DÖKÜM SÜRECİNDE ANAHTAR PERFORMANS GÖSTERGELERİNİN BULANIK MOORA YÖNTEMİ İLE SIRALANMASI
Abstract
Keywords
References
- Alcan, P., Balin, A. ve Başlıgil, H., (2013). Fuzzy multicriteria selection among cogeneration systems: A real case application. Energy Build, 67, 624–634.
- Amaraatunga, D., Baldry ve D. Sarshar, M. (2000). Assessment of facilities management performance - what next?, Facilities, 18(1/2), 66-75.
- Bayyurt, N. (2007). İşletmelerde performans değerlendirmenin önemi ve performans göstergeleri arasındaki ilişkiler. Sosyal Siyaset Konferansları Dergisi, 53, 577-599.
- Brauers W. K. M. ve Zavadskas E. K. (2006). The MOORA method and its application to privatization in a transition. Control and Cybernetics, 35(2), 445-469.
- Carlucci, D. (2010). Evaluating and selecting key performance indicators: an ANP‐based model. Measuring Business Excellence, 14(2), 66 – 76.
- Chan, A. ve Chan, A. (2004). Key performance indicators for measuring construction success. Bencmarking: An International Journal, 11(2), 203-221.
- Gopal, E. ve Ramesh, D. (2014). Resource efficiency for sustainability in ferrous foundry - A case of Kolhapur MSME cluster. Indian Foundry Journal, 60(2), 30-39.
- Helvacı, M.A. (2002). Performans yönetimi sürecinde performans değerlendirmenin önemi. Ankara Üniversitesi Eğitim Bilimleri Fakültesi Dergisi, 35(1-2), 155-169.
Details
Primary Language
Turkish
Subjects
Business Administration
Journal Section
Research Article
Authors
Emre Bilgin Sarı
*
dokuz eylül üniversitesi
0000-0001-5110-1918
Türkiye
Onur Özveri
DOKUZ EYLÜL ÜNİVERSİTESİ
0000-0001-9203-917X
Türkiye
Zeynep Çalışkan
DOKUZ EYLÜL ÜNİVERSİTESİ
0000-0003-2450-7028
Türkiye
Publication Date
January 29, 2021
Submission Date
March 25, 2020
Acceptance Date
November 10, 2020
Published in Issue
Year 2020 Volume: 21 Number: 2