Minimizing Completion Time Variance in a Flowshop Scheduling Problem with a Learning Effect

Abstract

In this paper, flowshop scheduling problem with a learning effect is considered. The objective function of the problem is minimizing completion times variance. A non-linear programming model is developed for the problem. Also the model is tested on an example. Results of computational tests show that the proposed model is effective in solving problems with up to 30 jobs. The overall average solution error of the heuristic algorithm is 2 %. Processing of the 30 jobs case requires only 0.1 s on average to obtain an ultimate or even optimal solution. To solve the large sizes problems up to 500 jobs, heuristics methods were used. The performances of heuristics about the solution error were evaluated with the non-linear programming model results for small size problems and each other for large size problems. According to results, the special heuristic for all number of jobs was the more effective than others. The heuristic scheduling algorithm is more practical to solve real world applications than the non-linear programming model.

 

Key words: flowshop scheduling, learning effect, completion time variance, non-linear programming model, heuristic methods

Keywords

References

  1. Merten, A.G., Muller, minimization in single machine sequencing problems”, Management Science, 18: 518–528, (1972). M.E., “Variance
  2. Viswanathkumar, G., Srinivasan, G., “A branch and bound algorithm to minimize completion time variance on a single processor”, Computers & Operations Research, 30: 1135–1150, (2003).
  3. Schrage, L., “Minimizing the time-in-system variance for a finite jobset”, Management Science, 21: 540–543, (1975).
  4. Hall, N.G., Kubiak, W.. “Proof of a conjecture of Schrage about the completion time variance problem”, Operations Research Letters, 14: 467– 472, (1991)
  5. Eilon, S., Chowdhury, I.C. “Minimizing the waiting time variance in the single machine problem”, Management Science, 23: 567–575, (1977).
  6. Bagchi, U., Chang, Y.L., Sullivan, R.S., “Minimizing absolute and squared deviation of completion times with different earliness and tardiness penalties and a common due date”, Naval Research Logistics, 34: 739–751, (1987).
  7. Gupta, M.C., Gupta, Y.P., Bector, C.R., “Minimizing the flow-time variance in single- machine systems”, Journal of Operational Research Society, 41: 767–779, (1990).
  8. Mittenthal, J., Raghavachari, M., Rana, A.I., “A hybrid simulated annealing approach for single machine scheduling problems with non-regular penalty functions”, Computers & Operations Research, 20: 103–111, (1993).

Details

Primary Language

English

Subjects

-

Journal Section

-

Authors

Publication Date

October 2, 2013

Submission Date

July 11, 2012

Acceptance Date

-

Published in Issue

Year 2013 Volume: 26 Number: 3

APA
Eren, T. (2013). Minimizing Completion Time Variance in a Flowshop Scheduling Problem with a Learning Effect. Gazi University Journal of Science, 26(3), 389-397. https://izlik.org/JA92NS95ZR
AMA
1.Eren T. Minimizing Completion Time Variance in a Flowshop Scheduling Problem with a Learning Effect. Gazi University Journal of Science. 2013;26(3):389-397. https://izlik.org/JA92NS95ZR
Chicago
Eren, Tamer. 2013. “Minimizing Completion Time Variance in a Flowshop Scheduling Problem With a Learning Effect”. Gazi University Journal of Science 26 (3): 389-97. https://izlik.org/JA92NS95ZR.
EndNote
Eren T (October 1, 2013) Minimizing Completion Time Variance in a Flowshop Scheduling Problem with a Learning Effect. Gazi University Journal of Science 26 3 389–397.
IEEE
[1]T. Eren, “Minimizing Completion Time Variance in a Flowshop Scheduling Problem with a Learning Effect”, Gazi University Journal of Science, vol. 26, no. 3, pp. 389–397, Oct. 2013, [Online]. Available: https://izlik.org/JA92NS95ZR
ISNAD
Eren, Tamer. “Minimizing Completion Time Variance in a Flowshop Scheduling Problem With a Learning Effect”. Gazi University Journal of Science 26/3 (October 1, 2013): 389-397. https://izlik.org/JA92NS95ZR.
JAMA
1.Eren T. Minimizing Completion Time Variance in a Flowshop Scheduling Problem with a Learning Effect. Gazi University Journal of Science. 2013;26:389–397.
MLA
Eren, Tamer. “Minimizing Completion Time Variance in a Flowshop Scheduling Problem With a Learning Effect”. Gazi University Journal of Science, vol. 26, no. 3, Oct. 2013, pp. 389-97, https://izlik.org/JA92NS95ZR.
Vancouver
1.Tamer Eren. Minimizing Completion Time Variance in a Flowshop Scheduling Problem with a Learning Effect. Gazi University Journal of Science [Internet]. 2013 Oct. 1;26(3):389-97. Available from: https://izlik.org/JA92NS95ZR