Research Article

Hybrid Evolutionary Strategy and Simulated Annealing Algorithms for Integrated Process Planning, Scheduling and Due-Date Assignment Problem

Volume: 9 Number: 1 January 29, 2021
TR EN

Hybrid Evolutionary Strategy and Simulated Annealing Algorithms for Integrated Process Planning, Scheduling and Due-Date Assignment Problem

Abstract

Although integrated process planning and scheduling (IPPS) problem is studied extensively as scheduling with due-date assignment problem (SWDDA) in the literature, there are only a few studies on integration of these three manufacturing functions which are process planning, scheduling, and due-date assignment. Since outputs of upper stream functions effect downstream functions and higher integration gives a better global performance, it is better to integrate these three functions. In this study integration of process planning and earliest due-date scheduling (EDD) with due-date assignment is studied using hybrid evolutionary strategies (RS/ES) and hybrid simulated annealing algorithms (RS/SA). Ordinary solutions (OS), random search (RS) solutions, evolutionary strategies (ES) solutions, and simulated annealing (SA) solutions are compared with each other and hybrid solutions of ES and SA, with RS. According to the results, higher integration found better and best results are obtained with the highest integration level. ES and SA methods gave better results compared to the RS and OS, and RS/ES and RS/SA techniques were found promising search techniques.

Keywords

References

  1. W. Tan and B. Khoshnevis, “Integration of process planning and scheduling-a review,” Journal of Intelligent Manufacturing, vol. 11, no. 1, pp. 51–63, 2000, doi: 10.1023/A:1008952024606.
  2. X. Li, L. Gao, C. Zhang, and X. Shao, “A review on Integrated Process Planning and Scheduling,” International Journal of Manufacturing Research, vol. 5, no. 2, pp. 161-180, Jan. 2010.
  3. R. K. Phanden, A. Jain, and R. Verma, “Integration of process planning and scheduling: a state-of-the-art review,” International Journal of Computer Integrated Manufacturing, vol. 24, no. 6, pp. 517–534, 2011.
  4. N. Morad and A. M. S. Zalzala, “Genetic algorithms in integrated process planning and scheduling,” Journal of Intelligent Manufacturing, vol. 10, no. 2, pp. 169–179, 1999, doi: 10.1023/A:1008976720878.
  5. W. Tan and B. Khoshnevis, “A linearized polynomial mixed integer programming model for the integration of process planning and scheduling,” J. intell. manuf., vol. 15, no. 5, pp. 593–605, 2004, doi: 10.1023/B:JIMS.0000037710.80847.b6.
  6. Y. W. Guo, W. D. Li, A. R. Mileham, and G. W. Owen, “Optimisation of integrated process planning and scheduling using a particle swarm optimisation approach,” International Journal of Production Research, vol. 47, no. 14, pp. 3775–3796, 2009, doi: 10.1080/00207540701827905.
  7. A. Baykasoğlu and L. Özbakır, “A grammatical optimization approach for integrated process planning and scheduling,” Journal of Intelligent Manufacturing, vol. 20, no. 2, pp. 211–221, 2009, doi: 10.1007/s10845-008-0223-0.
  8. C. W. Leung, T. N. Wong, K.-L. L. Mak, and R. Y. K. Fung, “Integrated process planning and scheduling by an agent-based ant colony optimization,” Computers and Industrial Engineering, vol. 59, no. 1, pp. 166–180, 2010, doi: 10.1016/j.cie.2009.09.003.

Details

Primary Language

English

Subjects

Engineering

Journal Section

Research Article

Publication Date

January 29, 2021

Submission Date

July 4, 2020

Acceptance Date

November 21, 2020

Published in Issue

Year 2021 Volume: 9 Number: 1

APA
Demir, H. İ., Phanden, R., Kökçam, A., Erkayman, B., & Erden, C. (2021). Hybrid Evolutionary Strategy and Simulated Annealing Algorithms for Integrated Process Planning, Scheduling and Due-Date Assignment Problem. Academic Platform - Journal of Engineering and Science, 9(1), 86-91. https://doi.org/10.21541/apjes.764150
AMA
1.Demir Hİ, Phanden R, Kökçam A, Erkayman B, Erden C. Hybrid Evolutionary Strategy and Simulated Annealing Algorithms for Integrated Process Planning, Scheduling and Due-Date Assignment Problem. APJES. 2021;9(1):86-91. doi:10.21541/apjes.764150
Chicago
Demir, Halil İbrahim, Rakesh Phanden, Abdullah Kökçam, Burak Erkayman, and Caner Erden. 2021. “Hybrid Evolutionary Strategy and Simulated Annealing Algorithms for Integrated Process Planning, Scheduling and Due-Date Assignment Problem”. Academic Platform - Journal of Engineering and Science 9 (1): 86-91. https://doi.org/10.21541/apjes.764150.
EndNote
Demir Hİ, Phanden R, Kökçam A, Erkayman B, Erden C (January 1, 2021) Hybrid Evolutionary Strategy and Simulated Annealing Algorithms for Integrated Process Planning, Scheduling and Due-Date Assignment Problem. Academic Platform - Journal of Engineering and Science 9 1 86–91.
IEEE
[1]H. İ. Demir, R. Phanden, A. Kökçam, B. Erkayman, and C. Erden, “Hybrid Evolutionary Strategy and Simulated Annealing Algorithms for Integrated Process Planning, Scheduling and Due-Date Assignment Problem”, APJES, vol. 9, no. 1, pp. 86–91, Jan. 2021, doi: 10.21541/apjes.764150.
ISNAD
Demir, Halil İbrahim - Phanden, Rakesh - Kökçam, Abdullah - Erkayman, Burak - Erden, Caner. “Hybrid Evolutionary Strategy and Simulated Annealing Algorithms for Integrated Process Planning, Scheduling and Due-Date Assignment Problem”. Academic Platform - Journal of Engineering and Science 9/1 (January 1, 2021): 86-91. https://doi.org/10.21541/apjes.764150.
JAMA
1.Demir Hİ, Phanden R, Kökçam A, Erkayman B, Erden C. Hybrid Evolutionary Strategy and Simulated Annealing Algorithms for Integrated Process Planning, Scheduling and Due-Date Assignment Problem. APJES. 2021;9:86–91.
MLA
Demir, Halil İbrahim, et al. “Hybrid Evolutionary Strategy and Simulated Annealing Algorithms for Integrated Process Planning, Scheduling and Due-Date Assignment Problem”. Academic Platform - Journal of Engineering and Science, vol. 9, no. 1, Jan. 2021, pp. 86-91, doi:10.21541/apjes.764150.
Vancouver
1.Halil İbrahim Demir, Rakesh Phanden, Abdullah Kökçam, Burak Erkayman, Caner Erden. Hybrid Evolutionary Strategy and Simulated Annealing Algorithms for Integrated Process Planning, Scheduling and Due-Date Assignment Problem. APJES. 2021 Jan. 1;9(1):86-91. doi:10.21541/apjes.764150

Cited By