The use of solar energy among renewable energy sources has started to turn out widespread due to its potential, practicality of use and environmental friendliness. In assessing the installation sites of solar energy power plants (SEPPs) economic, social and environmental elements should be taken into consideration, and cultural and paleontological heritage areas should not be damaged. In order for decision-makers to show own predilections in some ways, the subject of this investigate is to specify the convenient fields for SEPP installation in Yalova province with all its districts by using different methods of Fuzzy Analytical Hierarchy Processes (BAHP) together with Geographic Information Systems (GIS). According to the results obtained, it has been seen that Yalova province has convenient filelds for SEPP sites in the center and east, including the Central and Çiftlikköy districts.

Project Number

yok

References

  • [1] E. Can, “Analysis of risks that are based on the aerial photography used in photogrammetric monitoring maps for environmental wind power energy plant projects,” Environmental Monitoring and Assessment, vol. 191, no. 746, 2019. https://doi.org/10.1007/s10661-019-7944-8
  • [2] H. Bulut, and O. Büyükalaca, “Simple model for the generation of daily global solar-radiation data in Turkey,” Applied Energy, vol. 84, no. 5, pp. 477-491, 2007. https://doi.org/10.1016/j.apenergy.2006.10.003
  • [3] MENRT, “Information center, energy, solar. Ministry of Energy and Natural Resources of Türkiye,” 2021a. https://enerji.gov.tr/bilgi-merkezi-enerji-gunes [Accessed: June, 02, 2021].
  • [4] REN21, “Renewables 2021global status report,” Paris: REN21 Secretariat, Renewable Energy Policy Network for the 21st century Paris, France, pp: 371, 2021. https://www.ren21.net/wp-content/uploads/2019/05/GSR2021_Full_Report.pdf [Accessed: June, 24, 2021].
  • [5] REN21, “Renewables 2020 global status report,” Paris: REN21 Secretariat, Renewable Enerji Policy Network for the 21st century Paris, France, pp:367, 2020. https://www.ren21.net/wp-content/uploads/2019/05/gsr_2020_full_report_en.pdf [Accessed: Sept. 24, 2020].
  • [6] TEIAŞ, “Turkish electricity transmission company 2020 annual report,” pp.101, https://www.teias.gov.tr/tr-TR/faaliyet-raporlari [Accessed: June, 24, 2021].
  • [7] P. K. Dash, I. Majumder, N. Nayak, and R. Bisoi, “Point and interval solar power forecasting using hybrid empirical wavelet transform and robust wavelet kernel ridge regression,” Natural Resources Research, vol. 29, no. 5, pp. 2813–2841, 2020. https://doi.org/10.1007/s11053-020-09630-6
  • [8] M. Uzar, and H. Koca, “Analysis of classical and fuzzy-logic based methods to generate suitability maps for solar power plants: The case of Menemen,” Journal of Geodesy and Geoinformation, vol. 7, no. 1, pp. 11-28, 2020. https://doi.org/10.9733/JGG.2020R0002.T
  • [9] M. Uzar, and E. F. Asılhan, “An alternative approach supported by decision support systems and geographical information system for producing internet_based map: competition method,” Journal of Geodesy and Geoinformation, vol. 6, no. 1, pp. 47-60, 2019. https://doi.org/10.9733/JGG.2019R00601004.T
  • [10] M. Uyan, “GIS-based solar farms site selection using analytic hierarchy process (AHP) in Karapinar region, Konya/Turkey,” Renewable and Sustainable Energy Reviews, vol. 28, pp. 11-17, 2013. https://doi.org/10.1016/j.rser.2013.07.042
  • [11] I. Potić, R. Golić, and T. Joksimović, “Analysis of insolation potential of Knjaževac Municipality (Serbia) using multi-criteria approach,” Renewable and Sustainable Energy Reviews, vol. 56, pp. 235-245, 2016. https://doi.org/10.1016/j.rser.2015.11.056
  • [12] E. Noorollahi, D. Fadai, M. Akbarpour Shirazi, and S. Ghodsipour, “Land suitability analysis for solar farms exploitation using GIS and fuzzy analytic hierarchy process (FAHP)—a case study of Iran,” Energies, vol. 9, no. 8, no. 643, 2016. https://doi.org/10.3390/en9080643
  • [13] H. Z. Al Garni, A. Awasthi, “Solar PV power plant site selection using a GIS-AHP based approach with application in Saudi Arabia,” Applied Energy, vol. 206, pp. 1225-1240, 2017. https://doi.org/10.1016/j.apenergy.2017.10.024
  • [14] A. Asakereh, M. Soleymani, and M. J. Sheikhdavoodi, “A GIS-based Fuzzy-AHP method for the evaluation of solar farms locations: Case study in Khuzestan province, Iran,” Solar Energy, vol. 155, pp. 342-353, 2017. https://doi.org/10.1016/j.solener.2017.05.075
  • [15] A. A. Merrouni, F. E. Elalaoui, A. Mezrhab, A. Mezrhab, and A. Ghennioui, “Large scale PV sites selection by combining GIS and Analytical Hierarchy Process. Case study: Eastern Morocco,” Renewable Energy, vol. 119, pp. 863-873, 2018. https://doi.org/10.1016/j.renene.2017.10.044
  • [16] E. Ekin, İ.G.Cesur, “Evaluation of Services Provided in the Consulting Sector with the Fuzzy AHP and TOPSIS Method Based on the Extended Analysis Method,” Journal of Academic Researches and Studies, vol. 15, no.28, pp. 12-34, 2023. https://doi.org/10.20990/kilisiibfakademik.1231038
  • [17] J. J. Buckley, “Fuzzy hierarchical analysis,” Fuzzy Sets and Systems, vol. 17, no. 3, pp. 233–247, 1985. https://doi.org/10.1016/0165-0114(85)90090-9
  • [18] D. Y. Chang, “Applications of the extent analysis method on Fuzzy AHP,” European Journal of Operational Research, vol. 95, no. 3, pp. 649-655, 1996. https://doi.org/10.1016/0377-2217(95)00300-2
  • [19] Ş. Kırcalı, and S. Selim, “Site suitability analysis for solar farms using the geographic information system and multi‑criteria decision analysis: the case of Antalya, Turkey,” Clean Technologies and Environmental Policy, vol. 23, pp. 1233–1250, 2021. https://doi.org/10.1007/s10098-020-02018-3
  • [20] MENRT, “Solar energy potential atlas (GEPA),” Ministry of Energy and Natural Resources of Türkiye, 2021b. https://gepa.enerji.gov.tr/MyCalculator/ [Accessed: June, 02, 2021].
  • [21] Provincial Directorate of EUCC, “Report of Yalova Province 2019 environmental status,” Yalova Governorship Provincial Directorate of Environment, Urbanization and Climate Change, EIA and Environmental Permits Branch Office, pp133, 2019.
  • [22] CoğrafyaHarita, “Türkiye province maps,” Geography map, 2021. http://cografyaharita.com/turkiye_mulki_idare_haritalari5.html [Accessed: Oct. 07, 2021].
  • [23] Turkish Statistical Institute, “Address based population registration system results,” Turkish Statistical Institute (TUIK), 2021. https://biruni.tuik.gov.tr/medas/?kn=95&locale=tr [Accessed: August, 01, 2021].
  • [24] Municipality of Yalova Province (2021). About Yalova. Viewed 30 July 2021, https://www.yalova.bel.tr/kent-rehberi/yalova-hakkinda
  • [25] MENRT, “Solar energy potential atlas (GEPA) Yalova. Ministry of Energy and Natural Resources of Türkiye,” 2021c. https://gepa.enerji.gov.tr/MyCalculator/pages/77.aspx [Accessed: June, 02, 2021].
  • [26] G. A. Kiliç, K. Al, E. Dağtekin, and Ü. Ünver, “Technical, economic and environmental ınvestigation of grid-ındependent hybrid energy systems applicability: a case study,” Energy Sources, Part A: Recovery, Utilization, and Environmental Effects, Ahead-of-print, pp. 1-16, 2020. https://doi.org/10.1080/15567036.2020.1825565
  • [27] S. E. Gül, and E. İzgi, “Analysis of an industrial plant with intelligent or convensional panels connected to wind and solar energy systems,” Conference on Power Systems, 15-16 November 2018, Ankara. pp. 59-63, 2018. https://doi.org/ 10.5281/zenodo.1482565
  • [28] A. Sözen, E. Arcaklioğlu, M. Özalp, and E. G. Kanit, “Solar-energy potential in Turkey,” Applied Energy, vol. 80, issue. 4, pp. 367-381, 2005. https://doi.org/10.1016/j.apenergy.2004.06.001
  • [29] S. Türkdoğan, S. Dilber, and B. Çam, “Economic and technical investigation of the feasibility of off-grid hybrid energy systems for a farmhouse,” Sinop Uni J Nat Sci, vol. 3, no. 2, pp. 52-65, 2018. https://doi.org/10.33484/sinopfbd.382391
  • [30] Energy Atlas, “Yalova electric plants,” 2021. https://www.enerjiatlasi.com/sehir/yalova/ [Accessed: July, 30, 2021].
  • [31] MEUCCT, “Türkiye environmental status report,” Ministry of Environment, Urbanization and Climate Change of Türkiye, General Directorate of EIA Permit Inspection, pp. 354, 2021. https://www.trakyaka.org.tr/upload/Node/33134/xfiles/Turkiye_Cevre_Durum_Raporu_2011_.pdf [Accessed: Sept. 13, 2021].
  • [32] İ. Şenlik, “Choosing the location of solar power plants,” Electrical Engineering Journal, vol. 462, pp. 94-98, 2017. (in Turkish).
  • [33] Y. Charabi, and A. Gastli,). “PV site suitability analysis using GIS-based spatial fuzzy multi-criteria evaluation,” Renew. Energy, vol. 36, no. 9, pp. 2554-2561, 2011. https://doi.org/10.1016/j.renene.2010.10.037
  • [34] N. Sarsıcı, “Determination of the areas where solar energy power plant (SPP) can be established in Karabük with multi-criteria decision making analysis,” MSc Thesis. Karabük University Graduate Education Institute Geography Department, 193 pp. Karabük, Türkiye, 2020.
  • [35] District Governorship of Altınova, “Hersek lagoon,” 2021. http://www.altinova.gov.tr/hersek-lagunu [Accessed: Oct. 19, 2021].
  • [36] Biyologlar, “Road map of migratory birds,” 2021. https://www.biyologlar.com/gocmen-kuslarin-yol-haritasi [Accessed: Oct. 19, 2021].
  • [37] K. Kaygusuz, and T. Ayhan, “Analysis of solar radiation data for Trabzon, Turkey,” Energy Convers Manage; vol. 40, no. 5, pp. 545–56, 1999.
  • [38] M. Uyan, “GIS-Supported mapping of solar power plant sites using AHP method,” Pamukkale University Journal of Engineering Sciences, vol. 23, no. 4, pp. 343-351, 2017. https://doi.org/10.5505/pajes.2016.59489
  • [39] M. A. Özdemir, and M. Bahadır, “Timely change (1992-2007) of land use in Yalova Province,” Journal of Geography, vol. 17, pp. 1-15, 2008.
  • [40] MTA, “Earth sciences map viewer and drawing editor,” General Directorate of Mineral Research and Exploration, MTA, 2021. http://yerbilimleri.mta.gov.tr/anasayfa.aspx [Accessed: Oct. 03, 2021].
  • [41] AFAD, “Earthquake data,” Disaster & Emergency Management Authority, Presidential of Earthquake Department, 2021. http://www.deprem.gov.tr/sarbis/Shared/Default.aspx [Accessed: Oct. 03, 2021].
  • [42] H. Eroğlu, “The suitability map determination for solar power plants: A case study,” Iğdır University Journal of the Institute of Science and Technology, vol. 8, no. 4, pp. 97-106, 2018. https://doi.org/10.21597/jist.430615
  • [43] T. Harcar, Silahlı Kuvvetlerde Karar Verme, First edition, pp: 9-12, Ankara, Türkiye, KHO publications, 1992.
  • [44] Ö. Aydın, “Hospital Location for Ankara with Fuzzy AHP,” Dokuz Eylül University Faculty of Economics and Administrative Sciences Journal, vol. 24, no. 2, pp. 87-104, 2009.
  • [45] G. J. Klir, and B. Yuan, Fuzzy Sets and Fuzzy Logic, USA, Prentice Hall PTR, 574pp, 1995.
  • [46] L. A. Zadeh, “Fuzzy sets,” Inf Control, vol. 8, no. 3, pp. 338–353, 1965.
  • [47] D. R. Anderson, D. J. Sweeney, and T. A. Williams, Quantitative Methods for Business 7e, Ohio: International Thomson Publishing, 1997.
  • [48] P. J. M. Laarhoven Van, and W. Pedrycz, “A fuzzy extension of Satty’s Priority Theory,” Fuzzy Sets and Systems, vol. 11, pp. 229–241, 1983. https://doi.org/10.1016/S0165-0114(83)80082-7
  • [49] M. Lee, H. Pham, and X. Zhang, “A methodology for priority setting with application to software development process,” European Journal of Operational Research, vol. 118, pp. 375-389, 1999.
  • [50] K.-J. Zhu, Y. Jing, and D.- Y. Chang, “A discussion on extent analysis method and applications of fuzzy AHP,” European Journal of Operational Research, vol. 116, pp. 450-456, 1999. https://doi.org/10.1016/S0377-2217(98)00331-2
  • [51] C. Kahraman, U. Cebeci, and Da. Ruan, “Multi-attribute Comparison of catering service companies using Fuzzy AHP: The case of Turkey,” International Journal of Production, vol. 87, no. 2, pp. 171-184, 2004. https://doi.org/10.1016/S0925-5273(03)00099-9
  • [52] R. Csutora, and J. J. Buckley, “Fuzzy Hierarchical Analysis: The Lambda-Max method,” Fuzzy Sets and Systems, vol. 120, no. 2, pp. 181-195, 2001. https://doi.org/10.1016/S0165-0114(99)00155-4
  • [53] C. K. Kwong, and H. Bai, “A Fuzzy AHP approach to the determination of importance weights of customer requirements in quality function deployment,” Journal of Intelligent Manufacturing, vol. 13, pp. 367-377, 2002.
  • [54] M. Enea, and T. Piazza, “Project selection by constrained Fuzzy AHP,” Fuzzy Optimization and Decision Making, vol. 3, pp. 39-62, 2004. https://doi.org/10.1023/B:FODM.0000013071.63614.3d
  • [55] L. Mikhailov, and P. Tsvetinov, “Evaluation of services using a Fuzzy Analytic Hierarchy Process,” Applied Soft Computing, vol. 5, pp. 23-33, 2004. https://doi.org/10.1016/j.asoc.2004.04.001
  • [56] H. Çanlı, and A. Kandakoğlu, “A Fuzzy AHP model for air force comparison,” JAST, vol. 3, no. 1, pp. 71-82, 2007.
  • [57] A. Awasthi, K. Govindan, and S. Gold, “Multi-Tier sustainable global supplier selection using a Fuzzy AHP-VIKOR Based Approach,” International Journal of Production Economics, vol. 195, pp. 106-117, 2018.
  • [58] F. T. S. Chan, and N. Kumar, “Global supplier development considering risk factors using fuzzy extended AHP based approach,” Omega, vol. 35, no. 4, pp. 417-431, 2007.
  • [59] J. J. Wang, Y. Y. Jing, C. F. Zhang, and J. H. Zhao, “Review on MultiCriteria Decision Analysis aid in sustainable energy decision-making,” Renewable and Sustainable Energy Reviews, vol. 13, no. 9, pp. 2263-2278, 2009. https://doi.org/10.1016/j.rser.2009.06.021
  • [60] D. Güler, and T. Yomralıoğlu, GIS and Fuzzy AHP based area selection for electric vehicle charging stations, The International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences, Volume XLII-4, 249–252. ISPRS TC IV Mid-term Symposium on 3D Spatial Information Science –The Engine of Change, Delft, 1–5 October 2018, Delft, The Netherlands, 2018. https://doi.org/10.5194/isprs-archives-XLII-4-249-2018
  • [61] A. I. Karabulut, B. Yazici-Karabulut, P. Derin, M. I. Yesilnacar, and M. A. Cullu, “Landfill siting for municipal solid waste using remote sensing and geographic information system integrated analytic hierarchy process and simple additive weighting methods from the point of view of a fast-growing metropolitan area in GAP area of Turkey,” Env. Sci. Pol. Res., vol. 29, pp. 4044–4061, 2022. https://doi.org/10.1007/s11356-021-15951-7
  • [62] F. Ecer, “An integrated Fuzzy AHP and ARAS Model to evaluate mobile banking services,” Technological and Economic Development of Economy, vol. 24, no. 2, pp. 670-695, 2018. https://doi.org/10.3846/20294913.2016.1255275
  • [63] V. Adjiski, G. Kaplan, and S. Mijalkovski, “Assessment of the solar energy potential of rooftops using LiDAR datasets and GIS based approach,” International Journal of Engineering and Geosciences, vol. 8, no. 2, pp. 188-199, 2023. https://doi.org/10.26833/ijeg.1112274
  • [64] D. Arca and H. Keskin Citiroglu, “GIS-Based analysis of sites determination for solar power plant (SPP) by multi-criteria decision analysis method: A case study in Karabük,” Journal of Geomatics, vol. 7, no. 1, pp.17-25, 2022. https://doi.org/10.29128/geomatik.803200
  • [65] H. Ebru Colak, Tugba Memisoglu and Yasin Gercek, “Optimal site selection for solar photovoltaic (PV) power plants using GIS and AHP: A case study of Malatya Province, Turkey,” Renewable Energy, vol. 149, no. 2020, pp. 565-576, 2020. https://doi.org/10.1016/j.renene.2019.12.078
  • [66] M. Demir, “Determination of Areas with Solar Power Plant Installation Potential in Kars Province by Using GIS Analysis and AHP Method,” Journal of Geography, vol.46, no.2023, pp. 93-109, 2023.
Year 2023, , 732 - 745, 28.09.2023
https://doi.org/10.17798/bitlisfen.1290095

Abstract

Supporting Institution

yok

Project Number

yok

References

  • [1] E. Can, “Analysis of risks that are based on the aerial photography used in photogrammetric monitoring maps for environmental wind power energy plant projects,” Environmental Monitoring and Assessment, vol. 191, no. 746, 2019. https://doi.org/10.1007/s10661-019-7944-8
  • [2] H. Bulut, and O. Büyükalaca, “Simple model for the generation of daily global solar-radiation data in Turkey,” Applied Energy, vol. 84, no. 5, pp. 477-491, 2007. https://doi.org/10.1016/j.apenergy.2006.10.003
  • [3] MENRT, “Information center, energy, solar. Ministry of Energy and Natural Resources of Türkiye,” 2021a. https://enerji.gov.tr/bilgi-merkezi-enerji-gunes [Accessed: June, 02, 2021].
  • [4] REN21, “Renewables 2021global status report,” Paris: REN21 Secretariat, Renewable Energy Policy Network for the 21st century Paris, France, pp: 371, 2021. https://www.ren21.net/wp-content/uploads/2019/05/GSR2021_Full_Report.pdf [Accessed: June, 24, 2021].
  • [5] REN21, “Renewables 2020 global status report,” Paris: REN21 Secretariat, Renewable Enerji Policy Network for the 21st century Paris, France, pp:367, 2020. https://www.ren21.net/wp-content/uploads/2019/05/gsr_2020_full_report_en.pdf [Accessed: Sept. 24, 2020].
  • [6] TEIAŞ, “Turkish electricity transmission company 2020 annual report,” pp.101, https://www.teias.gov.tr/tr-TR/faaliyet-raporlari [Accessed: June, 24, 2021].
  • [7] P. K. Dash, I. Majumder, N. Nayak, and R. Bisoi, “Point and interval solar power forecasting using hybrid empirical wavelet transform and robust wavelet kernel ridge regression,” Natural Resources Research, vol. 29, no. 5, pp. 2813–2841, 2020. https://doi.org/10.1007/s11053-020-09630-6
  • [8] M. Uzar, and H. Koca, “Analysis of classical and fuzzy-logic based methods to generate suitability maps for solar power plants: The case of Menemen,” Journal of Geodesy and Geoinformation, vol. 7, no. 1, pp. 11-28, 2020. https://doi.org/10.9733/JGG.2020R0002.T
  • [9] M. Uzar, and E. F. Asılhan, “An alternative approach supported by decision support systems and geographical information system for producing internet_based map: competition method,” Journal of Geodesy and Geoinformation, vol. 6, no. 1, pp. 47-60, 2019. https://doi.org/10.9733/JGG.2019R00601004.T
  • [10] M. Uyan, “GIS-based solar farms site selection using analytic hierarchy process (AHP) in Karapinar region, Konya/Turkey,” Renewable and Sustainable Energy Reviews, vol. 28, pp. 11-17, 2013. https://doi.org/10.1016/j.rser.2013.07.042
  • [11] I. Potić, R. Golić, and T. Joksimović, “Analysis of insolation potential of Knjaževac Municipality (Serbia) using multi-criteria approach,” Renewable and Sustainable Energy Reviews, vol. 56, pp. 235-245, 2016. https://doi.org/10.1016/j.rser.2015.11.056
  • [12] E. Noorollahi, D. Fadai, M. Akbarpour Shirazi, and S. Ghodsipour, “Land suitability analysis for solar farms exploitation using GIS and fuzzy analytic hierarchy process (FAHP)—a case study of Iran,” Energies, vol. 9, no. 8, no. 643, 2016. https://doi.org/10.3390/en9080643
  • [13] H. Z. Al Garni, A. Awasthi, “Solar PV power plant site selection using a GIS-AHP based approach with application in Saudi Arabia,” Applied Energy, vol. 206, pp. 1225-1240, 2017. https://doi.org/10.1016/j.apenergy.2017.10.024
  • [14] A. Asakereh, M. Soleymani, and M. J. Sheikhdavoodi, “A GIS-based Fuzzy-AHP method for the evaluation of solar farms locations: Case study in Khuzestan province, Iran,” Solar Energy, vol. 155, pp. 342-353, 2017. https://doi.org/10.1016/j.solener.2017.05.075
  • [15] A. A. Merrouni, F. E. Elalaoui, A. Mezrhab, A. Mezrhab, and A. Ghennioui, “Large scale PV sites selection by combining GIS and Analytical Hierarchy Process. Case study: Eastern Morocco,” Renewable Energy, vol. 119, pp. 863-873, 2018. https://doi.org/10.1016/j.renene.2017.10.044
  • [16] E. Ekin, İ.G.Cesur, “Evaluation of Services Provided in the Consulting Sector with the Fuzzy AHP and TOPSIS Method Based on the Extended Analysis Method,” Journal of Academic Researches and Studies, vol. 15, no.28, pp. 12-34, 2023. https://doi.org/10.20990/kilisiibfakademik.1231038
  • [17] J. J. Buckley, “Fuzzy hierarchical analysis,” Fuzzy Sets and Systems, vol. 17, no. 3, pp. 233–247, 1985. https://doi.org/10.1016/0165-0114(85)90090-9
  • [18] D. Y. Chang, “Applications of the extent analysis method on Fuzzy AHP,” European Journal of Operational Research, vol. 95, no. 3, pp. 649-655, 1996. https://doi.org/10.1016/0377-2217(95)00300-2
  • [19] Ş. Kırcalı, and S. Selim, “Site suitability analysis for solar farms using the geographic information system and multi‑criteria decision analysis: the case of Antalya, Turkey,” Clean Technologies and Environmental Policy, vol. 23, pp. 1233–1250, 2021. https://doi.org/10.1007/s10098-020-02018-3
  • [20] MENRT, “Solar energy potential atlas (GEPA),” Ministry of Energy and Natural Resources of Türkiye, 2021b. https://gepa.enerji.gov.tr/MyCalculator/ [Accessed: June, 02, 2021].
  • [21] Provincial Directorate of EUCC, “Report of Yalova Province 2019 environmental status,” Yalova Governorship Provincial Directorate of Environment, Urbanization and Climate Change, EIA and Environmental Permits Branch Office, pp133, 2019.
  • [22] CoğrafyaHarita, “Türkiye province maps,” Geography map, 2021. http://cografyaharita.com/turkiye_mulki_idare_haritalari5.html [Accessed: Oct. 07, 2021].
  • [23] Turkish Statistical Institute, “Address based population registration system results,” Turkish Statistical Institute (TUIK), 2021. https://biruni.tuik.gov.tr/medas/?kn=95&locale=tr [Accessed: August, 01, 2021].
  • [24] Municipality of Yalova Province (2021). About Yalova. Viewed 30 July 2021, https://www.yalova.bel.tr/kent-rehberi/yalova-hakkinda
  • [25] MENRT, “Solar energy potential atlas (GEPA) Yalova. Ministry of Energy and Natural Resources of Türkiye,” 2021c. https://gepa.enerji.gov.tr/MyCalculator/pages/77.aspx [Accessed: June, 02, 2021].
  • [26] G. A. Kiliç, K. Al, E. Dağtekin, and Ü. Ünver, “Technical, economic and environmental ınvestigation of grid-ındependent hybrid energy systems applicability: a case study,” Energy Sources, Part A: Recovery, Utilization, and Environmental Effects, Ahead-of-print, pp. 1-16, 2020. https://doi.org/10.1080/15567036.2020.1825565
  • [27] S. E. Gül, and E. İzgi, “Analysis of an industrial plant with intelligent or convensional panels connected to wind and solar energy systems,” Conference on Power Systems, 15-16 November 2018, Ankara. pp. 59-63, 2018. https://doi.org/ 10.5281/zenodo.1482565
  • [28] A. Sözen, E. Arcaklioğlu, M. Özalp, and E. G. Kanit, “Solar-energy potential in Turkey,” Applied Energy, vol. 80, issue. 4, pp. 367-381, 2005. https://doi.org/10.1016/j.apenergy.2004.06.001
  • [29] S. Türkdoğan, S. Dilber, and B. Çam, “Economic and technical investigation of the feasibility of off-grid hybrid energy systems for a farmhouse,” Sinop Uni J Nat Sci, vol. 3, no. 2, pp. 52-65, 2018. https://doi.org/10.33484/sinopfbd.382391
  • [30] Energy Atlas, “Yalova electric plants,” 2021. https://www.enerjiatlasi.com/sehir/yalova/ [Accessed: July, 30, 2021].
  • [31] MEUCCT, “Türkiye environmental status report,” Ministry of Environment, Urbanization and Climate Change of Türkiye, General Directorate of EIA Permit Inspection, pp. 354, 2021. https://www.trakyaka.org.tr/upload/Node/33134/xfiles/Turkiye_Cevre_Durum_Raporu_2011_.pdf [Accessed: Sept. 13, 2021].
  • [32] İ. Şenlik, “Choosing the location of solar power plants,” Electrical Engineering Journal, vol. 462, pp. 94-98, 2017. (in Turkish).
  • [33] Y. Charabi, and A. Gastli,). “PV site suitability analysis using GIS-based spatial fuzzy multi-criteria evaluation,” Renew. Energy, vol. 36, no. 9, pp. 2554-2561, 2011. https://doi.org/10.1016/j.renene.2010.10.037
  • [34] N. Sarsıcı, “Determination of the areas where solar energy power plant (SPP) can be established in Karabük with multi-criteria decision making analysis,” MSc Thesis. Karabük University Graduate Education Institute Geography Department, 193 pp. Karabük, Türkiye, 2020.
  • [35] District Governorship of Altınova, “Hersek lagoon,” 2021. http://www.altinova.gov.tr/hersek-lagunu [Accessed: Oct. 19, 2021].
  • [36] Biyologlar, “Road map of migratory birds,” 2021. https://www.biyologlar.com/gocmen-kuslarin-yol-haritasi [Accessed: Oct. 19, 2021].
  • [37] K. Kaygusuz, and T. Ayhan, “Analysis of solar radiation data for Trabzon, Turkey,” Energy Convers Manage; vol. 40, no. 5, pp. 545–56, 1999.
  • [38] M. Uyan, “GIS-Supported mapping of solar power plant sites using AHP method,” Pamukkale University Journal of Engineering Sciences, vol. 23, no. 4, pp. 343-351, 2017. https://doi.org/10.5505/pajes.2016.59489
  • [39] M. A. Özdemir, and M. Bahadır, “Timely change (1992-2007) of land use in Yalova Province,” Journal of Geography, vol. 17, pp. 1-15, 2008.
  • [40] MTA, “Earth sciences map viewer and drawing editor,” General Directorate of Mineral Research and Exploration, MTA, 2021. http://yerbilimleri.mta.gov.tr/anasayfa.aspx [Accessed: Oct. 03, 2021].
  • [41] AFAD, “Earthquake data,” Disaster & Emergency Management Authority, Presidential of Earthquake Department, 2021. http://www.deprem.gov.tr/sarbis/Shared/Default.aspx [Accessed: Oct. 03, 2021].
  • [42] H. Eroğlu, “The suitability map determination for solar power plants: A case study,” Iğdır University Journal of the Institute of Science and Technology, vol. 8, no. 4, pp. 97-106, 2018. https://doi.org/10.21597/jist.430615
  • [43] T. Harcar, Silahlı Kuvvetlerde Karar Verme, First edition, pp: 9-12, Ankara, Türkiye, KHO publications, 1992.
  • [44] Ö. Aydın, “Hospital Location for Ankara with Fuzzy AHP,” Dokuz Eylül University Faculty of Economics and Administrative Sciences Journal, vol. 24, no. 2, pp. 87-104, 2009.
  • [45] G. J. Klir, and B. Yuan, Fuzzy Sets and Fuzzy Logic, USA, Prentice Hall PTR, 574pp, 1995.
  • [46] L. A. Zadeh, “Fuzzy sets,” Inf Control, vol. 8, no. 3, pp. 338–353, 1965.
  • [47] D. R. Anderson, D. J. Sweeney, and T. A. Williams, Quantitative Methods for Business 7e, Ohio: International Thomson Publishing, 1997.
  • [48] P. J. M. Laarhoven Van, and W. Pedrycz, “A fuzzy extension of Satty’s Priority Theory,” Fuzzy Sets and Systems, vol. 11, pp. 229–241, 1983. https://doi.org/10.1016/S0165-0114(83)80082-7
  • [49] M. Lee, H. Pham, and X. Zhang, “A methodology for priority setting with application to software development process,” European Journal of Operational Research, vol. 118, pp. 375-389, 1999.
  • [50] K.-J. Zhu, Y. Jing, and D.- Y. Chang, “A discussion on extent analysis method and applications of fuzzy AHP,” European Journal of Operational Research, vol. 116, pp. 450-456, 1999. https://doi.org/10.1016/S0377-2217(98)00331-2
  • [51] C. Kahraman, U. Cebeci, and Da. Ruan, “Multi-attribute Comparison of catering service companies using Fuzzy AHP: The case of Turkey,” International Journal of Production, vol. 87, no. 2, pp. 171-184, 2004. https://doi.org/10.1016/S0925-5273(03)00099-9
  • [52] R. Csutora, and J. J. Buckley, “Fuzzy Hierarchical Analysis: The Lambda-Max method,” Fuzzy Sets and Systems, vol. 120, no. 2, pp. 181-195, 2001. https://doi.org/10.1016/S0165-0114(99)00155-4
  • [53] C. K. Kwong, and H. Bai, “A Fuzzy AHP approach to the determination of importance weights of customer requirements in quality function deployment,” Journal of Intelligent Manufacturing, vol. 13, pp. 367-377, 2002.
  • [54] M. Enea, and T. Piazza, “Project selection by constrained Fuzzy AHP,” Fuzzy Optimization and Decision Making, vol. 3, pp. 39-62, 2004. https://doi.org/10.1023/B:FODM.0000013071.63614.3d
  • [55] L. Mikhailov, and P. Tsvetinov, “Evaluation of services using a Fuzzy Analytic Hierarchy Process,” Applied Soft Computing, vol. 5, pp. 23-33, 2004. https://doi.org/10.1016/j.asoc.2004.04.001
  • [56] H. Çanlı, and A. Kandakoğlu, “A Fuzzy AHP model for air force comparison,” JAST, vol. 3, no. 1, pp. 71-82, 2007.
  • [57] A. Awasthi, K. Govindan, and S. Gold, “Multi-Tier sustainable global supplier selection using a Fuzzy AHP-VIKOR Based Approach,” International Journal of Production Economics, vol. 195, pp. 106-117, 2018.
  • [58] F. T. S. Chan, and N. Kumar, “Global supplier development considering risk factors using fuzzy extended AHP based approach,” Omega, vol. 35, no. 4, pp. 417-431, 2007.
  • [59] J. J. Wang, Y. Y. Jing, C. F. Zhang, and J. H. Zhao, “Review on MultiCriteria Decision Analysis aid in sustainable energy decision-making,” Renewable and Sustainable Energy Reviews, vol. 13, no. 9, pp. 2263-2278, 2009. https://doi.org/10.1016/j.rser.2009.06.021
  • [60] D. Güler, and T. Yomralıoğlu, GIS and Fuzzy AHP based area selection for electric vehicle charging stations, The International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences, Volume XLII-4, 249–252. ISPRS TC IV Mid-term Symposium on 3D Spatial Information Science –The Engine of Change, Delft, 1–5 October 2018, Delft, The Netherlands, 2018. https://doi.org/10.5194/isprs-archives-XLII-4-249-2018
  • [61] A. I. Karabulut, B. Yazici-Karabulut, P. Derin, M. I. Yesilnacar, and M. A. Cullu, “Landfill siting for municipal solid waste using remote sensing and geographic information system integrated analytic hierarchy process and simple additive weighting methods from the point of view of a fast-growing metropolitan area in GAP area of Turkey,” Env. Sci. Pol. Res., vol. 29, pp. 4044–4061, 2022. https://doi.org/10.1007/s11356-021-15951-7
  • [62] F. Ecer, “An integrated Fuzzy AHP and ARAS Model to evaluate mobile banking services,” Technological and Economic Development of Economy, vol. 24, no. 2, pp. 670-695, 2018. https://doi.org/10.3846/20294913.2016.1255275
  • [63] V. Adjiski, G. Kaplan, and S. Mijalkovski, “Assessment of the solar energy potential of rooftops using LiDAR datasets and GIS based approach,” International Journal of Engineering and Geosciences, vol. 8, no. 2, pp. 188-199, 2023. https://doi.org/10.26833/ijeg.1112274
  • [64] D. Arca and H. Keskin Citiroglu, “GIS-Based analysis of sites determination for solar power plant (SPP) by multi-criteria decision analysis method: A case study in Karabük,” Journal of Geomatics, vol. 7, no. 1, pp.17-25, 2022. https://doi.org/10.29128/geomatik.803200
  • [65] H. Ebru Colak, Tugba Memisoglu and Yasin Gercek, “Optimal site selection for solar photovoltaic (PV) power plants using GIS and AHP: A case study of Malatya Province, Turkey,” Renewable Energy, vol. 149, no. 2020, pp. 565-576, 2020. https://doi.org/10.1016/j.renene.2019.12.078
  • [66] M. Demir, “Determination of Areas with Solar Power Plant Installation Potential in Kars Province by Using GIS Analysis and AHP Method,” Journal of Geography, vol.46, no.2023, pp. 93-109, 2023.
There are 66 citations in total.

Details

Primary Language English
Subjects Engineering
Journal Section Araştırma Makalesi
Authors

Deniz Arca 0000-0002-0439-4938

Hülya Keskin Çıtıroğlu 0000-0002-2999-9570

Project Number yok
Early Pub Date September 23, 2023
Publication Date September 28, 2023
Submission Date April 30, 2023
Acceptance Date September 10, 2023
Published in Issue Year 2023

Cite

IEEE D. Arca and H. Keskin Çıtıroğlu, “Geo-Environmental Analysis on Specifying Solar Energy Power Plant (SEPP) Fields by GIS and Different Fuzzy AHP Methods”, Bitlis Eren Üniversitesi Fen Bilimleri Dergisi, vol. 12, no. 3, pp. 732–745, 2023, doi: 10.17798/bitlisfen.1290095.



Bitlis Eren Üniversitesi
Fen Bilimleri Dergisi Editörlüğü

Bitlis Eren Üniversitesi Lisansüstü Eğitim Enstitüsü        
Beş Minare Mah. Ahmet Eren Bulvarı, Merkez Kampüs, 13000 BİTLİS        
E-posta: fbe@beu.edu.tr