Computation of Critical Path Probabilities by Modified PERT

Volume: 33 Number: 3 September 1, 2020
EN

Computation of Critical Path Probabilities by Modified PERT

Abstract

Detection of the critical path and the uncertainty of the estimated duration are important for the contactors. PERT and Modified PERT methods can estimate the uncertainty of construction duration. However, probability of a path being critical is not estimated by the aforementioned methods. Monte Carlo simulation is implemented for the detection of probabilities of activities being critical. However, Monte Carlo simulation requires significant computational demand and this method is not suitable for iterative optimization procedure. In this study, Modified PERT method is enhanced by considering every possible path completion combinations. As a result, probability of finishing a path at a certain time and finishing the remaining paths earlier than the corresponding time is computed. This enabled the computation of probability of a path being critical path. For large networks the number of path completion combinations increases which makes the probabilistic computations burdensome. The relationship between the path completion combinations and the statistical intersection operations is derived and a macro code which executes the intersection computations is generated. The algorithm is tested on four sample problems and the results are compared with Monte Carlo simulation. Analysis results interpret that the method is significantly faster than Monte Carlo simulation with similar probability estimations. 

Keywords

References

  1. Ahuja, H. N., and Nandakumar, V. (1985). Simulation model to forecast project completion time. Journal of construction engineering and management, 111(4), 325-342.
  2. Moder, J. J., Phillips C. R., and Davis E. W. (1983), Project management with CPM, PERT and precedence diagramming, 3rd Edition, Van Nostrand Reinhold Company, New York.
  3. Ang, A. H., Chaker, A. A., and Abdelnour, J. (1975). Analysis of activity networks under uncertainty. Journal of the Engineering Mechanics Division, 101(4), 373-387.
  4. Taroun, A. (2014). Towards a better modelling and assessment of construction risk: Insights from a literature review. International journal of Project management, 32(1), 101-115.
  5. Helton, J. C. (1993). Uncertainty and sensitivity analysis techniques for use in performance assessment for radioactive waste disposal. Reliability Engineering & System Safety, 42(2-3), 327-367.
  6. Cheah, C. Y., and Liu, J. (2006). Valuing governmental support in infrastructure projects as real options using Monte Carlo simulation. Construction management and economics, 24(5), 545-554.
  7. Khamooshi, H., and Cioffi, D. F. (2012). Uncertainty in task duration and cost estimates: Fusion of probabilistic forecasts and deterministic scheduling. Journal of construction engineering and management, 139(5), 488-497.
  8. Tao, L., Wu, D., Liu, S., and Lambert, J. H. (2017). Schedule risk analysis for new-product development: The GERT method extended by a characteristic function. Reliability Engineering & System Safety, 167, 464-473.

Details

Primary Language

English

Subjects

Engineering

Journal Section

Research Article

Publication Date

September 1, 2020

Submission Date

August 27, 2019

Acceptance Date

April 9, 2020

Published in Issue

Year 2020 Volume: 33 Number: 3

APA
Bettemir, O. (2020). Computation of Critical Path Probabilities by Modified PERT. Gazi University Journal of Science, 33(3), 673-694. https://doi.org/10.35378/gujs.611579
AMA
1.Bettemir O. Computation of Critical Path Probabilities by Modified PERT. Gazi University Journal of Science. 2020;33(3):673-694. doi:10.35378/gujs.611579
Chicago
Bettemir, Onder. 2020. “Computation of Critical Path Probabilities by Modified PERT”. Gazi University Journal of Science 33 (3): 673-94. https://doi.org/10.35378/gujs.611579.
EndNote
Bettemir O (September 1, 2020) Computation of Critical Path Probabilities by Modified PERT. Gazi University Journal of Science 33 3 673–694.
IEEE
[1]O. Bettemir, “Computation of Critical Path Probabilities by Modified PERT”, Gazi University Journal of Science, vol. 33, no. 3, pp. 673–694, Sept. 2020, doi: 10.35378/gujs.611579.
ISNAD
Bettemir, Onder. “Computation of Critical Path Probabilities by Modified PERT”. Gazi University Journal of Science 33/3 (September 1, 2020): 673-694. https://doi.org/10.35378/gujs.611579.
JAMA
1.Bettemir O. Computation of Critical Path Probabilities by Modified PERT. Gazi University Journal of Science. 2020;33:673–694.
MLA
Bettemir, Onder. “Computation of Critical Path Probabilities by Modified PERT”. Gazi University Journal of Science, vol. 33, no. 3, Sept. 2020, pp. 673-94, doi:10.35378/gujs.611579.
Vancouver
1.Onder Bettemir. Computation of Critical Path Probabilities by Modified PERT. Gazi University Journal of Science. 2020 Sep. 1;33(3):673-94. doi:10.35378/gujs.611579