İKİ AŞAMALI YEŞİL BİR TEDARİK ZİNCİRİNDE STOK KONTROLÜ
Abstract
Keywords
References
- Ala, D. M., & İkiz, Y. (2015). Dokuma üretimi süresince oluşan kumaş hatalarının belirlenmesine yönelik istatistiksel bir araştırma. Pamukkale Üniversitesi Mühendislik Bilimleri Dergisi, 21(7), 282-287.
- Aljazzar, S. M., Gurtu, A., & Jaber, M. Y. (2018). Delay-in-payments-A strategy to reduce carbon emissions from supply chains. Journal of Cleaner Production, 170, 636-644.
- Bazan, E., Jaber, M. Y., & Zanoni, S. (2017). Carbon emissions and energy effects on a two-level manufacturer-retailer closed-loop supply chain model with remanufacturing subject to different coordination mechanisms. International Journal of Production Economics, 183, 394-408.
- Büyüközkan, G., & Vardaloğlu, Z. (2008). Yeşil tedarik zinciri yönetimi. Lojistik Dergisi, 8, 66-73.
- Chen, H. Y., Li, A. J., & Finlow, D. E. (2009). The lead and lead-acid battery industries during 2002 and 2007 in China. Journal of Power Sources, 191(1), 22-27.
- Chen, T. H. (2017). Optimizing pricing, replenishment and rework decision for imperfect and deteriorating items in a manufacturer-retailer channel. International Journal of Production Economics, 183, 539-550.
- Cheng, Y. L., Wang, W. T., Wei, C. C., & Lee, K. L. (2018). An integrated lot-sizing model for imperfect production with multiple disposals of defective items. Scientia Iranica, 25(2), 852-867.
- Chiu, C. Y., Yang, M. F., Tang, C. J., & Lin, Y. (2013). Integrated imperfect production inventory model under permissible delay in payments depending on the order quantity. Journal of Industrial & Management Optimization, 9(4), 945.
Details
Primary Language
Turkish
Subjects
Business Administration
Journal Section
Research Article
Authors
Harun Öztürk
*
Türkiye
Publication Date
July 10, 2023
Submission Date
November 17, 2022
Acceptance Date
May 29, 2023
Published in Issue
Year 2023 Volume: 24 Number: 2