Son yıllarda hızla artan enerji ihtiyacını |
In recent years, the trend
towards renewable energy sources has increased to meet the rapidly growing
energy demand and especially wind energy, which has a high potential around the
world, is preferred. In this study, feasibility analyses of the wind power
plant(RES) investments have been performed for different wind power plant
having different capacities (0.8, 4 ve 8 MW) in Mut-Gülnar, Mersin by using the
RETScreen program and they have been compared with each other. The wind power
plants having different capacities of 0.8, 4 ve 8 MW in both Mut and Gülnar
have been analyzed and repayment period have been determined. Mut should be
selected as investment location due to the fact that the average wind speed of
Mut is higher than that of Gülnar and repayment period is shorther than that of
Gülnar. Moreover, it is determined that the wind power plant having 1 turbine in Mut
has a repayment period as 5 years, the wind power plant having 3 turbines has a
repayment period as 3.5 years while the power plant having 5 turbines repays
the investment for it in three years. In terms of economy, the projects of wind
power plant are profitable investment when the bank interest income is
considered.