A Review on the Critical Factors Causing Delay of Delivery Time in Construction Projects
Abstract
Keywords
References
- S. F. Arshi and M. E. Sameh , "Significant factors causing delay in the UAE construction industry," Construction Management and Economics, vol. 24(11), pp. 1167-1176, 2006. http://dx.doi.org/10.1080/01446190600 827033.
- M. Khoshgoftar, A. H. Abu-Bakar and O. Osman, "Causes of Delays in Iranian Construction Projects," International Journal of Construction Management, vol 10(2), pp. 53-69., 2010.
- C. O. Aigbavboa, W. D. Thwala and M. J. Mukuka, "Construction Project delays in Lusaka, Zambia: Causes and Effects," Journal of Economics and Behavioral Studies, vol. 6(11), pp. 848-857, 2014.
- R. Vahid and S. A. Abbas , "Designing Pattern for Project Delay Analysis with Several Periods Extension of Time; Continuous and Discrete (Pr-to-Pr)," Computers & Industrial Engineering, 2020. https://doi.org/10.1016/j.cie.2020.106576.
- K. Aliyeh , K. Eun-Seok and K. Mohammad-Hossein , "Identifying and prioritizing delay factors in Iran’s oil construction projects," International Journal of Energy Sector Management, Emerald Publishing Limited, 2020. DOI 10.1108/IJESM-04-2020-0006.
- A. A. Khaled , H. H. Ayman and E. N. Gamal , "Guideline for preparing comprehensive extension of time (EoT) claim," HBRC Journal, 2014. http://dx.doi.org/10.1016/j.hbrcj.2014.01.005.
- M. Jamil, N. A. Mufti and S. Dar Waseem, "Analysis of Time Slippage for Construction Projects in Public Sector: Owner’s Perspective," Mehran University Research Journal of Engineering & Technology, vol. 31(4), pp. 12-16, 2012.
- E. Adnan, A. Jomah and K. Mohan , "Delays and cost overruns in the construction projects in the Gaza Strip," Journal of Financial Management of Property and Construction, vol. 14(2), pp. 126-151, https://doi.org/10.1108/13664380910977592, 2009.
Details
Primary Language
English
Subjects
Engineering
Journal Section
Research Article
Authors
Shitaw Tafesse
*
0000-0002-4027-9750
Ethiopia
Publication Date
March 7, 2021
Submission Date
October 22, 2020
Acceptance Date
February 28, 2021
Published in Issue
Year 2020 Volume: 6 Number: 4
Cited By
Systematic review of critical drivers for delay risk prediction: towards a conceptual framework for BIM-based construction projects
Frontiers in Engineering and Built Environment
https://doi.org/10.1108/FEBE-05-2022-0017A non-price-based tender evaluation methodology considering tenderers’ self-confidence with partial value functions and time decay analysis
Expert Systems with Applications
https://doi.org/10.1016/j.eswa.2024.124186Smart IoT-enabled vehicle-mounted weighing system for real-time monitoring and quantification of loose construction materials
Engineering, Construction and Architectural Management
https://doi.org/10.1108/ECAM-10-2024-1407Assessment of Factors Causing Construction Delays in Building Construction Projects in Somaliland
Advances in Civil Engineering
https://doi.org/10.1155/adce/7915818The Application of Content Validity Index in Identifying and Validating Material Delay Risks in Sorong Construction Projects
Civil and Sustainable Urban Engineering
https://doi.org/10.53623/csue.v6i1.938