TIME-BASED DEVELOPMENT PLANS FOR DISTRIBUTION NETWORKS IN THE PRESENCE OF DISTRIBUTED GENERATORS AND CAPACITOR BANKS

Volume: 4 Number: 4 November 7, 2020
EN

TIME-BASED DEVELOPMENT PLANS FOR DISTRIBUTION NETWORKS IN THE PRESENCE OF DISTRIBUTED GENERATORS AND CAPACITOR BANKS

Abstract

In this paper, a time-based model for distribution network development planning is proposed, considering the possibility of using distributed electricity generation technologies and the existence of capacitor banks. The proposed model specifies the location, capacity, and timing of the use of distributed generation technologies and capacitor banks as well as the schedule for increasing the capacity of the grid lines. The Genetic Enhanced Algorithm is used to solve the stated problem to optimize the network development plan including the time, location and capacity of DG and capacitor banks in the distribution network as well as to optimize the investment cost and operating cost. It was also implemented in a MATLAB programming environment to validate and evaluate the effectiveness of the proposed solution to the problem of distribution network development planning on a 17-bus radial distribution network.

Keywords

References

  1. PATRE, p., JOSHI, S. M., 2014, "Direct Model Reference Adaptive Control with Actuator Failures and Sensor Bias", Journal of Guidance, Control, and Dynamics, 37(1), 210-225
  2. RAHIMIYAN, M., RAJABI MASHHADI, H., 2010, “Evaluating the efficiency of divestiture policy in promoting competitiveness using an analytical method and agent-based computational economics,” Energy Policy, 38(3), 1588-1595
  3. PATRE, P., JOSHI, S. M., "Accommodating Sensor Bias in MRAC for State Tracking", PROC. AIAA Guidance, Naviageation, and Control Conference, Portland, OR, August 8-10, 2011.
  4. ALE, B. J. M., BELLAMY, L. J., COOPER, J., ABABEI, D., KUROWICKA, D., MORALES, O., SPOUGE, J., 2010, “Analysis of the Crash of TK 1951 Using CATS,” Reliability Engineering & System Safety, 95(5), 469–477
  5. BURKHOLDER, J., and TAO, G., 2011, “Adaptive Detection of Sensor Uncertainties and Failures,” Journal of Guidance, Control, and Dynamics. 34(6), 1605–1612
  6. TERESHKOV, V. M., 2012, “An Intuitive Approach to Inertial Sensor Bias Estimation,” Cornell University Library, 4, 33-41
  7. EL HALABI, N., GRACIA, M., BORROY, J., VILLA, J. L. Current phase comparison pilot scheme for distributed generation networks protection. Appl Energy 2011;88:4563–9.
  8. SEDGHI, M., ALIAKBAR-GOLKAR, M., HAGHIFAM, M. R. Distribution network expansion considering distributed generation and storage units using modified PSO algorithm. Elect Power Energy Syst 2013;52:221–30.

Details

Primary Language

English

Subjects

Engineering

Journal Section

Research Article

Publication Date

November 7, 2020

Submission Date

April 24, 2020

Acceptance Date

October 27, 2020

Published in Issue

Year 1970 Volume: 4 Number: 4

APA
Amouzad Mahdiraji, E. (2020). TIME-BASED DEVELOPMENT PLANS FOR DISTRIBUTION NETWORKS IN THE PRESENCE OF DISTRIBUTED GENERATORS AND CAPACITOR BANKS. Journal of Scientific Perspectives, 4(4), 245-254. https://doi.org/10.26900/jsp.4.021