Proje Yönetiminde Zaman ve Maliyet Odaklı Bütünleşik Planlama Yaklaşımı ve Bir Uygulama
Abstract
Keywords
References
- Barutçugil, İ.S. (2008), “Proje Yönetiminde Örgütleme Sorunu ve Proje Örgütü”, Uludağ Üniversitesi İktisadi ve İdari Bilimler Fakültesi Dergisi, 4(2), 157-175.
- Belfort, A.C., Martens C.D.P. ve Freitas, H.M.R. (2016), “Entrepreneurship in project management systems: proposal of a model and preliminary empirical evidence”, Journal of Information Systems and Technology Management, 13(3), 405-422
- Blazewicz, J., Lenstra, J.K. ve Kan, R. (1983), “Scheduling subject to resource constraints: classification and complexity”, Discrete Applied Mathematics, 5(1), 11-24.
- Büyükşalvarcı, A. (2006), “Faaliyet Tabanlı Maliyetleme ve Bankalarda Bir Uygulama”, Selçuk Üniversitesi Karaman İ.İ.B.F. Dergisi, Sayı 10, 160-180.
- Cheng, J., Fowler, J., Kempf, K. ve Mason S. (2015), “Multi-mode resource-constrained project scheduling problems with non-preemptive activity splitting”, Computers and Operations Research, 53, 275–287.
- Doskocil, R. (2016), “ The level of use of project management methods, techniques and tools and their impact on project success - selected region of Czech Republic”, Periodica Polytechnica.Social and Management Sciences, 24(1), 14-24.
- Fonrouge, C., Bredillet, C. ve Fouché, C. (2018) “Entrepreneurship and project management relationships: So far so good? Dialogic conversation and Luhmannian perspective”, International Journal of Managing Projects in Business, https://doi.org/10.1108/ IJMPB-01-2018-0013
- Kolisch, R., ve Padman, R. (2001), “An integrated survey of deterministic project scheduling”, Omega, 29(3), 249-272.
Details
Primary Language
Turkish
Subjects
-
Journal Section
-
Authors
Aslı Aksoy
This is me
Canberk Atalay
This is me
Atalay Meriç Çamlıbel
This is me
Dilara Yaşar
This is me
Duygu Keseroğlu
This is me
Serdar Vanlıoğlu
This is me
Publication Date
June 1, 2019
Submission Date
-
Acceptance Date
-
Published in Issue
Year 2019 Volume: 8 Number: 1