied Science and Engineering, 2(3), 234-244. google scholar

Details

Primary Language

English

Subjects

Statistical Data Science

Journal Section

Research Article

Publication Date

June 30, 2026

Submission Date

July 10, 2025

Acceptance Date

March 17, 2026

Published in Issue

Year 2026 Volume: 10 Number: 1

APA
Şan, Y., & Göçken, T. (2026). Fuzzy Time Series Forecasting with Different Interval Selection and a Case Study for Adana Dam Occupancy Rate Forecasting. Acta Infologica, 10(1), 169-183. https://doi.org/10.26650/acin.1736693
AMA
1.Şan Y, Göçken T. Fuzzy Time Series Forecasting with Different Interval Selection and a Case Study for Adana Dam Occupancy Rate Forecasting. ACIN. 2026;10(1):169-183. doi:10.26650/acin.1736693
Chicago
Şan, Yağmur, and Tolunay Göçken. 2026. “Fuzzy Time Series Forecasting With Different Interval Selection and a Case Study for Adana Dam Occupancy Rate Forecasting”. Acta Infologica 10 (1): 169-83. https://doi.org/10.26650/acin.1736693.
EndNote
Şan Y, Göçken T (June 1, 2026) Fuzzy Time Series Forecasting with Different Interval Selection and a Case Study for Adana Dam Occupancy Rate Forecasting. Acta Infologica 10 1 169–183.
IEEE
[1]Y. Şan and T. Göçken, “Fuzzy Time Series Forecasting with Different Interval Selection and a Case Study for Adana Dam Occupancy Rate Forecasting”, ACIN, vol. 10, no. 1, pp. 169–183, June 2026, doi: 10.26650/acin.1736693.
ISNAD
Şan, Yağmur - Göçken, Tolunay. “Fuzzy Time Series Forecasting With Different Interval Selection and a Case Study for Adana Dam Occupancy Rate Forecasting”. Acta Infologica 10/1 (June 1, 2026): 169-183. https://doi.org/10.26650/acin.1736693.
JAMA
1.Şan Y, Göçken T. Fuzzy Time Series Forecasting with Different Interval Selection and a Case Study for Adana Dam Occupancy Rate Forecasting. ACIN. 2026;10:169–183.
MLA
Şan, Yağmur, and Tolunay Göçken. “Fuzzy Time Series Forecasting With Different Interval Selection and a Case Study for Adana Dam Occupancy Rate Forecasting”. Acta Infologica, vol. 10, no. 1, June 2026, pp. 169-83, doi:10.26650/acin.1736693.
Vancouver
1.Yağmur Şan, Tolunay Göçken. Fuzzy Time Series Forecasting with Different Interval Selection and a Case Study for Adana Dam Occupancy Rate Forecasting. ACIN. 2026 Jun. 1;10(1):169-83. doi:10.26650/acin.1736693