DETERMINATION OF ROOM AND PILLAR METHOD PARAMETERS IN UNDERGROUND MARBLE QUARRY

Year 2014, Volume: 16 Issue: 47, 41 - 50, 01.05.2014

Abstract

The increasing need for natural stone in our country and across the world gradually forces the natural stone
quarries to be operated at deeper elevations in our day. Additionally, in steep terrains where the infrastructure
activities of marble quarry are hard to be supplied, underground marble quarrying becomes inevitable in places
with large amount of overburden and harsh weather conditions and also in deeper elevations where the block
efficiency increases. Among the underground methods; the productions that will made through applying roompillar
method are crucial from the aspects of reviving the inactive marble quarries, taking into production the
marble quarries that are not possible to be exploited economically by open pit methods and evaluating the
present reserves more efficiently and shortly. Therefore, in this study, the marble quarries that could employ
room-and-pillar minig method were selected from five different regions nationwide and natural stone production
parameters were attempted to be evaluated in terms of economic and technical applicability.

References

  • Akkoç T. (2003). “Derin Mermer Yataklarının Yeraltı Üretim Yöntemleriyle İşletilebilirliğinin Araştırılması”, Dokuz Eylül Üniversitesi, Fen Bilimleri Enstitüsü, Y. Lisans Tezi, s.113
  • Amadei, B., Stephansson, O. (1997): “Rock Stress and Its Measurement” London: Chapman and Hall, s.490.
  • Barron, K., (1984): “An Analytical Approach to The Design of Coal Pillars”, CIM Bulletin, cilt. 77, no.868, s.118-124.
  • Bieniawski, Z. T. (1984): “Rock Mechanics Design in Mining and Tunnelling, A. A.Balkema, Rotterdam, s.272
  • Hardy, P., Agapito, J. F. T., (1982): “Induced Horizontal Stress Method of Pillar Design in Oil Shale., XV Oil Shale Symp. Colorado School of Mines, Golden, Colorado, no.1. Hedley D.G.F ve Grant F. (1972): “Stope and Pillar Design for the Elliot Lake Uranium Mines”, CIM Trans., s.121- 128.
  • Hoek, E., Brown, E.T. (1980): “Underground Excavations in Rock” London: England.
  • Kimmelmann, M. R., Hyde, B., Madgwick, R. J., (1984): “The Use of Computer Applications at BCL Limited In Planning Pillar Extraction and Design of Mining Layouts.” Proc of the ISMR Symp. Design and Performance of Underground Excavations. Brit. Geotech. Soc., London.s.53-63
  • King, H. J. and Whittaker, B.N. (1971): “A Review of Current Knowledge on Roadway Behaviour, Especially the Problems on Which Further Information is Required”, Proc. of the Symposium on Strata Control in Roadways, University of Nottingham, s.73-89.
  • Kulaksız, S., (2012): “Anadolu Antik (Mermer) Doğaltaş ve Ocakları ve Harran Bazda Yer altı Ocak İşletmesi”, 8’inci Uluslararası Mermer ve Doğal Taş Kongresi,Afyon, cilt.1, s.1-7
  • Kun, M., Onargan, T., (2013): “Influence of The Fault Zone In Shallow Tunneling: A Case Study of Izmir Metro Tunnel”, Tunnelling and Underground Space Technology, cilt.33, s.34- 45.
  • Sjöberg, J., (1992): “Failure Modes and Pillar Behaviour in the Zinkgruvan Mine.” In: Proc., 33. U.S. Rock Mech. Symp., Santa Fe. A. A. Balkema Publ., Rotterdam.
  • Stacey, T.R. ve Page, C. H. (1986): “Practical Handbook for Underground Rock Mechanics” , Trans Tech Publications.
  • Potvin, Y., Hudyma, M. R., Miller, H. D. S.,(1989): “Design Guidelines For Open Stope Support”. Bull. Can. Min. Metall., vol.82, s. 53-62
  • Whittaker, B. N. (1984): “Chain Pillar Design Considerations With Reference to Longwall Mining, The Coal Journal (Australia), August, s.50-58.

YERALTI MERMER İŞLETMELERİNDE ODA TOPUK YÖNTEM PARAMETRELERİNİN BELİRLENMESİ

Year 2014, Volume: 16 Issue: 47, 41 - 50, 01.05.2014

Abstract

Dünyada ve ülkemizde artan doğal taş ihtiyacı, işletilmekte olan doğal taş ocaklarını giderek daha derin
kotlarda üretim yapmaya zorlamaktadır. Bunun yanı sıra mermer ocağı altyapı faaliyetlerinin temin edilmesinin
güç olduğu sarp arazilerde, üst örtü (dekapaj) kalınlığının fazla, iklimin sert olduğu alanlarda ve en önemlisi blok
veriminin derin kotlarda arttığı mermer ocaklarında yeraltı mermer işletmeciliği kaçınılmaz bir hal almaktadır.
Yeraltı üretim yöntemlerinden oda-topuk yöntemi kullanılarak yapılacak üretimler, hem atıl durumdaki mermer
ocaklarının yeniden ekonomiye kazandırılması bakımından hem de açık işletme ile üretilmesi ekonomik
olmayan mermer ocaklarının üretime alınması ve mevcut rezervlerin daha efektif ve kısa zamanda
değerlendirilmesi açısından önemlidir. Bu nedenle, hazırlanan çalışmada ülkemizde beş farklı bölgeden seçilen,
oda topuk yöntemi ile üretim yapılabilecek mermer ocakları üzerinde yeraltı doğal taş üretim parametreleri,
teknik ve ekonomik açıdan değerlendirilerek ortaya konulmaya çalışılmıştır

References

  • Akkoç T. (2003). “Derin Mermer Yataklarının Yeraltı Üretim Yöntemleriyle İşletilebilirliğinin Araştırılması”, Dokuz Eylül Üniversitesi, Fen Bilimleri Enstitüsü, Y. Lisans Tezi, s.113
  • Amadei, B., Stephansson, O. (1997): “Rock Stress and Its Measurement” London: Chapman and Hall, s.490.
  • Barron, K., (1984): “An Analytical Approach to The Design of Coal Pillars”, CIM Bulletin, cilt. 77, no.868, s.118-124.
  • Bieniawski, Z. T. (1984): “Rock Mechanics Design in Mining and Tunnelling, A. A.Balkema, Rotterdam, s.272
  • Hardy, P., Agapito, J. F. T., (1982): “Induced Horizontal Stress Method of Pillar Design in Oil Shale., XV Oil Shale Symp. Colorado School of Mines, Golden, Colorado, no.1. Hedley D.G.F ve Grant F. (1972): “Stope and Pillar Design for the Elliot Lake Uranium Mines”, CIM Trans., s.121- 128.
  • Hoek, E., Brown, E.T. (1980): “Underground Excavations in Rock” London: England.
  • Kimmelmann, M. R., Hyde, B., Madgwick, R. J., (1984): “The Use of Computer Applications at BCL Limited In Planning Pillar Extraction and Design of Mining Layouts.” Proc of the ISMR Symp. Design and Performance of Underground Excavations. Brit. Geotech. Soc., London.s.53-63
  • King, H. J. and Whittaker, B.N. (1971): “A Review of Current Knowledge on Roadway Behaviour, Especially the Problems on Which Further Information is Required”, Proc. of the Symposium on Strata Control in Roadways, University of Nottingham, s.73-89.
  • Kulaksız, S., (2012): “Anadolu Antik (Mermer) Doğaltaş ve Ocakları ve Harran Bazda Yer altı Ocak İşletmesi”, 8’inci Uluslararası Mermer ve Doğal Taş Kongresi,Afyon, cilt.1, s.1-7
  • Kun, M., Onargan, T., (2013): “Influence of The Fault Zone In Shallow Tunneling: A Case Study of Izmir Metro Tunnel”, Tunnelling and Underground Space Technology, cilt.33, s.34- 45.
  • Sjöberg, J., (1992): “Failure Modes and Pillar Behaviour in the Zinkgruvan Mine.” In: Proc., 33. U.S. Rock Mech. Symp., Santa Fe. A. A. Balkema Publ., Rotterdam.
  • Stacey, T.R. ve Page, C. H. (1986): “Practical Handbook for Underground Rock Mechanics” , Trans Tech Publications.
  • Potvin, Y., Hudyma, M. R., Miller, H. D. S.,(1989): “Design Guidelines For Open Stope Support”. Bull. Can. Min. Metall., vol.82, s. 53-62
  • Whittaker, B. N. (1984): “Chain Pillar Design Considerations With Reference to Longwall Mining, The Coal Journal (Australia), August, s.50-58.
There are 14 citations in total.

Details

Other ID JA97ZV88UN
Journal Section Research Article
Authors

Mete Kun This is me

Tahir Mallı This is me

Publication Date May 1, 2014
Published in Issue Year 2014 Volume: 16 Issue: 47

Cite

APA Kun, M., & Mallı, T. (2014). YERALTI MERMER İŞLETMELERİNDE ODA TOPUK YÖNTEM PARAMETRELERİNİN BELİRLENMESİ. Dokuz Eylül Üniversitesi Mühendislik Fakültesi Fen Ve Mühendislik Dergisi, 16(47), 41-50.
AMA Kun M, Mallı T. YERALTI MERMER İŞLETMELERİNDE ODA TOPUK YÖNTEM PARAMETRELERİNİN BELİRLENMESİ. DEUFMD. May 2014;16(47):41-50.
Chicago Kun, Mete, and Tahir Mallı. “YERALTI MERMER İŞLETMELERİNDE ODA TOPUK YÖNTEM PARAMETRELERİNİN BELİRLENMESİ”. Dokuz Eylül Üniversitesi Mühendislik Fakültesi Fen Ve Mühendislik Dergisi 16, no. 47 (May 2014): 41-50.
EndNote Kun M, Mallı T (May 1, 2014) YERALTI MERMER İŞLETMELERİNDE ODA TOPUK YÖNTEM PARAMETRELERİNİN BELİRLENMESİ. Dokuz Eylül Üniversitesi Mühendislik Fakültesi Fen ve Mühendislik Dergisi 16 47 41–50.
IEEE M. Kun and T. Mallı, “YERALTI MERMER İŞLETMELERİNDE ODA TOPUK YÖNTEM PARAMETRELERİNİN BELİRLENMESİ”, DEUFMD, vol. 16, no. 47, pp. 41–50, 2014.
ISNAD Kun, Mete - Mallı, Tahir. “YERALTI MERMER İŞLETMELERİNDE ODA TOPUK YÖNTEM PARAMETRELERİNİN BELİRLENMESİ”. Dokuz Eylül Üniversitesi Mühendislik Fakültesi Fen ve Mühendislik Dergisi 16/47 (May 2014), 41-50.
JAMA Kun M, Mallı T. YERALTI MERMER İŞLETMELERİNDE ODA TOPUK YÖNTEM PARAMETRELERİNİN BELİRLENMESİ. DEUFMD. 2014;16:41–50.
MLA Kun, Mete and Tahir Mallı. “YERALTI MERMER İŞLETMELERİNDE ODA TOPUK YÖNTEM PARAMETRELERİNİN BELİRLENMESİ”. Dokuz Eylül Üniversitesi Mühendislik Fakültesi Fen Ve Mühendislik Dergisi, vol. 16, no. 47, 2014, pp. 41-50.
Vancouver Kun M, Mallı T. YERALTI MERMER İŞLETMELERİNDE ODA TOPUK YÖNTEM PARAMETRELERİNİN BELİRLENMESİ. DEUFMD. 2014;16(47):41-50.

Dokuz Eylül Üniversitesi, Mühendislik Fakültesi Dekanlığı Tınaztepe Yerleşkesi, Adatepe Mah. Doğuş Cad. No: 207-I / 35390 Buca-İZMİR.