Abstract

In this case study, we build a stochastic model to perform cost optimization and investment decision modeling for a system of interconnected power grids.

The modeled utility system is composed of four independent power-generating regions. Each region has its own power demand and portfolio of types of power generating plants. Because of the variation in generating assets, the generation cost profile can vary dramatically by region. Power transmission lines connect the four regions subject to the constraints that some regions are not connected at all, and the amount of power that is allowed to flow over each boundary is limited. Furthermore, power plant availability and total generating capacity vary stochastically, as a function of many factors.

First we mathematically define an optimization problem that allows us to meet the aggregate demand of all regions under these transmission constraints while minimizing the total cost. This is then implemented under the framework of uncertain generation capacity so we can make prob- abilistic statements about the costs and other relevant quantities. Ultimately, this optimization model can be used to guide and inform capacity and transmission expansion investment-related decisions. Our model is developed using Microsoft Excel and the @Risk and Evolver tools from Palisade’s Decision Tools Suite.

References

  • J.H. Holland, Adaptation in Natural and Artificial Systems: An Introductory Analysis with Applications to Biology, Control, and Artificial Intelligence, The University of Michigan Press, Ann Arbor, USA, 1975.
  • J.H. Holland, Genetic Algorithms. Scientific American, 267, 66–72 (1992).
  • OptTek Systems, Inc. OptQuest Engine Manual, http://www.opttek.com/ Documentation, September 2013.

-

Year 2013, Volume: 42 Issue: 2, 153 - 170, 15.11.2013

Abstract

Bu vaka çalışmasında, birbirine bağlı enerji ağları sistemi için maliyet optimizasyonu ve yatırım kararı modellemesi gerçekleştirmek amacıyla stokastik bir model oluşturulmuştur. Modellenen hizmet sistemi dört adet bağımsız güç üreten bölgeden oluşmaktadır. Her bölge, kendi güç talebi ve güç üretme tesis türleri portföyüne sahiptir. Varlık üretmedeki değişkenlik sebebiyle, üretim maliyeti profili bölgelere göre önemli ölçüde değişiklik gösterebilmektedir. Enerji nakil hatları, bazı bölgelerin birbirine hiçbir bağlantısı olmadığına ve her bir sınır üzerinden geçecek güç miktarının sınırlı olduğuna dair kısıtlar dâhilinde bu dört bölgeyi birbirine bağlar. Ayrıca, güç üretme tesislerinin kullanılabilirliği ve toplam güç üretme kapasitesi tahminler doğrultusunda pek çok faktöre bağlı olarak değişkenlik göstermektedir. Öncelikle, bu nakil kısıtlamaları dâhilinde toplam maliyetleri de minimize eden ve tüm bölgelerin toplam talebini bize sunan bir optimizasyon problemi matematiksel olarak tanımlanmıştır. Sonrasında bu model belirsiz üretim kapasitesi çerçevesinde uygulanmış ve bu şekilde maliyetler ve diğer ilgili nicelikler hakkında olası

References

  • J.H. Holland, Adaptation in Natural and Artificial Systems: An Introductory Analysis with Applications to Biology, Control, and Artificial Intelligence, The University of Michigan Press, Ann Arbor, USA, 1975.
  • J.H. Holland, Genetic Algorithms. Scientific American, 267, 66–72 (1992).
  • OptTek Systems, Inc. OptQuest Engine Manual, http://www.opttek.com/ Documentation, September 2013.
There are 3 citations in total.

Details

Primary Language English
Journal Section Operations Research
Authors

Andrew Howe This is me

Chris Humphries This is me

Publication Date November 15, 2013
Published in Issue Year 2013 Volume: 42 Issue: 2

Cite

APA Howe, A., & Humphries, C. (2013). Constrained Cost Optimization Under Uncertainty for an Incompletely-Connected Electric Utility System. İstanbul Üniversitesi İşletme Fakültesi Dergisi, 42(2), 153-170.
AMA Howe A, Humphries C. Constrained Cost Optimization Under Uncertainty for an Incompletely-Connected Electric Utility System. İstanbul Üniversitesi İşletme Fakültesi Dergisi. November 2013;42(2):153-170.
Chicago Howe, Andrew, and Chris Humphries. “Constrained Cost Optimization Under Uncertainty for an Incompletely-Connected Electric Utility System”. İstanbul Üniversitesi İşletme Fakültesi Dergisi 42, no. 2 (November 2013): 153-70.
EndNote Howe A, Humphries C (November 1, 2013) Constrained Cost Optimization Under Uncertainty for an Incompletely-Connected Electric Utility System. İstanbul Üniversitesi İşletme Fakültesi Dergisi 42 2 153–170.
IEEE A. Howe and C. Humphries, “Constrained Cost Optimization Under Uncertainty for an Incompletely-Connected Electric Utility System”, İstanbul Üniversitesi İşletme Fakültesi Dergisi, vol. 42, no. 2, pp. 153–170, 2013.
ISNAD Howe, Andrew - Humphries, Chris. “Constrained Cost Optimization Under Uncertainty for an Incompletely-Connected Electric Utility System”. İstanbul Üniversitesi İşletme Fakültesi Dergisi 42/2 (November 2013), 153-170.
JAMA Howe A, Humphries C. Constrained Cost Optimization Under Uncertainty for an Incompletely-Connected Electric Utility System. İstanbul Üniversitesi İşletme Fakültesi Dergisi. 2013;42:153–170.
MLA Howe, Andrew and Chris Humphries. “Constrained Cost Optimization Under Uncertainty for an Incompletely-Connected Electric Utility System”. İstanbul Üniversitesi İşletme Fakültesi Dergisi, vol. 42, no. 2, 2013, pp. 153-70.
Vancouver Howe A, Humphries C. Constrained Cost Optimization Under Uncertainty for an Incompletely-Connected Electric Utility System. İstanbul Üniversitesi İşletme Fakültesi Dergisi. 2013;42(2):153-70.