The article 358/1 of Law of Obligations regulates a kind of early default. When the work is not started in time or delayed contrary to contract or delayed as it can not be certainly completed in time, the other contractor can repeal the contract without waiting due time. Also in the contracts which is not fixed due date when the contractor does not start work in time or does not continue provided that the contractor is noticed and grace is granted, the optional rights rising from default can be enjoyed. In the contracts which is fixed due date, if the work delayed as it can not be completed certainly in time, unlike from the others, grace is not necessary
The obligation of starting the work in time and continue work contract contractor notice grace
Eser sözleşmelerinde yüklenicinin işe zamanında başlama ve işi sürdürme borcu yüklenicinin asli edim yükümlülükleri arasında yer alır. Yasa ile açıkça öngörülen bu borç aynı zamanda özen borcunun gereğidir. Borçlar Kanununun 358/1 hükmü kanımızca bir erken temerrüt halini düzenlemektedir. İşe zamanında başlanmaması veya işin sözleşmeye aykırı olarak ertelenmesi veya süresinde tamamlanamayacak derecede gecikmiş olması halinde iş sahibi vadeyi beklemeden sözleşmeden dönebilir. Teslim süresinin belirli olmadığı sözleşmelerde de kanımızca yüklenicinin işe zamanında başlamaması veya işi sürdürmemesi durumunda ihtar ve süre koşulları yerine getirilmek kaydıyla sözleşmeden dönülebilir veya temerrütten doğan diğer seçimlik haklar kullanılabilir. Teslim süresinin belirli olduğu sözleşmelerde işin zamanında tamamlanamayacak kadar gecikmesi durumunda ise diğerlerinden farklı olarak süre vermeye gerek yoktur
Other ID | JA67ME38ZV |
---|---|
Journal Section | Research Article |
Authors | |
Publication Date | September 1, 2008 |
Submission Date | September 1, 2008 |
Published in Issue | Year 2008 Volume: 57 Issue: 3 |