Bu çalışmada seçilmiş bir konfeksiyon işletmesinde farklı desenli iki çift pantolonun dikim prosesi incelenmiştir. Giysilerin dikim hattı için zaman ölçümü ve proses analizi yapılmıştır. Pitch time hesaplanmış, Pitch şeması oluşturulmuş, proses analizinde dar boğazlar tespit edilmiş ve ilgili çözüm önerileri sunulmuştur
In this study, sewing process of two pair of trousers with different pattern was researched in a selected garment factory. Time measurement and process analysis of the garments were carried out for their sewing line. Pitch time was calculated, pitch schema was formed and bottlenecks at the process analysis were determined and related solutions were offered
Other ID | JA34DM28PF |
---|---|
Journal Section | Articles |
Authors | |
Publication Date | July 25, 2016 |
Published in Issue | Year 2015 Volume: 30 Issue: 1 |