Research Article

A New Mathematical Model for the Integrated Solution of Cell Formation and Part Scheduling Problem

Volume: 32 Number: 4 December 1, 2019
EN

A New Mathematical Model for the Integrated Solution of Cell Formation and Part Scheduling Problem

Abstract

In a cellular manufacturing system, three important decisions are to form cells, design the layout of cells, and schedule of parts in the cells. Most of the studies in this area have discussed these decisions separately and independently. However, for general system performance, it is important to consider these decisions in relation to each other, and integrated solutions are needed. But few studies include that two or more decisions are handled together. In this paper, a new mathematical model considers decisions both cell formation and part-scheduling in cells together is proposed. The objective function is designed in integrated manner and includes two objectives to minimize together. These objectives are to minimize the exceptional elements and makespan of the jobs. Numerical examples are provided in the paper to show that the model is valid and it can be applicable as practically. The test data are derived from the related literature and solved by GAMS software CPLEX solver. The results show that the performance of the cellular manufacturing systems in terms of formation of cells and scheduling of parts can be significantly improved by the proposed multi objective mathematical model.

Keywords

References

  1. Singh, N. and Rajamani, D., Cellular manufacturing systems: design, planning and control. Chapman & Hall, (1996).
  2. Ang, D., "Exceptional Elements Framework in Group Technology", Simulation, 17 (18), (2011).
  3. Arkat, J., M. Hosseinabadi Farahani, and L. Hosseini, "Integrating cell formation with cellular layout and operations scheduling", The International Journal of Advanced Manufacturing Technology, 61(5), 637-647, (2012).
  4. Wu, X., Chu, C. H., Wang, Y., Yue, D., "Genetic algorithms for integrating cell formation with machine layout and scheduling. Computers & Industrial Engineering", 53(2), 277-289, (2007).
  5. Wang, X., Tang, J., Yung, K.L., "Optimization of the multi-objective dynamic cell formation problem using a scatter search approach", The International Journal of Advanced Manufacturing Technology, 44(3-4), 318-329, (2009).
  6. Deljoo, V., Mirzapour Al-e-hashem, S. M. J., Deljoo, F., Aryanezhad, M. B., "Using genetic algorithm to solve dynamic cell formation problem", Applied Mathematical Modelling, 34(4), 1078-1092, (2010).
  7. Brown, J.R., "A capacity constrained mathematical programming model for cellular manufacturing with exceptional elements", Journal of Manufacturing Systems, 37, 227-232, (2015).
  8. Buruk Sahin, Y. and Alpay, S., "A metaheuristic approach for a cubic cell formation problem", Expert Systems with Applications, 65, 40-51, (2016).

Details

Primary Language

English

Subjects

Engineering

Journal Section

Research Article

Publication Date

December 1, 2019

Submission Date

October 17, 2018

Acceptance Date

June 20, 2019

Published in Issue

Year 2019 Volume: 32 Number: 4

APA
Buruk Sahın, Y., & Alpay, S. (2019). A New Mathematical Model for the Integrated Solution of Cell Formation and Part Scheduling Problem. Gazi University Journal of Science, 32(4), 1196-1210. https://doi.org/10.35378/gujs.471637
AMA
1.Buruk Sahın Y, Alpay S. A New Mathematical Model for the Integrated Solution of Cell Formation and Part Scheduling Problem. Gazi University Journal of Science. 2019;32(4):1196-1210. doi:10.35378/gujs.471637
Chicago
Buruk Sahın, Yeliz, and Serafettin Alpay. 2019. “A New Mathematical Model for the Integrated Solution of Cell Formation and Part Scheduling Problem”. Gazi University Journal of Science 32 (4): 1196-1210. https://doi.org/10.35378/gujs.471637.
EndNote
Buruk Sahın Y, Alpay S (December 1, 2019) A New Mathematical Model for the Integrated Solution of Cell Formation and Part Scheduling Problem. Gazi University Journal of Science 32 4 1196–1210.
IEEE
[1]Y. Buruk Sahın and S. Alpay, “A New Mathematical Model for the Integrated Solution of Cell Formation and Part Scheduling Problem”, Gazi University Journal of Science, vol. 32, no. 4, pp. 1196–1210, Dec. 2019, doi: 10.35378/gujs.471637.
ISNAD
Buruk Sahın, Yeliz - Alpay, Serafettin. “A New Mathematical Model for the Integrated Solution of Cell Formation and Part Scheduling Problem”. Gazi University Journal of Science 32/4 (December 1, 2019): 1196-1210. https://doi.org/10.35378/gujs.471637.
JAMA
1.Buruk Sahın Y, Alpay S. A New Mathematical Model for the Integrated Solution of Cell Formation and Part Scheduling Problem. Gazi University Journal of Science. 2019;32:1196–1210.
MLA
Buruk Sahın, Yeliz, and Serafettin Alpay. “A New Mathematical Model for the Integrated Solution of Cell Formation and Part Scheduling Problem”. Gazi University Journal of Science, vol. 32, no. 4, Dec. 2019, pp. 1196-10, doi:10.35378/gujs.471637.
Vancouver
1.Yeliz Buruk Sahın, Serafettin Alpay. A New Mathematical Model for the Integrated Solution of Cell Formation and Part Scheduling Problem. Gazi University Journal of Science. 2019 Dec. 1;32(4):1196-210. doi:10.35378/gujs.471637

Cited By