In this paper, a 0 -1 programming model is developed to solve line - balancing problems. The objective function is set in such away that it simultaınously takes into account the rate of production and the labor time. The application of this model on various problems has indicated the fact that the cycle length and the number of stations to be opened depends on the level of pıofit contribution and the unit labor cost.
Birincil Dil | Türkçe |
---|---|
Bölüm | Makaleler |
Yazarlar | |
Yayımlanma Tarihi | 1 Ocak 1985 |
Yayımlandığı Sayı | Yıl 1985 Sayı: 7 |
ERÜ İktisadi ve İdari Bilimler Fakültesi Dergisi 2021 | iibfdergi@erciyes.edu.tr
Bu eser Creative Commons Atıf-Gayri Ticari-Türetilemez 4.0 Uluslararası Lisansı ile lisanslanmıştır.