In this study, taking the different parameters into
account, different designs of b-type ORC
power plant have analytically conducted. In the designs, Simav geothermal
resources have been taken into consideration as the source of the plant. Then,
the best design has been determined using EATWOS in the viewpoint of the
working conditions. As a conclusion, the available models of b1-type, b2-type and b3-type were
determined as Model 12, Model 10 and Model 31, respectively for energy
efficiency, net yearly electricity generation and integrated-based values. Amongst these,
the best model was determined as Model 10 with the design parameters
of 353.15 K, 413.15 K, 295.15 K, 656.37 MWh and 18.08 for T1b, T2d, T2c, Enet and η, respectively.