Akıllı SERU sistemleri: DeJong öğrenme etkisi ile çok dönemli üretim planlaması yeniliği
Öz
Anahtar Kelimeler
Kaynakça
- 1. Yin Y., Stecke K.E., Li D., The evolution of production systems from Industry 2.0 through Industry 4.0, Int. J. Prod. Res., 56 (1-2), 848-861, 2018.
- 2. Yu Y., Tang J., Review of seru production, Front. Eng. Manag., 6 (2), 183-192, 2019.
- 3. Stecke K.E., Yin Y., Kaku I., Murase Y., Seru: The organizational extension of JIT for a super-talent factory, Int. J. Strateg. Decis. Sci., 3 (1), 106-119, 2012.
- 4. Yin Y., Stecke K.E., Swink M., Kaku I., Lessons from seru production on manufacturing competitively in a high cost environment, J. Oper. Manag., 49-51, 67-76, 2017.
- 5. Yin Y., Kaku I., Stecke K.E., The evolution of seru production systems throughout Canon, Neilsonjournals Publishing, 2008.
- 6. Wright T.P., Factors affecting the cost of airplanes, J. Aeronaut. Sci., 3 (4), 122-128, 1936.
- 7. DeJong J.R., The effects of increasing skill on cycle time and its consequences for time standards, Ergonomics, 1 (1), 51-60, 1957.
- 8. Kaku I., Gong J., Tang J., Yin Y., A mathematical model for converting conveyor assembly line to cellular manufacturing, Ind. Eng. Manag. Syst., 7 (2), 160-170, 2008.
Ayrıntılar
Birincil Dil
Türkçe
Konular
Çok Ölçütlü Karar Verme, Üretim ve Hizmet Sistemleri, Üretimde Optimizasyon
Bölüm
Araştırma Makalesi
Yazarlar
Çağdaş Yıldız
*
0009-0006-8384-2466
Türkiye
Yayımlanma Tarihi
31 Mart 2026
Gönderilme Tarihi
19 Temmuz 2025
Kabul Tarihi
16 Ocak 2026
Yayımlandığı Sayı
Yıl 2026 Cilt: 41 Sayı: 1