BibTex RIS Cite

INVESTIGATING THE EFFECTS OF DIFFERENT KANBAN NUMBERS AND PROCESSING TIME DISTRIBUTIONS ON THE PERFORMANCE OF A JIT SYSTEM IN CELLULAR PRODUCTION ENVIRONMENT

Year 2002, Volume: 4 Issue: 2, 17 - 27, 01.05.2002

Abstract

In the simulation studies related to Just-In-Time (JIT) Production systems, mass
production systems have been taken into the consideration mostly. Simulation studies based
on the JIT philosophy in the cellular production environment are rather few, and in the
existing studies only a part of the production line has been considered rather than the whole.
In this study, the behaviours of a JIT production line in cellular production environment with
respect to different kanban numbers and processing time distributions are investigated.
Operator utilization at the last cell, output, cycle time and work in process buffer are selected
as performance measures. System is simulated by using SIMAN simulation language and
MINITAB package program is used to analyze the experimental results statistically.

References

  • Banks J., Carson J.S. (1984): “Discrete-Event System Simultion”, Prentice Hall.
  • Chaturvedi M., Golhar D.Y. (1992): “Simulation Modeling and Analysis of a JIT Production System”, Production Planning&Control, V.3, N.1, p.81-92.
  • Ertay T. (1998): “Simulation Approach in Comparison of a Pull System in a Cell Production System with a Push System in a Conventional Production System according to Flexible Cost: a Case Study”, International Journal of Production Economics, V.56, p.145-155.
  • Harhalakis G., Nagi R., Proth J.M. (1990): “An Efficient Heuristic in Manufacturing Cell Formation for Group Technology Applications”, International Journal of Production Research, V.28, N.1, p.185-198.
  • Hines W.W., Montgomery D.C. (1990): “Probability and Statistics in Engineering and Management Science”, 3rd Edition, John Wiley and Sons.
  • Min H., Shin D. (1993): “Simultaneous Formation of Machine and Human Cells in Group Technology: a Multiple Objective Approach”, International Journal of Production Research, V.31, N.10, p.2307-2318.
  • Muralidhar K., Swenseth S.R., Wilson R.L. (1992): “Describing Processing Time when Simulating JIT Environments”, International Journal of Production Research, V.30, N.1, p.1-11.
  • Sarker B.R. (1989): “Simulating a JIT Production System”, Computers Ind. Eng, V.16, N.1, p.127-137.
  • Sarker B.R., Fitzimmons J.A. (1989): “The Performance of Push and Pull Systems: A Simulation and Comparative Study”, International Journal of Production Research, V.27, N.10, p.1715-1731.
  • Sundaram R.M., Lian W.S. (1990): “An Approach for Designing Cellular Manufacturing Systems”, Manufacturing Review, V.3, N.2, p.91-97.

KANBAN SAYISI VE İŞLEM ZAMANI DAĞILIMLARININ HÜCRESEL İMALAT ORTAMINDAKİ BİR JIT SİSTEMİNİN PERFORMANSI ÜZERİNDEKİ ETKİLERİNİN İNCELENMESİ

Year 2002, Volume: 4 Issue: 2, 17 - 27, 01.05.2002

Abstract

Tam Zamanında Üretim (JIT) sistemleri ile ilgili simülasyon çalışmalarında çoğunlukla
seri üretim sistemleri dikkate alınmıştır. Hücresel İmalat ortamında JIT sisteminin işleyişine
dayalı simülasyon çalışmaları son derece az olup, var olan çalışmalarda da üretim hattının
bütünü yerine sadece belli bir kesimi ele alınmaktadır. Bu çalışmada, hipotetik bir sistem
tasarlanarak hücresel imalat ortamında bir JIT üretim hattının değişik kanban sayıları ve farklı
işlem zamanı dağılımları altındaki davranışları incelenmiştir. Son hücredeki operatörün
kullanım oranı, çıktı miktarı, çevrim zamanı ve aşamalar arasındaki stok miktarı (WIP)
performans ölçütleri olarak seçilmiştir. Sistem SIMAN simülasyon dili ile simüle edilmiş,
deney sonuçlarının istatistiksel analizinde ise MINITAB paket programı kullanılmıştır.

References

  • Banks J., Carson J.S. (1984): “Discrete-Event System Simultion”, Prentice Hall.
  • Chaturvedi M., Golhar D.Y. (1992): “Simulation Modeling and Analysis of a JIT Production System”, Production Planning&Control, V.3, N.1, p.81-92.
  • Ertay T. (1998): “Simulation Approach in Comparison of a Pull System in a Cell Production System with a Push System in a Conventional Production System according to Flexible Cost: a Case Study”, International Journal of Production Economics, V.56, p.145-155.
  • Harhalakis G., Nagi R., Proth J.M. (1990): “An Efficient Heuristic in Manufacturing Cell Formation for Group Technology Applications”, International Journal of Production Research, V.28, N.1, p.185-198.
  • Hines W.W., Montgomery D.C. (1990): “Probability and Statistics in Engineering and Management Science”, 3rd Edition, John Wiley and Sons.
  • Min H., Shin D. (1993): “Simultaneous Formation of Machine and Human Cells in Group Technology: a Multiple Objective Approach”, International Journal of Production Research, V.31, N.10, p.2307-2318.
  • Muralidhar K., Swenseth S.R., Wilson R.L. (1992): “Describing Processing Time when Simulating JIT Environments”, International Journal of Production Research, V.30, N.1, p.1-11.
  • Sarker B.R. (1989): “Simulating a JIT Production System”, Computers Ind. Eng, V.16, N.1, p.127-137.
  • Sarker B.R., Fitzimmons J.A. (1989): “The Performance of Push and Pull Systems: A Simulation and Comparative Study”, International Journal of Production Research, V.27, N.10, p.1715-1731.
  • Sundaram R.M., Lian W.S. (1990): “An Approach for Designing Cellular Manufacturing Systems”, Manufacturing Review, V.3, N.2, p.91-97.
There are 10 citations in total.

Details

Other ID JA63SF24VE
Journal Section Research Article
Authors

Ömer Faruk Baykoç This is me

Yunus Ege This is me

Raed Abu Shahla This is me

Publication Date May 1, 2002
Published in Issue Year 2002 Volume: 4 Issue: 2

Cite

APA Baykoç, Ö. F., Ege, Y., & Shahla, R. A. (2002). KANBAN SAYISI VE İŞLEM ZAMANI DAĞILIMLARININ HÜCRESEL İMALAT ORTAMINDAKİ BİR JIT SİSTEMİNİN PERFORMANSI ÜZERİNDEKİ ETKİLERİNİN İNCELENMESİ. Dokuz Eylül Üniversitesi Mühendislik Fakültesi Fen Ve Mühendislik Dergisi, 4(2), 17-27.
AMA Baykoç ÖF, Ege Y, Shahla RA. KANBAN SAYISI VE İŞLEM ZAMANI DAĞILIMLARININ HÜCRESEL İMALAT ORTAMINDAKİ BİR JIT SİSTEMİNİN PERFORMANSI ÜZERİNDEKİ ETKİLERİNİN İNCELENMESİ. DEUFMD. May 2002;4(2):17-27.
Chicago Baykoç, Ömer Faruk, Yunus Ege, and Raed Abu Shahla. “KANBAN SAYISI VE İŞLEM ZAMANI DAĞILIMLARININ HÜCRESEL İMALAT ORTAMINDAKİ BİR JIT SİSTEMİNİN PERFORMANSI ÜZERİNDEKİ ETKİLERİNİN İNCELENMESİ”. Dokuz Eylül Üniversitesi Mühendislik Fakültesi Fen Ve Mühendislik Dergisi 4, no. 2 (May 2002): 17-27.
EndNote Baykoç ÖF, Ege Y, Shahla RA (May 1, 2002) KANBAN SAYISI VE İŞLEM ZAMANI DAĞILIMLARININ HÜCRESEL İMALAT ORTAMINDAKİ BİR JIT SİSTEMİNİN PERFORMANSI ÜZERİNDEKİ ETKİLERİNİN İNCELENMESİ. Dokuz Eylül Üniversitesi Mühendislik Fakültesi Fen ve Mühendislik Dergisi 4 2 17–27.
IEEE Ö. F. Baykoç, Y. Ege, and R. A. Shahla, “KANBAN SAYISI VE İŞLEM ZAMANI DAĞILIMLARININ HÜCRESEL İMALAT ORTAMINDAKİ BİR JIT SİSTEMİNİN PERFORMANSI ÜZERİNDEKİ ETKİLERİNİN İNCELENMESİ”, DEUFMD, vol. 4, no. 2, pp. 17–27, 2002.
ISNAD Baykoç, Ömer Faruk et al. “KANBAN SAYISI VE İŞLEM ZAMANI DAĞILIMLARININ HÜCRESEL İMALAT ORTAMINDAKİ BİR JIT SİSTEMİNİN PERFORMANSI ÜZERİNDEKİ ETKİLERİNİN İNCELENMESİ”. Dokuz Eylül Üniversitesi Mühendislik Fakültesi Fen ve Mühendislik Dergisi 4/2 (May 2002), 17-27.
JAMA Baykoç ÖF, Ege Y, Shahla RA. KANBAN SAYISI VE İŞLEM ZAMANI DAĞILIMLARININ HÜCRESEL İMALAT ORTAMINDAKİ BİR JIT SİSTEMİNİN PERFORMANSI ÜZERİNDEKİ ETKİLERİNİN İNCELENMESİ. DEUFMD. 2002;4:17–27.
MLA Baykoç, Ömer Faruk et al. “KANBAN SAYISI VE İŞLEM ZAMANI DAĞILIMLARININ HÜCRESEL İMALAT ORTAMINDAKİ BİR JIT SİSTEMİNİN PERFORMANSI ÜZERİNDEKİ ETKİLERİNİN İNCELENMESİ”. Dokuz Eylül Üniversitesi Mühendislik Fakültesi Fen Ve Mühendislik Dergisi, vol. 4, no. 2, 2002, pp. 17-27.
Vancouver Baykoç ÖF, Ege Y, Shahla RA. KANBAN SAYISI VE İŞLEM ZAMANI DAĞILIMLARININ HÜCRESEL İMALAT ORTAMINDAKİ BİR JIT SİSTEMİNİN PERFORMANSI ÜZERİNDEKİ ETKİLERİNİN İNCELENMESİ. DEUFMD. 2002;4(2):17-2.

Dokuz Eylül Üniversitesi, Mühendislik Fakültesi Dekanlığı Tınaztepe Yerleşkesi, Adatepe Mah. Doğuş Cad. No: 207-I / 35390 Buca-İZMİR.